2.4 KiB
Career/document publication and next owner gate
3 November 2026. Implementation 6f801251b0d44e0dfb18365ba3102a3d4d482313 on codex/a3-ui-06 was pushed successfully. Independent git ls-remote --heads origin refs/heads/codex/a3-ui-06 returned that exact commit. Committed source/evidence manifest verification matched all26 sources and151 evidence files with zero mismatches;80 static-export assets are separately hashed.
Local qualification:212 unique selected frontend cases/ten suites and103 isolated backend cases passed; types/full lint/build and final verifier lint/diff check passed. Full16-config browser matrix has96 axe scans; six EN/light boundary/focus configs have36 scans, four configs overlap,108 unique validated screenshots (plus one failed diagnostic PNG). All14 edit targets passed visible/unobscured focus at320/390/768/1000/1001/1440. Deliberate saves are intercepted fixtures only. Independent source review57 passing cases overlaps212; independent verifier review reconciled counts and fixture limits.
The original A3-IM06 implementation authorisation is satisfied within CAREER_VALIDATION.md's scope. Owner then explicitly answered "Approve Career/CV/letter and A3-IM07". Gate F is ACCEPTED; do not ask again. A3-IM07 Calendar/reminders/correspondence/documents is authorised, preserving closing-date provenance/precision/timezones, linked context, ICS/provider consent, attachment previews/downloads and mail conflicts/confirmed-send. Real provider activation remains separate. Earlier UI01–05 approvals remain accepted and must not be repeated.
Do not treat this as full Phase10, Product Review, European localisation, Global Jobs provider, import-engine, native-device, physical PDF, final integrated security or release acceptance. No main merge/deployment. Independent ca519cac date localisation and de3d5031 security policy remain isolated; no older workstream source was wholesale merged. The generated graph remains local and untracked.
Next independent eligible candidate while the owner reviews: reproduce and localise fixed-decimal attachment size presentation in the existing attachment owners on the separate localisation branch. Follow the existing number-formatting contract, preserve units/thresholds and unknown/zero semantics, test EN/NB, then reconcile that small patch before any A3 integration. Final integration of completed isolated patches requires combined checks.