Direct roadmap status
Updated 11 November 2026. This register records direct-chat work. See the continuation checkpoint for exact integration refs and evidence.
| Workstream/checkpoint | Status | Dependency and evidence |
|---|---|---|
| PHASE-10 / P10-00 assessment | COMPLETED | Report in ../redesign/phase-10/P10-00.md; assessment 7ba1367, publication receipts 8cdff28/1692142. Remote exactly 1692142295950e390a4cf807d9df86cc5cf96290 on 2 November |
| P10-01 / CLEAN-20 | VALIDATED AND PUBLISHED | Owner approved only the unused App.css removal. Source and receipt at 78f7396a. See P10-01 |
| P10-02 CV/documents | REVIEWED, RETAIN | Historical document and import compatibility kept. See P10-02 |
| P10-03 backend/dependencies/config | REVIEWED, RETAIN | No additional proven-safe removal. See P10-03 |
| P10-04 candidate functional/data verification | QUALIFIED WITH INHERITED LIMITS | Candidate checks and full local 1,448 backend/1,031 frontend receipts reconciled. Applicable historical source/environment evidence retained. Existing operational and human gates carry forward |
| P10-05 full acceptance | READY FOR OWNER REVIEW | Reviewed Conditional GO proposal, all57 preservation dispositions and Product Review handoff published at 59fd674f. D02 final milestone decision pending. See proposal |
| PRODUCT-REVIEW-01 | FINAL REVIEW BLOCKED | Final audit requires accepted Phase 10. Approved A3 work advances separately under the owner's direct authorisation |
| A3 UI/UX modernisation | IM10 IN PROGRESS | Published through511b68a1, count source44112c7c; export source2a02e102. Export lifetime:35 overlapping cases,12 configurations/36 native downloads/12 scans, build/lint passed. Prior correspondence/source-bound matrices retained. Rules/import/connected workflows, native/human and final Gate F remain open |
| INT-GLOBAL-JOBS-01 / GJ-00 | CONDITIONAL | Existing planning at 0ec9f98e6ed4a646fc5e017d8eb6fade07653f37; exact remote reverified 2 November. No implementation authorised |
| INT-GLOBAL-JOBS-01 implementation | BLOCKED | Accepted Phase 10/Product Review, initiative approval and provider rights |
| I18N-01 / I18N-00 audit | PARTIAL | All 188 historical dynamic call reviews accounted for in published 4172c23d. Full visible-text, native, market and European coverage remain open |
| I18N-01–08 implementation/acceptance | PARTIAL | Shared MUI/picker EN/NB defaults published through A3 e6240ad3. Live controls/drafts/theme verified in finite paired configurations. Legacy timestamp precision, broader visible-text/native review and additional locale publication remain open |
| LAUNCH-SITE-01 / LAUNCH-00 audit | PARTIAL | Design-neutral contracts at af8c48ce and rendered baseline reconciliation at 98483b80. Design research, asset rights and public claims remain open |
| LAUNCH-01 four desktop/mobile concepts | PUBLISHED FOR REVIEW | Gallery and eight rendered screenshots at ccb11494. 20 controlled browser checks passed |
| LAUNCH-SITE final design/implementation | AWAITING_APPROVAL | Owner selection or combination is next. Refine and obtain final design approval before application implementation |
| SECURITY-AUDIT-01 | OFFLINE PREFLIGHT PARTIAL | Approved root policy published at de3d5031. Formal integrated scan requires a completed application baseline and applicable environment/cost approval |
| RELEASE-READINESS-01 / discovery and RR-11–14 | PARTIAL | Release branche1c8e845 explicitly propagates prune/enumeration failures.16 backup and6 rollback offline methods plus syntax passed; root verified diff/ref/source receipts. Earlier parser/guards/probes retained. Real rollback/restore/off-host/release qualification remain open |
| Release stages 2–7 baseline, qualification, remediation, requalification, rehearsal, final acceptance | BLOCKED | Final release candidate/prerequisites not accepted; each stage needs actual applicable environment and source-bound evidence |
| PERF-01 / 18 performance areas | IN PROGRESS | A3 page query, Companies cache, rules freshness and locale request changes published through 1d733675. JobTable split trial remains isolated after a throttled phone regression. MariaDB plan/load validation blocked by unavailable local Docker engine |
Implemented, tested, accepted, published and production-ready are separate. Production is NO-GO. Historical counts are not fresh executions. See blockers, owner decisions, completed work and next actions.
11 November flat Edit Job continuation
- A3 published and remotely read back at
c172427fb21820084eb0b029178599c1f776edac. Presentation7bfebe88removes four decorative Edit Job panels and the raised intro; verifier552525dfadds tablet coverage. All fields, actions and revision/date payload contracts retained. - PASSED: 29 tests in three suites, build/TypeScript and scoped lint. Nine finite three-timezone desktop/tablet/mobile journeys passed 27 accessibility captures and 18 intercepted fixture writes; zero page errors/unavailable reads. Earlier six journeys overlap the final nine. Desktop/mobile/tablet screenshots inspected. 147 committed source/evidence/export bindings verified. See A3
docs/ui-modernisation/visual-correction/EDIT_DIALOG_FLAT_REVIEW.md. - V39 resolved within
/jobs; the 34-route/57-group inventory and final owner/human qualification remain open. Other shared MUI labels and legacy timestamp semantics remain independent tasks. Phase 10 D02, launch selection, providers, integrated security/recovery and release gates are unchanged.
EN/NB import/conversion singular feedback qualified through511b68a1:50 overlapping cases, two paired profiles/six native conversions/six scans. Broader localisation and native-language review remain open.