Files
jobtrackingapp/docs/work-programmes/session-handoff.md
T
cesnimda 998ee07a9a
CI and Deploy / test (pull_request) Failing after 2m55s
CI and Deploy / deploy (pull_request) Has been skipped
feat(notifications): open bell popover
2026-08-15 13:37:29 +02:00

3.1 KiB

JobTracker session handoff

Updated: 2026-08-15

  • Exact current task: continue JOBS-002 with real-browser workspace/table/theme/keyboard/history/error/long-content regression.
  • Last completed step: the header bell now opens a reusable anchored notification panel with read/dismiss/link/empty/error behavior; it no longer routes directly to Operations.
  • Files currently modified: notification model/popover/AppShell/App integration/tests/translations, Operations reuse and JOBS tracking.
  • Commands already run: notification/AppShell/Operations Jest 6/6 and production frontend build.
  • Test results: focused notification 6/6; focused JOBS frontend 8/8 and backend 9/9; production build passes. Repository-wide standalone TypeScript still reports pre-existing React Router test future props, one Testing Library option and ES target errors; application source added no error.
  • Services currently running: none on task-owned ports 3000/5202. Playwright stopped its disposable API/Next servers. Pre-existing Docker services were not changed.
  • Temporary files or processes: no task-owned process is running and the failed disposable migration database was removed. Existing synthetic browser evidence/account and startup-created local backup remain documented. No provider account, real email, private content, paid service or production service was accessed.
  • Production changes currently active: none. No deployment, migration, provider connection/sync/send or production payload occurred.
  • Rollback status: downgrade 20260810080858_AddEmailDraftClientRequestId, then 20260810075206_AddEmailDrafts, before reverting draft commits; then follow the existing MAIL rollback order (ee5ef7e, 449faeb, 123fc55/e9937ac, ledger downgrade before 653f011). No production migration/deploy/provider grant occurred.
  • Uncommitted changes: V-163 notification popover and tracking; no dependency/schema/config change.
  • Known failures: live deployment is not verified because PR deploy is intentionally skipped and the active branch is not approved for merge. Draft export/API/UI, full thread/category actions and non-Gmail review remain; existing accounts need re-consent and IMAP stays read-only. A clean full-chain SQLite apply fails in the pre-existing JT-019 migration before the new draft migration. Browser/provider/MariaDB/production unavailable or unverified; recovery scan performance is unmeasured at large ledger scale; Jest open handles; SEC-006 parser dependency work is still separately gated; parser isolation remains SEC-007.
  • Exact next action: commit/push V-163; run the JOBS-002 browser matrix and address evidence-backed defects.
  • Work that can continue independently: JOBS-002, PRODUCT-001 and VER-001. UX/JOBS production, MAIL provider mutations, SEC-006/007 and PROD packages retain their recorded external gates.
  • Decisions still required from the user: none for synthetic/code-inspected repository work. Any provider connection or send test, internet/package upgrades, private data, external/paid providers and production actions retain explicit approval/safety gates; SEC-009 retention/legal policy remains unresolved.