Files
jobtrackingapp/docs/work-programmes/session-handoff.md
T
cesnimda a25c31b93a
CI and Deploy / test (pull_request) Successful in 5m6s
CI and Deploy / deploy (pull_request) Has been skipped
feat(plans): publish honest Free and Pro
2026-08-15 18:04:18 +02:00

3.4 KiB

JobTracker session handoff

Updated: 2026-08-15

  • Exact current task: commit/push PRODUCT-001, then execute VER-001 full action-matrix and regression reconciliation.
  • Last completed step: replaced contradictory three-tier/fixed-price/Free-AI/unlimited claims with exactly Free/Pro, centralized public capability copy and reused dismissible contextual upgrade notices.
  • Files currently modified: plan catalogue, homepage, active AI notices, billing-state explanation, focused tests, product documentation and programme evidence.
  • Commands already run: PRODUCT frontend 30/30; policy/billing backend 30/30; full frontend 57 suites/232 tests; optimized build; full Playwright 8/8; claim searches and diff review.
  • Test results: all listed tests pass. Chromium covers exactly two plans, retired-claim absence, explicit light/dark, 375/768/1440 no-overflow and keyboard actions. Jest retains the documented force-exit/open-handle notice.
  • Services currently running: none on task-owned ports 3000/5202. Playwright stopped its disposable API/Next servers. Pre-existing Docker services were not changed.
  • Temporary files or processes: no task-owned process is running and the failed disposable migration database was removed. Existing synthetic browser evidence/account and startup-created local backup remain documented. No provider account, real email, private content, paid service or production service was accessed.
  • Production changes currently active: none. No deployment, migration, provider connection/sync/send or production payload occurred.
  • Rollback status: downgrade 20260810080858_AddEmailDraftClientRequestId, then 20260810075206_AddEmailDrafts, before reverting draft commits; then follow the existing MAIL rollback order (ee5ef7e, 449faeb, 123fc55/e9937ac, ledger downgrade before 653f011). No production migration/deploy/provider grant occurred.
  • Uncommitted changes: V-171 PRODUCT-001 presentation/documentation increment; no backend/dependency/schema/config/migration change. V-166 through V-170 are pushed as a6cffe0, f0b9b22, 3b86ea2, deed948 and a7c2549.
  • Known failures: live deployment is not verified because PR deploy is intentionally skipped and the active branch is not approved for merge. Draft export/API/UI, full thread/category actions and non-Gmail review remain; existing accounts need re-consent and IMAP stays read-only. A clean full-chain SQLite apply fails in the pre-existing JT-019 migration before the new draft migration. Browser/provider/MariaDB/production unavailable or unverified; recovery scan performance is unmeasured at large ledger scale; Jest open handles; SEC-006 parser dependency work is still separately gated; parser isolation remains SEC-007.
  • Exact next action: commit/push V-171, reconcile application-action-matrix.md against the current repository and run the complete local VER-001 gate set.
  • Work that can continue independently: VER-001 and tracking reconciliation. UX/JOBS/PRODUCT production, MAIL provider mutations, SEC-006/007 and PROD packages retain their recorded external gates.
  • Decisions still required from the user: none for synthetic/code-inspected repository work. Any provider connection or send test, internet/package upgrades, private data, external/paid providers and production actions retain explicit approval/safety gates; SEC-009 retention/legal policy remains unresolved.