3.5 KiB
3.5 KiB
JobTracker session handoff
Updated: 2026-08-10
- Exact current task: JOBS-002 — read Phase 11 and inventory the applications table, route-backed workspace, filters/history/focus/unsaved state and tests before editing.
- Last completed step: pushed
4e5ce0c; UX-003 now has required 1440/768/375 dark/light, browser pointer hover/drag and keyboard evidence after the root implementationfb6f17e. - Files currently modified: UX-003 tracking/decision/verification evidence only; application/tests/screenshots are committed.
- Commands already run: Phase 10 trace; failing pre-fix computed-color browser reproduction; iterative focused component/build/browser checks; screenshot inspection; full frontend/build and complete Playwright. See V-157.
- Test results: backend 631/631 (unchanged); frontend 50 suites and 204/204; Kanban component 7/7; Playwright 6/6 including Kanban 1440/768/375, dark/light, pointer/keyboard; production build passes. Jest retains its known force-exit/open-handle warning.
- Services currently running: none on task-owned ports 3000/5202. Playwright stopped its disposable API/Next servers. Pre-existing Docker services were not changed.
- Temporary files or processes: no task-owned process is running and the failed disposable migration database was removed. Existing synthetic browser evidence/account and startup-created local backup remain documented. No provider account, real email, private content, paid service or production service was accessed.
- Production changes currently active: none. No deployment, migration, provider connection/sync/send or production payload occurred.
- Rollback status: downgrade
20260810080858_AddEmailDraftClientRequestId, then20260810075206_AddEmailDrafts, before reverting draft commits; then follow the existing MAIL rollback order (ee5ef7e,449faeb,123fc55/e9937ac, ledger downgrade before653f011). No production migration/deploy/provider grant occurred. - Uncommitted changes: UX-003 closure/JOBS-002 transition tracking, decision, V-157 and verification document only; commit and push before JOBS-002 implementation.
- Known failures: live deployment is not verified because PR deploy is intentionally skipped and the active branch is not approved for merge. Draft export/API/UI, full thread/category actions and non-Gmail review remain; existing accounts need re-consent and IMAP stays read-only. A clean full-chain SQLite apply fails in the pre-existing JT-019 migration before the new draft migration. Browser/provider/MariaDB/production unavailable or unverified; recovery scan performance is unmeasured at large ledger scale; Jest open handles; SEC-006 parser dependency work is still separately gated; parser isolation remains SEC-007.
- Exact next action: read
docs/todo/work.mdPhase 11 and inspectJobTable,/jobsrouting,ApplicationWorkspacePage, filter persistence/deep links and existing tests; reproduce list-context loss and direct-route behavior before choosing the first increment. - Work that can continue independently: JOBS-002, PRODUCT-001 and VER-001. UX/JOBS production, MAIL provider mutations, SEC-006/007 and PROD packages retain their recorded external gates.
- Decisions still required from the user: none for synthetic/code-inspected repository work. Any provider connection or send test, internet/package upgrades, private data, external/paid providers and production actions retain explicit approval/safety gates; SEC-009 retention/legal policy remains unresolved.