Files
jobtrackingapp/docs/redesign/phase-7/p7-00/README.md
T

6.3 KiB

P7-00 — Fresh scope inventory and fixture baseline

Bounded scope: establish the approved remaining-migration inventory, initial preservation/debt records and reproducible baseline without changing application behavior. This checkpoint must be validated, committed, pushed and remotely verified before P7-01 page edits.

Recorded baseline and authority

Item Entry evidence
Development codex/ui-redesign-phase4; local HEAD and origin both b5319981ad3d1bd635daff861453d23c0de5320b in the read-only entry check
Production Local main/origin main both 27657f31131cd95d42f0e1290853ec9c9b3959a4; main unchanged by instruction. Local tracking equality is not a new live-remote claim
Application/build Phase 6 source bd47214bdcd74336788dca0f294b8ddb9403cac1; measured export 2LDblja_XnSBWSuY6ys_V
Phase 6 acceptance Final report, manifest, commit ledger; review/readiness CONDITIONAL GO, production NO-GO
Architecture/scope Original plan, Phase 3, approved exact handoff
Entry worktree No modified/untracked files in the initial read-only status; concurrent subsequent work is preserved
Preservation/routes All57:56 PARTIAL+1 DEFERRED(C11); all32 route inventory: exact existing App patterns, no invented destinations

The coordinator's fresh baseline records source identity, unchanged-source applicability and finite route/matrix evidence, with static outcomes added only after execution. Its canonical UTF-8 LF SHA256 at initial collection is 1c1ac4df1cd53f360ab7e3a1f6b169d68e03b9d95d47e966975372b2b12217fb; later evidence changes receive their own current identity. The documentation writer's local tracking check does not substitute for the coordinator's direct remote check.

Inherited runtime baseline

Lane Actual accepted Phase 6 execution Accounting limit
Backend full 1,033 passing Focused AI108 and CV revision5 are subsets, not additive
Frontend 521 passing /85 suites;0 failed/pending/todo Authoritative successor to Phase5's498/83; no new P7-00 cases
Ordinary native browser 159 passing;0 unexpected/skipped/flaky; every expected status passed once with retry0 Focused feedback4, modal4, semantics6/label2 and performance1 are subsets
Sidecar 49 passing Independent lane
Real HTTP / rate limits / ingress / PDF admission / diagnostics 2 /9 /6 /1 /3 passing Separate configured native lanes; local ingress is not deployed F04
Configuration / supply-chain / offline evaluation / extension 3 /3 /5 /3 passing Finite configuration/contract evidence
Original rendering fidelity 16 cases;36 preview=36PDF pages Original tolerances and corpus; local output qualification
Settings export fidelity 8 cases;24 preview=24PDF pages Same finite oracle; no production-font/photo claim
Types/lint/build/security/docs/whitespace Accepted Phase6 commands passing New P7-00 static identity/matrix/route evidence is recorded separately

Exact commands, environment, source/export identities, raw report hashes and failure history are in the Phase6 aggregate, backend manifest, ordinary portable report and fidelity verifier. P7-00 inherits these actual results at unchanged application/test scope; no fresh full runtime run is claimed. New affected tests begin in P7-01; fresh applicable full regression belongs to P7-12.

P2-D01 remains the ordinary passing frozen-workspace case, with the identifying source comment at102. Preserve native capture/readback, archived bytes, canonical/sibling isolation and original assertions; no skips or expected-failure replacement.

Findings and checkpoint changes

  • Inventory identifies completed shell, Jobs/Table/Board/Trash, Application workspace, Dashboard/Analytics and CV editor foundations so they are retained.
  • Remaining migrations use exact P7-00…P7-12 plus optional P7-06F from the approved handoff. No alternate information architecture or checkpoint numbering is introduced.
  • Preservation retains all original sub-capabilities and evidence limitations; debt records current Phase6 scoped feedback closures while keeping historical server/provider/manual/production obligations.
  • Existing route limitations remain visible: Board preserves query/hash/state; Application alias preserves query/state but not hash; correspondence-review alias replaces with fixed review query and does not forward incoming metadata.
  • No application, API, schema, provider, renderer, feature-gate, route or production change is part of P7-00.

Validation and outcome

Source inspection confirms exactly32 distinct concrete App paths matching the retained32-route census, no missing or additional route. The copied preservation IDs/statuses match the57-group Phase6 aggregate exactly. The fresh static record passes its four command checks, local-link/57-group/32-route reconciliation and finite secret/whitespace scope. Its initial collection reports7 Markdown files/258 local links/0errors and7 untracked files/0secret findings; the current record remains authoritative after final staging. This is static evidence, not a new runtime run or production acceptance.

Commit hash and direct remote push verification are recorded by the successor in COMMITS.md; this pre-commit document does not invent its own hash. Entry disposition is CONDITIONAL GO for bounded development migration, subject to completed P7-00 commit/push verification and the inherited gates. Production remains NO-GO.

Remaining work: execute P7-01 after this checkpoint is pushed; retain P7-06F/P5-13/optional preview and all applicable human/device/provider/output/production dependencies. A severe new shared defect blocks dependent propagation; independent unaffected work continues.