Files
jobtrackingapp/docs/direct-roadmap/NEXT_ACTIONS.md
T

2.1 KiB

Next eligible actions

10 November 2026.

  1. Continue P10-05 qualification on the frozen cleanup branch. CLEAN-20 is published. Reconcile full local regression, source-bound evidence and the 57 preservation groups. Further removal requires its own proven candidate and approval.
  2. Continue approved A3-IM10 from published aac0f3b3 on codex/a3-ui-10. Audit filters/details, compact Users/Application actions and Jobs/metrics integration have scoped evidence. Next are remaining correspondence/Settings/import states and real connected workflow evidence. Prepare final Gate F once the visual, workflow and regression evidence is reviewable.
  3. Continue independently eligible localisation on its isolated branch. The 188 historical dynamic calls are accounted for. Prioritise contextual display coverage and automated locale checks. Native and additional locale publication gates remain open.
  4. Four desktop/mobile launch concept pairs are published at ccb11494. Retain owner selection before refinement and final approval before implementation. RR-11 and scoped RR-12/13 offline checks/fixes are published through 24a62997. Actual recovery, integrated security and production remain separately gated.
  5. Keep Product Review findings provisional until Phase 10 acceptance. Reuse the published GJ-00 pack. GJ-01 awaits the accepted predecessors, implementation scope and provider rights.
  6. Continue PERF from the source census and comparable baseline. Reproduce and correct PERF-01-RULES stale settings reads in isolation, preserving owner/global fallback and measuring the query tradeoff. Carry the page correspondence delta into isolated MariaDB once the local engine is available. Keep the isolated JobTable split out of A3 until a revised strategy protects the throttled Jobs marker. Keep replica, CDN, production, migrations and protected removal gated.

Use the complete roadmap TODO, the latest checkpoint and branch-specific handoffs to resume. The orchestrator remains paused. Keep pre-p10-ux and unrelated work intact. Publication belongs on the relevant development branch.