3.2 KiB
3.2 KiB
JobTracker session handoff
Updated: 2026-08-10
- Exact current task: JOBS-002 — finish URL-owned list filters/sort/page, run full regression, commit/push, then trace and protect unsaved workspace edits.
- Last completed step: pushed
b67a531; V-160 direct query hydration, full frontend 207/207 and production build pass without new console warnings. - Files currently modified:
JobTable.tsx,application-workspace-overlay.test.tsx, JOBS-002 verification/tracking documents. - Commands already run: V-158/V-159 trace/focused/full/build; V-160 focused overlay/workflow, full frontend and production build/diff check.
- Test results: backend 631/631 unchanged; frontend 51 suites and 207/207; JOBS-002 URL-state focused 6/6; production build passes. Jest retains its known force-exit/open-handle notice.
- Services currently running: none on task-owned ports 3000/5202. Playwright stopped its disposable API/Next servers. Pre-existing Docker services were not changed.
- Temporary files or processes: no task-owned process is running and the failed disposable migration database was removed. Existing synthetic browser evidence/account and startup-created local backup remain documented. No provider account, real email, private content, paid service or production service was accessed.
- Production changes currently active: none. No deployment, migration, provider connection/sync/send or production payload occurred.
- Rollback status: downgrade
20260810080858_AddEmailDraftClientRequestId, then20260810075206_AddEmailDrafts, before reverting draft commits; then follow the existing MAIL rollback order (ee5ef7e,449faeb,123fc55/e9937ac, ledger downgrade before653f011). No production migration/deploy/provider grant occurred. - Uncommitted changes: JOBS-002 URL-owned search/status/company/location/follow-up/readiness/deleted/sort/page state, tests and tracking; no dependency/schema/config change.
- Known failures: live deployment is not verified because PR deploy is intentionally skipped and the active branch is not approved for merge. Draft export/API/UI, full thread/category actions and non-Gmail review remain; existing accounts need re-consent and IMAP stays read-only. A clean full-chain SQLite apply fails in the pre-existing JT-019 migration before the new draft migration. Browser/provider/MariaDB/production unavailable or unverified; recovery scan performance is unmeasured at large ledger scale; Jest open handles; SEC-006 parser dependency work is still separately gated; parser isolation remains SEC-007.
- Exact next action: review/stage/commit/push V-160; then inspect dirty state in cover letter/correspondence/AI section editors and add the smallest shared close/navigation guard.
- Work that can continue independently: JOBS-002, PRODUCT-001 and VER-001. UX/JOBS production, MAIL provider mutations, SEC-006/007 and PROD packages retain their recorded external gates.
- Decisions still required from the user: none for synthetic/code-inspected repository work. Any provider connection or send test, internet/package upgrades, private data, external/paid providers and production actions retain explicit approval/safety gates; SEC-009 retention/legal policy remains unresolved.