P10-05 — Acceptance reconciliation (OPEN)

2 November 2026. This is an acceptance work register, not final acceptance. P10-01 CLEAN-20 is the only implemented deletion. P10-02/03 retain reviews found no additional proven-safe candidate. No further cleanup is authorised or needed merely to populate a checkpoint.

Evidence applicability

Fresh integrity check at continuation from 2a4acc17: all 263 indexed TEST_EVIDENCE artifact hashes match; 1,279 application-source hashes match the accepted source-after manifest, with only the approved App.css absent and zero changed-file mismatches. Paths were resolved under the expected repository/evidence root before reading. This establishes historical source applicability, not fresh execution or a complete independent audit. New reports and native test artifacts are outside the application manifest.

Required area Evidence disposition Remaining limit
Cleanup eligibility CLEAN-20 blob/callers and narrow approval recorded in P10-00/01 No additional deletion proven
Frontend types/lint/build PASSED fresh for CSS deletion; P10-01 Full-suite execution is not represented by these checks
Focused browser EN/NB/theme/responsive PASSED five selected cases; P10-01 Canary is not full browser regression or device acceptance
Backend document/data contracts PASSED 89 selected cases; P10-04 Not complete backend regression
Frontend document workflows PASSED 92 selected tests; P10-04 Not complete frontend regression
Routes/capabilities Existing 34-route and 57-group reconciliation retained 56 PARTIAL / one DEFERRED is not 57 accepted groups; independent closure review pending
Historical CV/document/PDF Accepted source/fixture-bound evidence retained; affected document contracts freshly checked No fresh physical/PDF visual metric acceptance; unchanged metrics must not be reopened without affected change
Complete suites/browser contracts Historical evidence remains source-bound No fresh full-suite result in this cleanup branch; reviewer must reconcile required acceptance scope explicitly
MariaDB/migration rollback/restore Existing qualifications remain scoped Current independent environment and recovery qualification incomplete; no database migration added or executed
Sidecar/security/accessibility/hosted CI Existing limited evidence retained Full independent audit, actual plugin scans, integrated qualification, hosted/human/device gates remain open

Decisions

  • CLEAN-20 implementation: locally validated and published; no further code cleanup proposed.
  • Phase 10 completion: OPEN; full acceptance is not established by targeted counts or this report.
  • Redesign completion and post-redesign Product Review acceptance: OPEN; new full-application design also requires final owner approval.
  • Independent product/research/i18n/security offline work: may continue under the owner's direct parallel-work authorisation. Do not claim upstream acceptance or integrated release qualification for isolated branches.
  • Production release: NO-GO. No merge or deployment authorised.

Next: reconcile complete accepted suite evidence and remaining preservation-group qualifications, complete independent audit coverage, and record genuine reviewer/owner decisions. Keep active-host, provider, model, migration and paid-scan gates distinct from ordinary source review. Do not rerun thousands of unchanged tests solely as a restart demonstration. If a relevant implementation changes, refresh its affected checks and final integrated qualification accordingly.