3.5 KiB
Implementation Plan
Strategy
Do not rewrite the entire frontend in one uncontrolled change.
Use a phased migration with explicit checkpoints.
Phase 0 — Finish product functionality
Before the visual/UX redesign begins:
- finish current functional changes,
- avoid spending excessive time polishing legacy visual styling,
- stabilise backend/data-model behaviour,
- run tests,
- create a pre-redesign checkpoint.
Phase 1 — Audit
No broad design changes.
Inspect and document:
- frontend framework and build setup,
- current styling solution,
- component libraries,
- routing,
- state management,
- authentication,
- localisation,
- API integration,
- test setup,
- every current feature and workflow.
Deliverables:
- technical frontend audit,
- functionality inventory,
- route/page map,
- component inventory,
- risk list,
- proposed migration approach.
Phase 2 — Functional baseline
Add or improve regression coverage around critical workflows before changing them.
Deliverables:
- stable baseline tests,
- known failing tests documented,
- explicit protected-functionality checklist.
Phase 3 — UX architecture
Define the target product shell and information architecture.
Deliverables:
- sidebar structure,
- page hierarchy,
- route migration plan,
- job workflow,
- Career Profile workflow,
- CV workflow,
- dashboard architecture,
- contextual AI pattern,
- responsive interaction model.
Avoid large implementation until this architecture is coherent.
Phase 4 — Design system foundation
Implement shared tokens/components:
- colour tokens,
- typography,
- spacing,
- radii,
- shadows,
- motion,
- light/dark themes,
- form controls,
- buttons,
- tables,
- dialogs/drawers,
- empty/loading/error states,
- page layout primitives.
The agent may replace the current UI/component layer if doing so materially improves maintainability and consistency.
Phase 5 — Representative screens
Implement only the most representative areas first:
- App shell/sidebar
- Dashboard
- Jobs workspace
- Job detail
- CV builder
Use these to validate the design language before migrating the entire application.
Phase 6 — Review checkpoint
Before broad rollout, inspect:
- consistency,
- usability,
- density,
- dark mode,
- mobile,
- Norwegian localisation,
- AI patterns,
- component reuse,
- performance.
Fix system-level issues now rather than replicating them across every page.
Phase 7 — Full migration
Migrate remaining areas, including:
- authentication,
- onboarding,
- Career Profile,
- CV library,
- Documents,
- application/cover-letter workflows,
- Analytics,
- Notifications,
- Settings,
- Admin,
- error pages,
- empty states,
- remaining dialogs and forms.
Phase 8 — Dashboard customisation
Implement per-user dashboard configuration:
- visibility,
- ordering,
- resizing where supported,
- reset defaults,
- persistence.
Admin dashboard remains separate.
Phase 9 — QA
Run:
- automated regression tests,
- visual inspection,
- responsive inspection,
- keyboard/accessibility checks,
- English/Norwegian checks,
- light/dark checks,
- empty/large-data edge cases,
- document/CV pagination checks.
Phase 10 — Cleanup
Remove only genuinely obsolete legacy UI code after:
- confirming no route still uses it,
- confirming tests pass,
- confirming functionality inventory is satisfied.
Branching recommendation
Suggested:
- stable branch/tag:
pre-ui-redesign - working branch:
feature/ui-redesign
Use smaller commits grouped by system/component or migrated workflow.