fix(ui): clarify document errors and retain readable actions
This commit is contained in:
@@ -20,11 +20,13 @@ These findings were carried from implemented checkpoints and verified in source,
|
||||
## Execution boundaries
|
||||
|
||||
1. [Shared accessibility and forms](SHARED.md), including the paired translation foundation used by the following owners.
|
||||
2. [Generated-label localisation](LOCALISATION.md), preserving all stored metadata and user text; final hygiene/publication follows.
|
||||
3. Documents and error navigation follows separately, including CV history display in its existing owner.
|
||||
2. [Generated-label localisation](LOCALISATION.md), publishedab89b69; all stored metadata and user text preserved.
|
||||
3. [Documents and error navigation](ERRORS.md), including CV history display in its existing owner; final hygiene/publication follows.
|
||||
|
||||
The independently authorized release repair is separate: development `bba52af4b8724f1a5c74013ce1476a20ca3972c2` was pushed/directly verified18:05:08UTC. Main contains equivalent fixture/focus repair `3e1057d` and Qwen compatibility `f7dc22e`, normally pushed and directly verified20October18:05UTC. Run833 is testing; deployment/model activation are unverified. [Release evidence](../../../infrastructure/2026-10-20-browser-fixture-and-focus-contracts.md) retains run832's314passing/16failed/oneflaky outcome and the two demonstrated causes. No failed assertion was hidden or timeout relaxed.
|
||||
|
||||
## Acceptance boundaries
|
||||
|
||||
P7-11 implementation and publication are in progress. Full integrated acceptance belongs to P7-12. All57 preservation groups retain56 PARTIAL/C11 DEFERRED and33 routes; no capability or route is removed. Manual reader/device/software-keyboard/zoom, production output/provider, reliability and release requirements remain. P5-13 stays withheld; followMode remains deferred. No Phase8 implementation or new dashboard customization. Production readiness remains NO-GO independently of the owner's authorization to release main.
|
||||
P7-11 is implemented **CONDITIONAL GO**: shared d8c0187 and localisationab89b69 are published; final error-owner hygiene/publication follows. [Validation](evidence/validation.json) records full candidate frontend898/101, full unchanged backend1057 and offline sidecar56; late ARIA corrections also have direct/native proof. Final committed-source integrated acceptance belongs to P7-12. The14new frontend cases are6shared,3generated-label and5CV-entry/history/not-found; two new suites give101. Three new browser cases derive351/57files. Existing assertion changes and overlapping focused vectors do not inflate totals.
|
||||
|
||||
All57 preservation groups retain56 PARTIAL/C11 DEFERRED and33 routes; no capability or route is removed. Manual reader/device/software-keyboard/zoom, production output/provider, reliability and release requirements remain. P5-13 stays withheld; followMode remains deferred. No Phase8 implementation or new dashboard customization. Production readiness remains NO-GO independently of the owner's authorization to release main.
|
||||
|
||||
Reference in New Issue
Block a user