# Direct execution continuation
**P10-05 full local backend lane passed at source `39aac4f404cc19bead83b719fbf372de87f965ff`.** 1,448 passed, zero failed or skipped, Release build and pinned SDK 9.0.317. Native receipt and scope in [P10-05](../redesign/phase-10/P10-05.md). The live AI/corpus lane was excluded. The full frontend suite was started separately on the same unchanged product source. Its native report is pending at this checkpoint. Phase 10 acceptance and independent audit remain open.
**Published A3-IM10 checkpoint `71c927b15bdea7c41d76dee084baf05af6f703cd`**, independently matched on `codex/a3-ui-10`. Runtime `c7e8627ca782b37ed553299a1db93af192e420e4` removes duplicate headings across four Admin routes. 66 targeted Jest tests, type-checking, lint, build, 36 controlled configurations and 324 browser captures/axe scans passed. No writes, export requests, page errors or axe violations. The 144 intentional System 503s and 216 unavailable company reads are recorded separately. 1,472 committed/source/export checks passed. See `ADMIN_HEADINGS_REVIEW.md`. The 768 px Bokmål audit screenshot exposed separate timestamp wrapping, tracked as V25. Remaining Admin action/error/permission states are open.
**Published integration checkpoint `e585561a02f559ddd03c83dd1602173602c654cf`**, branch `codex/a3-ui-10`, independently matched by `git ls-remote`. This supersedes the publication blocker below and includes the preceding CV commits. Follow-up runtime `c0ef4171d5451abfeba09321990380c395728c20` refreshes Calendar Agenda after a successful reminder write and retains the selected month/view. A failed write leaves the agenda intact. Passed 23 targeted native tests, typecheck, lint, export build, and 8 controlled status-to-follow-up journeys across phone/desktop, EN/NB and light/dark. The 48 captured states had zero axe violations, page errors or unexpected writes. The 16 writes were intercepted fixtures. All 1,423 source, evidence and export integrity checks passed. See `FOLLOWUP_JOURNEY_REVIEW.md`. No live calendar, interview scheduling or timezone-provenance qualification.
Next authorised scope is A3-IM10 Admin heading consolidation (V21), then remaining Settings, import and correspondence state review. Phase 10 acceptance, final A3 owner review, native/device, European localisation, integrated security/recovery and release gates remain open.
+7 -8
View File
@@ -1,12 +1,11 @@
# Next eligible actions
2 November 2026.
9 November 2026.
1. D01/CLEAN-20 is presented in chat and awaits precise owner approval. Do not delete `App.css` beforehand. When approved, recheck source identity and perform only its documented implementation/verification/publication scope.
2. Continue I18N-00 in `C:/Users/Connor/.codex/worktrees/i18n-00-audit/Job tracker` at `55adc1db`: follow `docs/i18n/00/HANDOFF.md`. Resolve the remaining 80 dynamic calls and computed/frontend/backend text, real translator context/sensitivity, territory legal records and library compatibility. This is eligible research, not an external blocker.
3. Continue LAUNCH-00/01 in `C:/Users/Connor/.codex/worktrees/launch-site-planning/Job tracker` at `756ab616`: rendered homepage/signup audit, pattern research, genuine synthetic captures, then four actual desktop/mobile concepts. No final design choice or implementation before owner review.
4. Continue release Stage 1 in `C:/Users/Connor/.codex/worktrees/release-readiness-discovery/Job tracker` at `653f8d04`: complete endpoint/environment/failure-boundary census; recovery source inspection and rehearsal specification are now saved. Do not rerun unchanged full suites or touch live services.
5. Provisional independent Product Review research is eligible, but must remain clearly provisional until accepted Phase 10. Existing GJ-00 publication is verified; reuse its 23-document planning pack and frozen subordinate prompts rather than recreating it. GJ-01 implementation remains blocked.
6. After each completed independent task, update blockers and identify newly eligible work. Unaccepted research cannot satisfy a prerequisite requiring accepted implementation. The session has unfinished eligible work; this checkpoint is not an exhaustion-of-roadmap declaration.
1. Continue P10-05 qualification on the frozen cleanup branch. CLEAN-20 is published. Reconcile full local regression, source-bound evidence and the 57 preservation groups. Further removal requires its own proven candidate and approval.
2. Continue approved A3-IM10 on `codex/a3-ui-10`. Use the route and discrepancy registers for correspondence, Settings, import and admin states. Prepare final Gate F once visual, workflow and regression evidence is reviewable.
3. Continue independently eligible localisation on its isolated branch. The 188 historical dynamic calls are accounted for. Prioritise contextual display coverage and automated locale checks. Native and additional locale publication gates remain open.
4. Continue design-neutral launch preparation and eligible offline security/recovery work on their existing branches. RR-11 is fixed and tested offline. Preserve launch design/claims decisions, integrated security scope, and approved recovery environment requirements.
5. Keep Product Review findings provisional until Phase 10 acceptance. Reuse the published GJ-00 pack. GJ-01 awaits the accepted predecessors, implementation scope and provider rights.
Use `ROADMAP_STATUS.md` and the branch-specific handoffs to resume. Never use the autonomous backlog orchestrator. Keep pre-p10-ux and unrelated work intact; no main merge or production deployment. Git is currently operational; avoid repeating the resolved server investigation.
Use [the latest checkpoint](LATEST_CHECKPOINT.md) and branch-specific handoffs to resume. The orchestrator remains paused. Keep pre-p10-ux and unrelated work intact. Publication belongs on the relevant development branch.
+13 -12
View File
@@ -1,25 +1,26 @@
# Direct roadmap status
Updated 2 November 2026. This is documentation, not an executable queue. The Continuous Progress Addendum controls direct-chat work; the autonomous orchestrator remains paused and untouched.
Updated 9 November 2026. This register records direct-chat work. See [the continuation checkpoint](LATEST_CHECKPOINT.md) for exact integration refs and evidence.
| Workstream/checkpoint | Status | Dependency and evidence |
| --- | --- | --- |
| PHASE-10 / P10-00 assessment | COMPLETED | Report in `../redesign/phase-10/P10-00.md`; assessment `7ba1367`, publication receipts `8cdff28`/`1692142`. Remote exactly `1692142295950e390a4cf807d9df86cc5cf96290` on 2 November |
| P10-01 / CLEAN-20 | AWAITING_APPROVAL | Delete only unused `job-tracker-ui/src/App.css`; precise owner decision D01 below. Addendum explicitly withholds implementation |
| P10-02 CV/documents | BLOCKED | Preceding cleanup checkpoint and any exact candidate approval; retain historical documents |
| P10-03 backend/dependencies/config | BLOCKED | Predecessors; no proven removal currently approved |
| P10-04 functional/data verification | BLOCKED | Defined and accepted cleanup scope; fresh affected verification required |
| P10-05 full acceptance | BLOCKED | P10-01–04 and complete applicable acceptance programme |
| PRODUCT-REVIEW-01 | BLOCKED | Final audit requires accepted Phase 10. Provisional independent research is eligible; not yet performed or substituted for final acceptance |
| P10-01 / CLEAN-20 | VALIDATED AND PUBLISHED | Owner approved only the unused `App.css` removal. Source and receipt at `78f7396a`. See [P10-01](../redesign/phase-10/P10-01.md) |
| P10-02 CV/documents | REVIEWED, RETAIN | Historical document and import compatibility kept. See [P10-02](../redesign/phase-10/P10-02.md) |
| P10-03 backend/dependencies/config | REVIEWED, RETAIN | No additional proven-safe removal. See [P10-03](../redesign/phase-10/P10-03.md) |
| P10-04 functional/data verification | PARTIAL | 103 distinct historical backend cases and 92 frontend tests reconciled. Environment and recovery limits in [P10-04](../redesign/phase-10/P10-04.md) |
| P10-05 full acceptance | OPEN | Full local backend passed 1,448 tests. Frontend run, independent audit and preservation closure tracked in [P10-05](../redesign/phase-10/P10-05.md) |
| PRODUCT-REVIEW-01 | FINAL REVIEW BLOCKED | Final audit requires accepted Phase 10. Approved A3 work advances separately under the owner's direct authorisation |
| A3 UI/UX modernisation | IM10 IN PROGRESS | Owner approved IM09 and IM10. Visual comparison, outstanding route states, combined qualification and final Gate F remain open |
| INT-GLOBAL-JOBS-01 / GJ-00 | CONDITIONAL | Existing planning at `0ec9f98e6ed4a646fc5e017d8eb6fade07653f37`; exact remote reverified 2 November. No implementation authorised |
| INT-GLOBAL-JOBS-01 implementation | BLOCKED | Accepted Phase 10/Product Review, initiative approval and provider rights |
| I18N-01 / I18N-00 audit | IN_PROGRESS | Partial source-bound audit published at `55adc1dbd742a570d55d3a4d13f5613a7ed2ab25`; 3,119 messages, 60 planned locale candidates; 108 conditional calls resolved, 80 remain. Contextual/legal/library review incomplete |
| I18N-01–08 implementation/acceptance | BLOCKED | I18N-00 and stage prerequisites plus documented implementation authority; no locale publication approved |
| LAUNCH-SITE-01 / LAUNCH-00 audit | IN_PROGRESS | Source audit and claim boundaries published at `756ab616a22746a9bafa9830afd4f8efbb085794`; rendered audit still pending |
| I18N-01 / I18N-00 audit | PARTIAL | All 188 historical dynamic call reviews accounted for in published `4172c23d`. Full visible-text, native, market and European coverage remain open |
| I18N-01–08 implementation/acceptance | PARTIAL | Bounded EN/NB improvements tested and published. Later stage prerequisites, native review and additional locale publication remain separate |
| LAUNCH-SITE-01 / LAUNCH-00 audit | PARTIAL | Design-neutral content, locale and crawlable HTML/SEO contracts published at `af8c48ce`. Rendered design and public claims decisions remain open |
| LAUNCH-01 four desktop/mobile concepts | PENDING | No viewable concepts produced; eligible independent task after completing audit inputs |
| LAUNCH-SITE final design/implementation | AWAITING_APPROVAL | Four concrete concepts must be delivered before owner selection; no final design auto-selection |
| SECURITY-AUDIT-01 / stages 00–16 | BLOCKED | Master begins `DO NOT START THIS NOW!` and requires finished feature development/baseline tests; README's immediate-review wording does not silently override that gate. No formal scan started |
| RELEASE-READINESS-01 / Stage 1 discovery | IN_PROGRESS | Preliminary inventory, blocker reconciliation and 18-gate matrix published at `653f8d04d469dcd52c883d4b98bea76b8adacada`; five runner guards and four workflow guards passed in separate checks; recovery review and RR-11 reproduction saved; full discovery incomplete |
| SECURITY-AUDIT-01 | OFFLINE PREFLIGHT PARTIAL | Approved root policy published at `de3d5031`. Formal integrated scan requires a completed application baseline and applicable environment/cost approval |
| RELEASE-READINESS-01 / discovery and RR-11 | PARTIAL | Parser fix `f19e7ebf` published with 31 offline tests. RR-12/13 still require isolated rollback, restore and off-host encryption evidence |
| Release stages 2–7 baseline, qualification, remediation, requalification, rehearsal, final acceptance | BLOCKED | Final release candidate/prerequisites not accepted; each stage needs actual applicable environment and source-bound evidence |
Implemented, tested, accepted, published and production-ready are separate. Production is NO-GO. Historical counts are not fresh executions. See [blockers](BLOCKERS.md), [owner decisions](OWNER_DECISIONS.md), [completed work](WORK_COMPLETED.md) and [next actions](NEXT_ACTIONS.md).
+6
View File
@@ -1,5 +1,11 @@
# P10-05 — Acceptance reconciliation (OPEN)
## 9 November 2026 full local backend regression
**PASSED 1,448 of 1,448 tests**, zero failed or skipped, native exit 0. Built and ran the full `JobTrackerApi.Tests` Release project from `39aac4f404cc19bead83b719fbf372de87f965ff` with the pinned local .NET SDK 9.0.317 and `--no-restore`. Comparison with accepted handoff `5cb903b989742b7a96cb22ddf4c0e24993b18980` found only the approved `App.css` deletion in the compared backend, frontend, test, sidecar and dependency inputs. [Native TRX](p10-04-evidence/full-backend-2026-11-09.trx.gz), SHA-256 of uncompressed bytes `8666e3ed7b98bf3ac37b1b2c4305189bc43f340476471d9efcf579ea59ed34e8`.
The corpus harness returned without opening source documents because its configured disposable corpus path did not exist. Live AI access was disabled. The suite's local fixtures do not qualify an actual corpus, MariaDB, migration recovery, physical PDF metrics, provider access, hosted CI or production. The 103 selected backend cases below are historical coverage and are not added to the full-run total.
3 November2026 reconciliation: parsed all four retained backend TRX artifacts and the frontend native JSON. **103 distinct historical backend cases**, zero case overlap/failure/skip; **92 historical frontend tests/5 suites** passed. [Machine reconciliation](p10-04-evidence/EVIDENCE_RECONCILIATION.json) retains uncompressed artifact hashes and counters. This is fresh evidence inspection, not fresh test execution. Application source under job-tracker-ui/src, JobTrackerApi and tools has no diff from the published cleanup checkpoint78f7396a to this branch's current documentation checkpoints.
Final A3 design/implementation approval is now received; dashboard and navigation milestone reviews are also accepted. A3 application-tracking implementation98e9502a is published separately and awaits its own Gate F. None of those UI branches, independent localisation fixes, or their selected test counts is integrated into this frozen cleanup branch or substituted for complete Phase10 qualification. Independent audit/preservation closure and the required environment/human qualifications remain open.