test(phase10): qualify complete offline backend regression
This commit is contained in:
@@ -1,5 +1,9 @@
|
||||
# Direct execution continuation
|
||||
|
||||
**P10-05 full local backend lane passed at source `39aac4f404cc19bead83b719fbf372de87f965ff`.** 1,448 passed, zero failed or skipped, Release build and pinned SDK 9.0.317. Native receipt and scope in [P10-05](../redesign/phase-10/P10-05.md). The live AI/corpus lane was excluded. The full frontend suite was started separately on the same unchanged product source. Its native report is pending at this checkpoint. Phase 10 acceptance and independent audit remain open.
|
||||
|
||||
**Published A3-IM10 checkpoint `71c927b15bdea7c41d76dee084baf05af6f703cd`**, independently matched on `codex/a3-ui-10`. Runtime `c7e8627ca782b37ed553299a1db93af192e420e4` removes duplicate headings across four Admin routes. 66 targeted Jest tests, type-checking, lint, build, 36 controlled configurations and 324 browser captures/axe scans passed. No writes, export requests, page errors or axe violations. The 144 intentional System 503s and 216 unavailable company reads are recorded separately. 1,472 committed/source/export checks passed. See `ADMIN_HEADINGS_REVIEW.md`. The 768 px Bokmål audit screenshot exposed separate timestamp wrapping, tracked as V25. Remaining Admin action/error/permission states are open.
|
||||
|
||||
**Published integration checkpoint `e585561a02f559ddd03c83dd1602173602c654cf`**, branch `codex/a3-ui-10`, independently matched by `git ls-remote`. This supersedes the publication blocker below and includes the preceding CV commits. Follow-up runtime `c0ef4171d5451abfeba09321990380c395728c20` refreshes Calendar Agenda after a successful reminder write and retains the selected month/view. A failed write leaves the agenda intact. Passed 23 targeted native tests, typecheck, lint, export build, and 8 controlled status-to-follow-up journeys across phone/desktop, EN/NB and light/dark. The 48 captured states had zero axe violations, page errors or unexpected writes. The 16 writes were intercepted fixtures. All 1,423 source, evidence and export integrity checks passed. See `FOLLOWUP_JOURNEY_REVIEW.md`. No live calendar, interview scheduling or timezone-provenance qualification.
|
||||
|
||||
Next authorised scope is A3-IM10 Admin heading consolidation (V21), then remaining Settings, import and correspondence state review. Phase 10 acceptance, final A3 owner review, native/device, European localisation, integrated security/recovery and release gates remain open.
|
||||
|
||||
Reference in New Issue
Block a user