docs(phase10): record blocked checkpoint publication
This commit is contained in:
@@ -1,6 +1,7 @@
|
||||
## Direct Phase 10 — 2 November 2026
|
||||
|
||||
- [x] P10-00: preserve/review the staged draft, verify baseline/evidence applicability and complete the [direct assessment](../redesign/phase-10/P10-00.md).
|
||||
- [ ] Publication gate: local assessment `7ba1367` push was rejected by a Gitea pre-receive SIGSEGV. Await operator resolution, then normal push and exact readback; no hook bypass or server repair in this task.
|
||||
- [ ] Owner gate: explicit approval of P10-01/CLEAN-20 only (`job-tracker-ui/src/App.css`), with the assessment's exact verification/rollback boundaries.
|
||||
- [ ] After approval only: implement and qualify that candidate; commit, publish and independently verify the checkpoint. Stop at subsequent candidate/entry gates.
|
||||
- [ ] P10-02–05 and later roadmap: preserve contracts and follow authoritative order from [continuity](../redesign/phase-10/HANDOFF.md). No later implementation is currently authorised.
|
||||
|
||||