docs(acceptance): record final regression and conditional Phase 6 handoff
This commit is contained in:
@@ -1,8 +1,10 @@
|
||||
# P5-15 — readiness debt and operator exit proof
|
||||
|
||||
## Current continuous acceptance successor
|
||||
## Current final scoped acceptance successor
|
||||
|
||||
The owner's latest instruction authorises continuous bounded repairs and independent acceptance work through Phase 6 preparation; earlier checkpoint stop instructions remain historical. [Native file selection](p5-15-04/file-picker/README.md), [hidden preview layout](p5-15-04/mobile-preview/README.md), [drawer focus](p5-15-04/mobile-drawer/README.md), [source navigation](p5-15-04/source-navigation/README.md) and [report targets](p5-15-04/report-targets/README.md) are separately repaired, validated and pushed. Their original 02 failures are retained, not relabeled as passes. [CV/document qualification](p5-15-03/README.md) is conditional for its measured local scope. Full post-change regression is in progress.
|
||||
The owner's latest instruction authorises continuous bounded repairs and independent acceptance work through Phase 6 preparation; earlier checkpoint stop instructions remain historical. [Native file selection](p5-15-04/file-picker/README.md), [hidden preview layout](p5-15-04/mobile-preview/README.md), [drawer focus](p5-15-04/mobile-drawer/README.md), [source navigation](p5-15-04/source-navigation/README.md) and [report targets](p5-15-04/report-targets/README.md) are separately repaired, validated and pushed. Their original 02 failures are retained, not relabeled as passes. [CV/document qualification](p5-15-03/README.md) is conditional for its measured local scope. [Final native/automated regression](p5-15-06/README.md) passes:1,033backend/498frontend/148browser/3diagnostics, unchanged revision/fidelity/security gates. Implemented scope is CONDITIONAL GO for Phase6 planning; original full scope is NOT COMPLETE and production remains NO-GO.
|
||||
|
||||
Fresh312axe scans contain39all-enabled violation-node occurrences and2,367incomplete occurrences; contextual semantic/contrast/name triage and human acceptance stay open. Twelve concurrent preference rounds did not reproduce the historical500s; their cause and suppressed language-save error path are not declared repaired. Native Board200/1,000 exact membership and finite local timings do not close O(N) capacity/native-touch qualification. [Successor dispositions](p5-15-04/DEBT_DISPOSITION.md) and the [intermittent register](p5-15-01/INTERMITTENT_FAILURES.md) preserve those obligations.
|
||||
|
||||
The 57-group matrix now records **0 PASS / 56 PARTIAL / 0 FAIL / 1 DEFERRED =57**. Whole-group acceptance remains incomplete. Postponed human screen-reader acceptance is **NOT COMPLETE / NOT VERIFIED**; physical devices/software keyboards, incomplete axe triage and deployed font/portrait qualification remain open. P5-13 remains deferred/unqualified/Production-withheld, 0/366 calls, no human semantic review or review UI. P5-05 and followMode reviewed compose remain explicitly deferred.
|
||||
|
||||
|
||||
Reference in New Issue
Block a user