feat(notifications): open bell popover
CI and Deploy / test (pull_request) Failing after 2m55s
CI and Deploy / deploy (pull_request) Has been skipped

This commit is contained in:
cesnimda
2026-08-15 13:37:29 +02:00
parent 109745edb0
commit 998ee07a9a
13 changed files with 321 additions and 32 deletions
+7 -7
View File
@@ -2,17 +2,17 @@
Updated: 2026-08-15
- **Exact current task:** continue JOBS-002; implement the top notification popover, then complete browser regression for the dedicated application workspace.
- **Last completed step:** canonical `/jobs/:id`, compact whole-row navigation, richer job details, route compatibility, contextual workflow links and sidebar cleanup passed focused tests.
- **Files currently modified:** JOBS-002 API aggregate, workspace/list/routes/tests and tracking documents.
- **Commands already run:** workspace/table/workflow Jest 8/8; ApplicationWorkspace backend 9/9; production frontend build; standalone `tsc --noEmit` baseline audit.
- **Test results:** focused JOBS frontend 8/8 and backend 9/9; production build passes. Repository-wide standalone TypeScript still reports pre-existing React Router test `future` props, one Testing Library option and ES target errors; application source added no error.
- **Exact current task:** continue JOBS-002 with real-browser workspace/table/theme/keyboard/history/error/long-content regression.
- **Last completed step:** the header bell now opens a reusable anchored notification panel with read/dismiss/link/empty/error behavior; it no longer routes directly to Operations.
- **Files currently modified:** notification model/popover/AppShell/App integration/tests/translations, Operations reuse and JOBS tracking.
- **Commands already run:** notification/AppShell/Operations Jest 6/6 and production frontend build.
- **Test results:** focused notification 6/6; focused JOBS frontend 8/8 and backend 9/9; production build passes. Repository-wide standalone TypeScript still reports pre-existing React Router test `future` props, one Testing Library option and ES target errors; application source added no error.
- **Services currently running:** none on task-owned ports 3000/5202. Playwright stopped its disposable API/Next servers. Pre-existing Docker services were not changed.
- **Temporary files or processes:** no task-owned process is running and the failed disposable migration database was removed. Existing synthetic browser evidence/account and startup-created local backup remain documented. No provider account, real email, private content, paid service or production service was accessed.
- **Production changes currently active:** none. No deployment, migration, provider connection/sync/send or production payload occurred.
- **Rollback status:** downgrade `20260810080858_AddEmailDraftClientRequestId`, then `20260810075206_AddEmailDrafts`, before reverting draft commits; then follow the existing MAIL rollback order (`ee5ef7e`, `449faeb`, `123fc55`/`e9937ac`, ledger downgrade before `653f011`). No production migration/deploy/provider grant occurred.
- **Uncommitted changes:** V-162 dedicated job workspace/list/sidebar increment and tracking; no dependency/schema/config change.
- **Uncommitted changes:** V-163 notification popover and tracking; no dependency/schema/config change.
- **Known failures:** live deployment is not verified because PR deploy is intentionally skipped and the active branch is not approved for merge. Draft export/API/UI, full thread/category actions and non-Gmail review remain; existing accounts need re-consent and IMAP stays read-only. A clean full-chain SQLite apply fails in the pre-existing JT-019 migration before the new draft migration. Browser/provider/MariaDB/production unavailable or unverified; recovery scan performance is unmeasured at large ledger scale; Jest open handles; SEC-006 parser dependency work is still separately gated; parser isolation remains SEC-007.
- **Exact next action:** commit/push V-162; add the bell notification popover without removing the Operations page.
- **Exact next action:** commit/push V-163; run the JOBS-002 browser matrix and address evidence-backed defects.
- **Work that can continue independently:** JOBS-002, PRODUCT-001 and VER-001. UX/JOBS production, MAIL provider mutations, SEC-006/007 and PROD packages retain their recorded external gates.
- **Decisions still required from the user:** none for synthetic/code-inspected repository work. Any provider connection or send test, internet/package upgrades, private data, external/paid providers and production actions retain explicit approval/safety gates; SEC-009 retention/legal policy remains unresolved.