feat(plans): publish honest Free and Pro
CI and Deploy / test (pull_request) Successful in 5m6s
CI and Deploy / deploy (pull_request) Has been skipped

This commit is contained in:
cesnimda
2026-08-15 18:04:18 +02:00
parent a7c25499bb
commit a25c31b93a
26 changed files with 403 additions and 93 deletions
+8 -8
View File
@@ -2,17 +2,17 @@
Updated: 2026-08-15
- **Exact current task:** start PRODUCT-001 claim inventory after committing/pushing the completed cross-application accessibility increment.
- **Last completed step:** named all icon controls, made CV cards keyboard-operable, preserved/scaled the full A4 public-CV viewport on mobile and added real dark-Alert contrast proof.
- **Files currently modified:** focused frontend accessibility semantics, public-CV responsive rendering, unit/Chromium regressions and programme evidence.
- **Commands already run:** accessibility-focused frontend 9/9; full frontend 54 suites/228 tests; optimized build; full Playwright 7/7; final targeted workspace/public-CV Chromium 2/2; static icon-control audit and diff review.
- **Test results:** all repository tests listed above pass. Chromium measures dark Alert contrast at WCAG AA, proves the public CV has no inner or outer overflow at 375px, and retains the prior workspace light/dark/history/focus evidence. Jest retains the documented force-exit/open-handle notice.
- **Exact current task:** commit/push PRODUCT-001, then execute VER-001 full action-matrix and regression reconciliation.
- **Last completed step:** replaced contradictory three-tier/fixed-price/Free-AI/unlimited claims with exactly Free/Pro, centralized public capability copy and reused dismissible contextual upgrade notices.
- **Files currently modified:** plan catalogue, homepage, active AI notices, billing-state explanation, focused tests, product documentation and programme evidence.
- **Commands already run:** PRODUCT frontend 30/30; policy/billing backend 30/30; full frontend 57 suites/232 tests; optimized build; full Playwright 8/8; claim searches and diff review.
- **Test results:** all listed tests pass. Chromium covers exactly two plans, retired-claim absence, explicit light/dark, 375/768/1440 no-overflow and keyboard actions. Jest retains the documented force-exit/open-handle notice.
- **Services currently running:** none on task-owned ports 3000/5202. Playwright stopped its disposable API/Next servers. Pre-existing Docker services were not changed.
- **Temporary files or processes:** no task-owned process is running and the failed disposable migration database was removed. Existing synthetic browser evidence/account and startup-created local backup remain documented. No provider account, real email, private content, paid service or production service was accessed.
- **Production changes currently active:** none. No deployment, migration, provider connection/sync/send or production payload occurred.
- **Rollback status:** downgrade `20260810080858_AddEmailDraftClientRequestId`, then `20260810075206_AddEmailDrafts`, before reverting draft commits; then follow the existing MAIL rollback order (`ee5ef7e`, `449faeb`, `123fc55`/`e9937ac`, ledger downgrade before `653f011`). No production migration/deploy/provider grant occurred.
- **Uncommitted changes:** V-170 accessibility/responsive-public-CV increment; no dependency/schema/config/migration change. V-166 through V-169 are pushed as `a6cffe0`, `f0b9b22`, `3b86ea2` and `deed948`.
- **Uncommitted changes:** V-171 PRODUCT-001 presentation/documentation increment; no backend/dependency/schema/config/migration change. V-166 through V-170 are pushed as `a6cffe0`, `f0b9b22`, `3b86ea2`, `deed948` and `a7c2549`.
- **Known failures:** live deployment is not verified because PR deploy is intentionally skipped and the active branch is not approved for merge. Draft export/API/UI, full thread/category actions and non-Gmail review remain; existing accounts need re-consent and IMAP stays read-only. A clean full-chain SQLite apply fails in the pre-existing JT-019 migration before the new draft migration. Browser/provider/MariaDB/production unavailable or unverified; recovery scan performance is unmeasured at large ledger scale; Jest open handles; SEC-006 parser dependency work is still separately gated; parser isolation remains SEC-007.
- **Exact next action:** commit/push V-170, inventory Free/Pro claims and implement the supported PRODUCT-001 surface without invented commercial terms.
- **Work that can continue independently:** PRODUCT-001, VER-001 and tracking reconciliation. UX/JOBS production, MAIL provider mutations, SEC-006/007 and PROD packages retain their recorded external gates.
- **Exact next action:** commit/push V-171, reconcile `application-action-matrix.md` against the current repository and run the complete local VER-001 gate set.
- **Work that can continue independently:** VER-001 and tracking reconciliation. UX/JOBS/PRODUCT production, MAIL provider mutations, SEC-006/007 and PROD packages retain their recorded external gates.
- **Decisions still required from the user:** none for synthetic/code-inspected repository work. Any provider connection or send test, internet/package upgrades, private data, external/paid providers and production actions retain explicit approval/safety gates; SEC-009 retention/legal policy remains unresolved.