docs(roadmap): record flat edit dialog qualification

This commit is contained in:
cesnimda
2026-11-11 13:17:58 +01:00
parent f00ce919b2
commit bd49f80931
5 changed files with 30 additions and 1 deletions
+7
View File
@@ -30,3 +30,10 @@ Earlier rows below retain historical dates. The current TODO and checkpoints sup
I18N progress: 108/188 dynamic calls resolved to finite literal branches; 240 existing-key references validated; 80 calls remain. Four direct reads and 26 reviewed JSX/accessibility candidates recorded. These are inventory counts, not translation completeness or runtime test passes.
Earlier homepage and qualification findings remain in their branch reports. Add new findings with stable IDs and evidence status; do not rediscover unchanged items on each continuation.
## 11 November flat Edit Job continuation
- A3 published and remotely read back at `c172427fb21820084eb0b029178599c1f776edac`. Presentation `7bfebe88` removes four decorative Edit Job panels and the raised intro; verifier `552525df` adds tablet coverage. All fields, actions and revision/date payload contracts retained.
- PASSED: 29 tests in three suites, build/TypeScript and scoped lint. Nine finite three-timezone desktop/tablet/mobile journeys passed 27 accessibility captures and 18 intercepted fixture writes; zero page errors/unavailable reads. Earlier six journeys overlap the final nine. Desktop/mobile/tablet screenshots inspected. 147 committed source/evidence/export bindings verified. See A3 `docs/ui-modernisation/visual-correction/EDIT_DIALOG_FLAT_REVIEW.md`.
- V39 resolved within `/jobs`; the 34-route/57-group inventory and final owner/human qualification remain open. Other shared MUI labels and legacy timestamp semantics remain independent tasks. Phase 10 D02, launch selection, providers, integrated security/recovery and release gates are unchanged.
+6
View File
@@ -1,5 +1,11 @@
# Direct execution continuation
## 11 November flat Edit Job continuation
- A3 published and remotely read back at `c172427fb21820084eb0b029178599c1f776edac`. Presentation `7bfebe88` removes four decorative Edit Job panels and the raised intro; verifier `552525df` adds tablet coverage. All fields, actions and revision/date payload contracts retained.
- PASSED: 29 tests in three suites, build/TypeScript and scoped lint. Nine finite three-timezone desktop/tablet/mobile journeys passed 27 accessibility captures and 18 intercepted fixture writes; zero page errors/unavailable reads. Earlier six journeys overlap the final nine. Desktop/mobile/tablet screenshots inspected. 147 committed source/evidence/export bindings verified. See A3 `docs/ui-modernisation/visual-correction/EDIT_DIALOG_FLAT_REVIEW.md`.
- V39 resolved within `/jobs`; the 34-route/57-group inventory and final owner/human qualification remain open. Other shared MUI labels and legacy timestamp semantics remain independent tasks. Phase 10 D02, launch selection, providers, integrated security/recovery and release gates are unchanged.
## 11 November rendered picker and failed-save continuation
- A3 published and remotely read back at `89c553cb96802d9451843478530d6b1d5cde2d4a`. UI locale provider source `beb55642` places installed English/Bokmål picker locales under the live application language owner. Two red locale regressions reproduced English widget controls in Bokmål; 25 affected tests, full lint, scoped verifier lint and build with TypeScript passed.
+3 -1
View File
@@ -7,6 +7,8 @@
3. Continue independently eligible localisation on its isolated branch. The 188 historical dynamic calls are accounted for. Prioritise contextual display coverage and automated locale checks. Native and additional locale publication gates remain open.
4. Four desktop/mobile launch concept pairs are published at `ccb11494`. Retain owner selection before refinement and final approval before implementation. Release `3cca4418` includes RR-11/13 fixes and RR-12 post-rollback probes, with six offline rollback/twelve backup tests and corrected legacy-runbook scope. Actual recovery, integrated security and production remain separately gated.
5. Keep Product Review findings provisional until Phase 10 acceptance. Reuse the published GJ-00 pack. GJ-01 awaits the accepted predecessors, implementation scope and provider rights.
6. Continue PERF from the source census and comparable baseline. The reproduced PERF-01-RULES fix is integrated and passed 35 affected backend tests. Measure its steady-state lookup/load tradeoff and failed-save behaviour when the applicable environment is available. Carry the page correspondence delta into isolated MariaDB once the local engine is available. Keep the isolated JobTable split out of A3 until a revised strategy protects the throttled Jobs marker. Keep replica, CDN, production, migrations and protected removal gated.
6. Continue PERF from the source census and comparable baseline. The reproduced PERF-01-RULES fix is integrated and passed 35 affected backend tests. Failed-save qualification now passes nine real-SQLite cases (eight overlap prior35); steady-state MariaDB/load and operational recovery remain open. Carry the page correspondence delta into isolated MariaDB once the local engine is available. Keep the isolated JobTable split out of A3 until a revised strategy protects the throttled Jobs marker. Keep replica, CDN, production, migrations and protected removal gated.
Use [the complete roadmap TODO](ROADMAP_TODO.md), [the latest checkpoint](LATEST_CHECKPOINT.md) and branch-specific handoffs to resume. The orchestrator remains paused. Keep pre-p10-ux and unrelated work intact. Publication belongs on the relevant development branch.
Edit Job V39 is qualified/published at c172427f; do not repeat its nine paired journeys. Continue shared MUI UI-language defaults, remaining route/state walkthroughs and eligible localisation checks. Retain Phase 10 D02 and final A3 gates.
+7
View File
@@ -25,3 +25,10 @@ Updated 11 November 2026. This register records direct-chat work. See [the conti
| PERF-01 / 18 performance areas | IN PROGRESS | A3 page query, Companies cache, rules freshness and locale request changes published through `1d733675`. JobTable split trial remains isolated after a throttled phone regression. MariaDB plan/load validation blocked by unavailable local Docker engine |
Implemented, tested, accepted, published and production-ready are separate. Production is NO-GO. Historical counts are not fresh executions. See [blockers](BLOCKERS.md), [owner decisions](OWNER_DECISIONS.md), [completed work](WORK_COMPLETED.md) and [next actions](NEXT_ACTIONS.md).
## 11 November flat Edit Job continuation
- A3 published and remotely read back at `c172427fb21820084eb0b029178599c1f776edac`. Presentation `7bfebe88` removes four decorative Edit Job panels and the raised intro; verifier `552525df` adds tablet coverage. All fields, actions and revision/date payload contracts retained.
- PASSED: 29 tests in three suites, build/TypeScript and scoped lint. Nine finite three-timezone desktop/tablet/mobile journeys passed 27 accessibility captures and 18 intercepted fixture writes; zero page errors/unavailable reads. Earlier six journeys overlap the final nine. Desktop/mobile/tablet screenshots inspected. 147 committed source/evidence/export bindings verified. See A3 `docs/ui-modernisation/visual-correction/EDIT_DIALOG_FLAT_REVIEW.md`.
- V39 resolved within `/jobs`; the 34-route/57-group inventory and final owner/human qualification remain open. Other shared MUI labels and legacy timestamp semantics remain independent tasks. Phase 10 D02, launch selection, providers, integrated security/recovery and release gates are unchanged.
+7
View File
@@ -161,3 +161,10 @@ Source: owner PERF-01 prompt and Full-Roadmap-Autonomy Addendum, 10 November 202
- [ ] Deferred CV-import engine overhaul and personal portfolio are outside this execution.
Source index: Phase 10 and Product Review prompts 5–6, Global Jobs prompt 7 and `docs/planning/global-jobs-prompts/`, complete `I18N/` and `jobjakt-security/` packs, homepage prompt 10, release readiness prompt 11, the approved A3 implementation/visual requirements and `additional/# Jobjakt — A3 refinement+EUJOBS.txt`. Earlier items come from the [historical TODO](../roadmap/todo.md), [known issues](../roadmap/known-issues.md) and [technical debt](../roadmap/technical-debt.md). The [status register](ROADMAP_STATUS.md) and [latest checkpoint](LATEST_CHECKPOINT.md) identify current evidence and branches.
## 11 November flat Edit Job continuation
- A3 published and remotely read back at `c172427fb21820084eb0b029178599c1f776edac`. Presentation `7bfebe88` removes four decorative Edit Job panels and the raised intro; verifier `552525df` adds tablet coverage. All fields, actions and revision/date payload contracts retained.
- PASSED: 29 tests in three suites, build/TypeScript and scoped lint. Nine finite three-timezone desktop/tablet/mobile journeys passed 27 accessibility captures and 18 intercepted fixture writes; zero page errors/unavailable reads. Earlier six journeys overlap the final nine. Desktop/mobile/tablet screenshots inspected. 147 committed source/evidence/export bindings verified. See A3 `docs/ui-modernisation/visual-correction/EDIT_DIALOG_FLAT_REVIEW.md`.
- V39 resolved within `/jobs`; the 34-route/57-group inventory and final owner/human qualification remain open. Other shared MUI labels and legacy timestamp semantics remain independent tasks. Phase 10 D02, launch selection, providers, integrated security/recovery and release gates are unchanged.