# Blockers
|
||||
|
||||
2 November 2026. Severity describes impact/gate importance, not an invented vulnerability rating.
|
||||
|
||||
| ID | Feature / description and known cause | Severity / dependency | Required action | Elsewhere / gate scope / status |
|
||||
| --- | --- | --- | --- | --- |
|
||||
| B01 | P10 publication: Gitea pre-receive SIGSEGV rejected prior pushes | Mandatory checkpoint; external server fault | Normal push and exact readback | RESOLVED: remote `1692142295950e390a4cf807d9df86cc5cf96290`; no server repair performed |
|
||||
| B02 | P10-01 candidate approval absent; addendum explicitly retains this gate | Mandatory owner decision D01 | Approve/reject exact CLEAN-20 scope | Independent authorised planning allowed; blocks cleanup implementation; AWAITING_APPROVAL |
|
||||
| B03 | Ordered roadmap implementation lacks accepted predecessor phases | Mandatory dependency | Complete/accept predecessors and stage-specific scopes | Explicitly independent planning allowed; blocks dependent development; BLOCKED |
|
||||
| B04 | Physical device/AT/contrast/native-language/actual print qualification missing | Release qualification | Human review with actual evidence | Unaffected planning can proceed; production and affected acceptance; NOT_TESTED |
|
||||
| B05 | Real CV-model compatibility/semantic quality unqualified; adapter withheld | High activation gate | Separately approve safe immutable model qualification; retain disabled state | Model-independent work allowed; AI activation/claims; BLOCKED |
|
||||
| B06 | Hosted CI/isolation, production TLS/advisories, native parser/image isolation, backup/restore and deployed identity lack current qualification | High release gate; inherited evidence limits | Operator/isolated release evidence and scoped security disposition | Unrelated planning allowed; production; BLOCKED/NOT_TESTED by lane |
|
||||
| B07 | SQLite retirement lacks complete transfer, restore, parity, cutover and retention evidence | High data-preservation gate | Separate approved staged retirement | Unrelated cleanup/planning allowed; SQLite removal; BLOCKED |
|
||||
|
||||
No material security risk or missing test is accepted by this register. Current dependency advisory status has not been refreshed; historical findings are not claims about a new scan. Additional source-specific entry decisions are recorded after eligibility review.
|
||||
|
||||
Execution interruption: the three delegated workers hit a service usage limit. Parent continued and published partial I18N, homepage and release discovery checkpoints. Remaining audit/context/legal/rendered work is IN_PROGRESS/PENDING, not falsely classified as an external blocker. Resume locations are in NEXT_ACTIONS.md. No workers are running in the background.
|
||||
|
||||
Security entry: the master prompt's `DO NOT START THIS NOW!` and feature-completion dependency remain unresolved; conflicting README immediate-review wording does not authorise a formal scan. No new vulnerability findings or material risk acceptance are claimed.
|
||||
@@ -0,0 +1,33 @@
|
||||
# Direct roadmap checkpoint - 2 November 2026
|
||||
|
||||
This is a consolidated progress report, not a final declaration that eligible work is exhausted. Independent research remains available. Product implementation is unchanged; the orchestrator remains paused and untouched.
|
||||
|
||||
## Completed and published
|
||||
|
||||
P10-00 assessment is complete and published; candidate-specific P10-01 scope is recorded as D01. Normal Git publication now works. Existing GJ-00 planning publication is independently verified. Detailed exact commits are in WORK_COMPLETED.md.
|
||||
|
||||
## Partial work
|
||||
|
||||
- I18N: source audit and machine-readable message inventory; initial Europe matrix and schema-validated planned locale catalogue. Dynamic/hardcoded/backend text, full contextual/legal review and final compatibility decision remain. No additional language translated or released; all 60 candidates remain planned.
|
||||
- Homepage: source audit identifies sign-in versus registration CTA mismatch, conceptual SVG previews, client-only rendering, generic metadata and missing footer legal links in the component. These are documented observations, not fixes. Four viewable concepts, genuine captures, imagery licensing, rendered accessibility/performance/SEO and owner design choice remain.
|
||||
- Release: preliminary architecture and failure-boundary inventory, ten historical blocker reconciliations and 18 mandatory gate rows. Five offline guard tests passed. No release candidate qualified.
|
||||
|
||||
## Decisions and dependencies
|
||||
|
||||
Approve or retain only CLEAN-20 (`job-tracker-ui/src/App.css`, exact blob and verification scope in OWNER_DECISIONS.md). Generic continuation is not approval. Product Review prioritisation, provider agreements, I18N implementation/native release, homepage visual design, security entry/risk and production release each retain their separate gates. Later decisions will be presented with concrete evidence, not blanket permission requests.
|
||||
|
||||
## Security and AI
|
||||
|
||||
Formal Security Audit has not started. Historical advisory/TLS/parser/image/operator qualifications remain unresolved, with no new vulnerability scan or waiver. Real CV-model compatibility and semantic accuracy remain blocked; deterministic extraction evidence does not establish model quality. No models or production services were started or accessed.
|
||||
|
||||
## Global Jobs
|
||||
|
||||
GJ-00 planning at `0ec9f98e6ed4a646fc5e017d8eb6fade07653f37` is remotely verified. No new country/provider integration implemented in this continuation. Existing NAV/source behavior is not evidence that the planned global feature set is live. GJ-01 requires accepted predecessors, exact implementation authority and provider rights.
|
||||
|
||||
## Release and preserved evidence
|
||||
|
||||
Latest scoped PDF metric/visual acceptance remains preserved; no affected renderer/font/fixture change justified reopening it. Physical print/device/AT/native-language checks are separate. Hosted MariaDB isolation remains explicitly blocked in source. Backup existence is not restore proof; final CI, recovery, migration, provider, production-equivalent identity and rollback evidence remain missing. Production is NO-GO.
|
||||
|
||||
## Next work
|
||||
|
||||
Resume the precise eligible tasks and isolated worktrees in NEXT_ACTIONS.md. Delegated work stopped at a service usage limit; the parent salvaged, corrected and extended it. No background execution is running. Ordinary independent research does not require a new blanket prompt; the remaining P10 decision does require explicit approval under the user's addendum.
|
||||
@@ -0,0 +1,12 @@
|
||||
# Next eligible actions
|
||||
|
||||
2 November 2026.
|
||||
|
||||
1. D01/CLEAN-20 is presented in chat and awaits precise owner approval. Do not delete `App.css` beforehand. When approved, recheck source identity and perform only its documented implementation/verification/publication scope.
|
||||
2. Continue I18N-00 in `C:/Users/Connor/.codex/worktrees/i18n-00-audit/Job tracker` at `138d8fbb`: follow `docs/i18n/00/HANDOFF.md`. Resolve dynamic calls/direct access and hardcoded/backend text, real translator context/sensitivity, territory legal records and library compatibility. This is eligible research, not an external blocker.
|
||||
3. Continue LAUNCH-00/01 in `C:/Users/Connor/.codex/worktrees/launch-site-planning/Job tracker` at `756ab616`: rendered homepage/signup audit, pattern research, genuine synthetic captures, then four actual desktop/mobile concepts. No final design choice or implementation before owner review.
|
||||
4. Continue release Stage 1 in `C:/Users/Connor/.codex/worktrees/release-readiness-discovery/Job tracker` at `edd2aa9a`: complete endpoint/environment/failure-boundary census and inspect recovery implementation read-only. Do not rerun unchanged full suites or touch live services.
|
||||
5. Provisional independent Product Review research is eligible, but must remain clearly provisional until accepted Phase 10. Existing GJ-00 publication is verified; reuse its 23-document planning pack and frozen subordinate prompts rather than recreating it. GJ-01 implementation remains blocked.
|
||||
6. After each completed independent task, update blockers and identify newly eligible work. Unaccepted research cannot satisfy a prerequisite requiring accepted implementation. The session has unfinished eligible work; this checkpoint is not an exhaustion-of-roadmap declaration.
|
||||
|
||||
Use `ROADMAP_STATUS.md` and the branch-specific handoffs to resume. Never use the autonomous backlog orchestrator. Keep pre-p10-ux and unrelated work intact; no main merge or production deployment. Git is currently operational; avoid repeating the resolved server investigation.
|
||||
@@ -0,0 +1,16 @@
|
||||
# Owner decisions
|
||||
|
||||
2 November 2026. The Continuous Progress Addendum explicitly says P10-01 remains blocked until precise approval. It supersedes the earlier handoff's interpretation of “continue” as permission. No signed approval or controller state is created here.
|
||||
|
||||
## D01 — P10-01 / CLEAN-20
|
||||
|
||||
**AWAITING_APPROVAL.** Choose:
|
||||
|
||||
- Approve removal of only `job-tracker-ui/src/App.css` (recommended), under the exact verification and rollback scope in [P10-00](../redesign/phase-10/P10-00.md).
|
||||
- Retain the file and request a revised/no-removal checkpoint disposition.
|
||||
|
||||
The file is 38 lines of unimported original CRA styling, Git blob `74b5e053450a48a6bdb4d71aad648e7af821975c`. No callers, routes, persisted data or replacement are expected. Verify source identity, types/lint/build and the specified existing EN/NB/theme/browser cases; restore the exact file by reverting the implementation commit if verification fails. Accepted PDF evidence remains unchanged. Approval covers only CLEAN-20 plus necessary evidence/verification, not another removal or later initiative. Publication of the assessment is now verified; implementation approval is the remaining immediate gate.
|
||||
|
||||
## Later decisions — not requested prematurely
|
||||
|
||||
Product-ranked scope, Global Jobs implementation and provider licences, I18N implementation and human language release, homepage design selection, security target/environment and material-risk disposition, and final release approval retain their own concrete review gates. Research does not grant these decisions. Do not ask for generic blanket approval or treat this list as completed sign-off.
|
||||
@@ -0,0 +1,25 @@
|
||||
# Direct roadmap status
|
||||
|
||||
Updated 2 November 2026. This is documentation, not an executable queue. The Continuous Progress Addendum controls direct-chat work; the autonomous orchestrator remains paused and untouched.
|
||||
|
||||
| Workstream/checkpoint | Status | Dependency and evidence |
|
||||
| --- | --- | --- |
|
||||
| PHASE-10 / P10-00 assessment | COMPLETED | Report in `../redesign/phase-10/P10-00.md`; assessment `7ba1367`, publication receipts `8cdff28`/`1692142`. Remote exactly `1692142295950e390a4cf807d9df86cc5cf96290` on 2 November |
|
||||
| P10-01 / CLEAN-20 | AWAITING_APPROVAL | Delete only unused `job-tracker-ui/src/App.css`; precise owner decision D01 below. Addendum explicitly withholds implementation |
|
||||
| P10-02 CV/documents | BLOCKED | Preceding cleanup checkpoint and any exact candidate approval; retain historical documents |
|
||||
| P10-03 backend/dependencies/config | BLOCKED | Predecessors; no proven removal currently approved |
|
||||
| P10-04 functional/data verification | BLOCKED | Defined and accepted cleanup scope; fresh affected verification required |
|
||||
| P10-05 full acceptance | BLOCKED | P10-01–04 and complete applicable acceptance programme |
|
||||
| PRODUCT-REVIEW-01 | BLOCKED | Final audit requires accepted Phase 10. Provisional independent research is eligible; not yet performed or substituted for final acceptance |
|
||||
| INT-GLOBAL-JOBS-01 / GJ-00 | CONDITIONAL | Existing planning at `0ec9f98e6ed4a646fc5e017d8eb6fade07653f37`; exact remote reverified 2 November. No implementation authorised |
|
||||
| INT-GLOBAL-JOBS-01 implementation | BLOCKED | Accepted Phase 10/Product Review, initiative approval and provider rights |
|
||||
| I18N-01 / I18N-00 audit | IN_PROGRESS | Partial source-bound audit published at `138d8fbb6da51141b50f2acb3979458ce173a6c3`; 3,119 messages, 60 planned locale candidates. Contextual/legal/library review incomplete |
|
||||
| I18N-01–08 implementation/acceptance | BLOCKED | I18N-00 and stage prerequisites plus documented implementation authority; no locale publication approved |
|
||||
| LAUNCH-SITE-01 / LAUNCH-00 audit | IN_PROGRESS | Source audit and claim boundaries published at `756ab616a22746a9bafa9830afd4f8efbb085794`; rendered audit still pending |
|
||||
| LAUNCH-01 four desktop/mobile concepts | PENDING | No viewable concepts produced; eligible independent task after completing audit inputs |
|
||||
| LAUNCH-SITE final design/implementation | AWAITING_APPROVAL | Four concrete concepts must be delivered before owner selection; no final design auto-selection |
|
||||
| SECURITY-AUDIT-01 / stages 00–16 | BLOCKED | Master begins `DO NOT START THIS NOW!` and requires finished feature development/baseline tests; README's immediate-review wording does not silently override that gate. No formal scan started |
|
||||
| RELEASE-READINESS-01 / Stage 1 discovery | IN_PROGRESS | Preliminary inventory, blocker reconciliation and 18-gate matrix published at `edd2aa9ae428435773e5cf48167af4e0db1ef36a`; five offline guard tests passed; full discovery incomplete |
|
||||
| Release stages 2–7 baseline, qualification, remediation, requalification, rehearsal, final acceptance | BLOCKED | Final release candidate/prerequisites not accepted; each stage needs actual applicable environment and source-bound evidence |
|
||||
|
||||
Implemented, tested, accepted, published and production-ready are separate. Production is NO-GO. Historical counts are not fresh executions. See [blockers](BLOCKERS.md), [owner decisions](OWNER_DECISIONS.md), [completed work](WORK_COMPLETED.md) and [next actions](NEXT_ACTIONS.md).
|
||||
@@ -0,0 +1,27 @@
|
||||
# Work completed
|
||||
|
||||
2 November 2026.
|
||||
|
||||
| Work | Commit / evidence | Limits |
|
||||
| --- | --- | --- |
|
||||
| Direct P10-00 assessment, preserved prior draft, candidate inventory, rollback/verification proposal | `7ba1367fd2e84375b3065eeedf9176a34996f77b` | Markdown only; no P10-01 deletion |
|
||||
| Publication failure/continuity receipts | `8cdff28f0781e4c99efd06079149d9933e01cd4e`, `1692142295950e390a4cf807d9df86cc5cf96290` | Earlier server failures remain historical |
|
||||
| Restored normal publication | Push succeeded; independent `ls-remote` exactly `1692142295950e390a4cf807d9df86cc5cf96290` | No server repair, hook bypass, force push, main merge or deployment |
|
||||
| P10 evidence integrity/source applicability | 263 indexed hashes; 1,280 source files; 7 verifier sources; 57 groups/34 routes | Previous direct-assessment checks; not freshly rerun product suites in this continuation |
|
||||
| Lightweight direct-roadmap register | This documentation checkpoint | No runner, scheduler, approval service or replacement orchestrator |
|
||||
|
||||
The application baseline remains source-equivalent to accepted `ba04d817`. Historical PDF metric/visual acceptance is preserved. Current continuation product suites: NOT RUN. Models/production services: NOT ACCESSED.
|
||||
|
||||
## Published partial research checkpoints
|
||||
|
||||
All three branches start at accepted conditional handoff `5cb903b989742b7a96cb22ddf4c0e24993b18980`; no unaccepted Phase 10 changes were integrated. Normal pushes succeeded and each remote ref was independently read back exactly.
|
||||
|
||||
| Branch | Exact remote commit | Actual output / limits |
|
||||
| --- | --- | --- |
|
||||
| `feature/i18n-00-audit` | `138d8fbb6da51141b50f2acb3979458ce173a6c3` | Ten research files; 3,119 English entries, 3,164 static calls, 134 files; 188 dynamic/unknown calls unresolved; initial 59-territory matrix and 60 planned locales. Existing Ajv/Intl checks passed, including rejection of released status. Full audit NOT COMPLETE |
|
||||
| `feature/launch-site-redesign` | `756ab616a22746a9bafa9830afd4f8efbb085794` | Three source-audit/claims/handoff documents. No mockups or final implementation; rendered audit NOT RUN |
|
||||
| `planning/release-readiness-discovery` | `edd2aa9ae428435773e5cf48167af4e0db1ef36a` | Five preliminary discovery/evidence/matrix/handoff documents; 5 existing offline MariaDB runner guards passed. No real DB/hosted/production qualification |
|
||||
|
||||
Global Jobs planning remote independently verified at `0ec9f98e6ed4a646fc5e017d8eb6fade07653f37`. This resolves publication uncertainty, not GJ-01 entry gates.
|
||||
|
||||
Delegated workers hit a service usage limit. Parent continued, reviewed and corrected incomplete draft claims, then produced and published these partial checkpoints. No worker remains active. No partial stage is promoted to completed merely because its documents exist.
|
||||
@@ -4,6 +4,8 @@
|
||||
|
||||
## Completed and current gate
|
||||
|
||||
**Latest authority, 2 November 2026:** the owner's Continuous Progress Addendum explicitly retains precise P10-01 approval as outstanding, superseding the earlier interpretation of “continue” below. P10-01 is AWAITING_APPROVAL. Git publication is now resolved: normal push succeeded and independent remote readback matched `1692142295950e390a4cf807d9df86cc5cf96290`. Earlier failed attempts remain historical. Continue explicitly eligible independent planning under [the direct-roadmap register](../../direct-roadmap/ROADMAP_STATUS.md); do not use the former blanket conclusion that every later planning task is blocked. The I18N-00 source explicitly permits an audit while earlier gates remain blocked.
|
||||
|
||||
Continuation, 2 November 2026: the owner instructed “continue as far as you can” in response to the specific CLEAN-20 proposal. This is taken as permission to continue that nominated scope, not approval of additional candidates or later initiatives. Implementation still cannot begin across the mandatory publication gate. A normal push of clean local `8cdff28f0781e4c99efd06079149d9933e01cd4e` was retried once and again failed with the same remote SIGSEGV/pre-receive rejection. Independent remote readback again returned only the original handoff branch at `5cb903b`; the Phase 10 ref is absent. No server repair or hook bypass was attempted. The approval-pending statements below describe the preceding checkpoint; this continuation supplies the latest chat instruction, while publication remains BLOCKED.
|
||||
|
||||
Dependency disposition: P10-01 waits for required publication; P10-02–05 wait for their preceding checkpoints and applicable candidate decisions; PRODUCT-REVIEW-01 waits for accepted Phase 10; Global Jobs, I18N, Launch Site, Security Audit and Release Readiness wait for their ordered predecessors and entry gates. None is an independent next item that can be started by skipping this failure. The remaining external action is operator resolution of the Git-server hook fault, followed by normal push and exact remote verification. Preserve local work and stop at this boundary.
|
||||
|
||||
@@ -1,6 +1,6 @@
|
||||
# P10-00 — Direct assessment and deletion eligibility
|
||||
|
||||
2 November 2026, Europe/Paris. **Assessment content complete locally; checkpoint publication BLOCKED; P10-01 awaits candidate-specific owner approval and publication.** No application/test/dependency/schema change or deletion was performed. One narrowly bounded frontend stylesheet is nominated below; the other assessed areas remain retained. Phase 10 completion and post-redesign product-review acceptance are not established. Production remains NO-GO.
|
||||
2 November 2026, Europe/Paris. **Assessment complete and published; P10-01 awaits candidate-specific owner approval.** Normal publication subsequently succeeded at `1692142295950e390a4cf807d9df86cc5cf96290`, independently read back from the remote. The Continuous Progress Addendum explicitly retains the owner gate. No application/test/dependency/schema change or deletion was performed. One narrowly bounded frontend stylesheet is nominated below; the other assessed areas remain retained. Phase 10 completion and post-redesign product-review acceptance are not established. Production remains NO-GO.
|
||||
|
||||
## Authority, baseline and draft review
|
||||
|
||||
@@ -109,9 +109,9 @@ Retained independent debt: physical device/AT/contrast/proficient EN-NB/printing
|
||||
| Decision | Current result |
|
||||
| --- | --- |
|
||||
| P10-00 direct assessment | **COMPLETE** within the authorised documentation/inspection scope |
|
||||
| P10-00 checkpoint publication | **BLOCKED**: local `7ba1367fd2e84375b3065eeedf9176a34996f77b` push rejected by Gitea's crashing pre-receive hook; no Phase 10 remote ref on independent readback |
|
||||
| P10-00 checkpoint publication | **PASSED**: subsequent normal push and independent readback at `1692142295950e390a4cf807d9df86cc5cf96290`; previous pre-receive failures remain historical |
|
||||
| CLEAN-20 static deletion eligibility | **NOMINATED**, with exact implementation verification and owner gate above |
|
||||
| P10-01 implementation | **BLOCKED pending explicit candidate-specific approval in this chat and required checkpoint publication** |
|
||||
| P10-01 implementation | **AWAITING_APPROVAL** of the exact candidate scope; publication prerequisite satisfied |
|
||||
| Phase 10 complete acceptance | **NO-GO / NOT YET ESTABLISHED**; P10-01–05 not complete |
|
||||
| Redesign development completion | Existing **CONDITIONAL GO** remains scoped; final cleanup acceptance not established |
|
||||
| Post-Phase-10 PRODUCT-REVIEW-01 readiness | **NO-GO** until Phase 10 is accepted and applicable entry conditions are satisfied |
|
||||
|
||||
@@ -1,7 +1,7 @@
|
||||
## Direct Phase 10 — 2 November 2026
|
||||
|
||||
- [x] P10-00: preserve/review the staged draft, verify baseline/evidence applicability and complete the [direct assessment](../redesign/phase-10/P10-00.md).
|
||||
- [ ] Publication gate: local assessment `7ba1367` push was rejected by a Gitea pre-receive SIGSEGV. Await operator resolution, then normal push and exact readback; no hook bypass or server repair in this task.
|
||||
- [x] Publication gate: normal push and exact remote readback succeeded at `1692142` after the earlier Gitea failure; no hook bypass or server repair. Further progress is tracked in [the direct-roadmap register](../direct-roadmap/ROADMAP_STATUS.md).
|
||||
- [ ] Owner gate: explicit approval of P10-01/CLEAN-20 only (`job-tracker-ui/src/App.css`), with the assessment's exact verification/rollback boundaries.
|
||||
- [ ] After approval only: implement and qualify that candidate; commit, publish and independently verify the checkpoint. Stop at subsequent candidate/entry gates.
|
||||
- [ ] P10-02–05 and later roadmap: preserve contracts and follow authoritative order from [continuity](../redesign/phase-10/HANDOFF.md). No later implementation is currently authorised.
|
||||
|
||||