2.7 KiB
Work completed
2 November 2026.
| Work | Commit / evidence | Limits |
|---|---|---|
| Direct P10-00 assessment, preserved prior draft, candidate inventory, rollback/verification proposal | 7ba1367fd2e84375b3065eeedf9176a34996f77b |
Markdown only; no P10-01 deletion |
| Publication failure/continuity receipts | 8cdff28f0781e4c99efd06079149d9933e01cd4e, 1692142295950e390a4cf807d9df86cc5cf96290 |
Earlier server failures remain historical |
| Restored normal publication | Push succeeded; independent ls-remote exactly 1692142295950e390a4cf807d9df86cc5cf96290 |
No server repair, hook bypass, force push, main merge or deployment |
| P10 evidence integrity/source applicability | 263 indexed hashes; 1,280 source files; 7 verifier sources; 57 groups/34 routes | Previous direct-assessment checks; not freshly rerun product suites in this continuation |
| Lightweight direct-roadmap register | This documentation checkpoint | No runner, scheduler, approval service or replacement orchestrator |
The application baseline remains source-equivalent to accepted ba04d817. Historical PDF metric/visual acceptance is preserved. Current continuation product suites: NOT RUN. Models/production services: NOT ACCESSED.
Published partial research checkpoints
All three branches start at accepted conditional handoff 5cb903b989742b7a96cb22ddf4c0e24993b18980; no unaccepted Phase 10 changes were integrated. Normal pushes succeeded and each remote ref was independently read back exactly.
| Branch | Exact remote commit | Actual output / limits |
|---|---|---|
feature/i18n-00-audit |
138d8fbb6da51141b50f2acb3979458ce173a6c3 |
Ten research files; 3,119 English entries, 3,164 static calls, 134 files; 188 dynamic/unknown calls unresolved; initial 59-territory matrix and 60 planned locales. Existing Ajv/Intl checks passed, including rejection of released status. Full audit NOT COMPLETE |
feature/launch-site-redesign |
756ab616a22746a9bafa9830afd4f8efbb085794 |
Three source-audit/claims/handoff documents. No mockups or final implementation; rendered audit NOT RUN |
planning/release-readiness-discovery |
edd2aa9ae428435773e5cf48167af4e0db1ef36a |
Five preliminary discovery/evidence/matrix/handoff documents; 5 existing offline MariaDB runner guards passed. No real DB/hosted/production qualification |
Global Jobs planning remote independently verified at 0ec9f98e6ed4a646fc5e017d8eb6fade07653f37. This resolves publication uncertainty, not GJ-01 entry gates.
Delegated workers hit a service usage limit. Parent continued, reviewed and corrected incomplete draft claims, then produced and published these partial checkpoints. No worker remains active. No partial stage is promoted to completed merely because its documents exist.