docs: bind frozen document qualification and backend language inventory

This commit is contained in:
cesnimda
2026-11-19 21:09:54 +01:00
parent eb59b06acc
commit d270ebd0dd
4 changed files with 619 additions and 0 deletions
+6
View File
@@ -1,5 +1,11 @@
# Direct execution continuation
## 19 November — frozen attachment journey and complete backend string frontier
The [current owner directive](sources/FULL_ROADMAP_AND_REDESIGN_cd9be7c0.md) governs direct execution. Submitted snapshot cleanup now requires successful creation of the destination by the current writer. Source `fa8154da9e3905d9486838b8e1a11cc6ba7a80db` on `codex/frozen-document-integrity`; integrated runtime `398fafb72d6ed6214c98d71cd5e6c5817194c242` and browser evidence `245f2feaa8bee2db8f5da0797b3e33f6ef8b056e` on `codex/a3-ui-10`. 29 source-branch package/attachment cases passed. On the combined integration branch, 67 affected backend tests passed, including the attachment and tracker cases; do not add the earlier runs. A fresh native Chromium package journey passed in 43.3 seconds including startup: previewed the frozen CV and verified exact original attachment bytes after source changes. Disposable SQLite and unchanged qualified E export; real binary/receipt/attachments in `docs/ui-modernisation/evidence/submitted-snapshot-cleanup`. No two-writer race was forced. Existing PDF visual/metric acceptance was not reopened.
I18N-00 B06 `61dcb894f8aba33290fc94da24ab4eaac9c8e41c` and B07 `aaf66ca24ae97116efb4b7d6dec342830b31cb71` are published on `codex/i18n-message-disposition-b04`. All 708 B03 quoted lines across the 28 frozen owners now have exactly one review (149 B05 + 124 B06 + 435 B07). Four B05, two B06 and three B07 integrity checks passed. This is a historical inventory closure; runtime localisation, translations and native acceptance remain open. An ASCII-only heading matcher was found on the CV preview path. The next independently eligible package exercises that normal entry point with synthetic French, Greek and Norwegian section names, preserving source and adjacent content without starting any model.
## 19 November — European alphabet qualification and recovered CV receipt
I18N-00 R03 `97e5cd187c315ca926b6d2aa98e5e2713aa4167f` is published on `codex/i18n-message-disposition-b04`. The offline Windows ICU exemplar probe preserved language and script identity for 56 out of 60 candidates, covering all 24 EU languages. All 31 registered font faces covered the 24 distinct sampled characters for Lule Sámi and for Southern Sámi. Across 1,736 face/exemplar observations, 194 had at least one gap. Kven and Montenegrin resolved to English on this host. Bokmål and Nynorsk inherited a shared Norwegian exemplar. The probe records all four substitutions explicitly. Original R02 and new R03 both passed full native recomputation; the results use different corpora. Further source qualification and actual PDF shaping/native checks remain open.
+4
View File
@@ -1,5 +1,9 @@
# Direct roadmap status
## 19 November — frozen attachment journey and complete backend string frontier
Submitted attachment ownership fix and fresh frozen-bytes browser journey published on the development integration branch at `245f2fea`. 67 combined backend tests and one actual HTTP/browser case passed. B07 `aaf66ca2` closes all 708 quoted-line dispositions on the frozen backend census. The 60-locale programme and the final design selection remain open.
## 19 November — European alphabet qualification and recovered CV receipt
R03 source `97e5cd18` qualifies standard alphabet samples, including two Sámi candidate tags unavailable for R02 date/number sampling. Every one of the 31 registered faces mapped the sampled Lule and Southern Sámi alphabet scalars. Full locale support and document rendering remain open. Recovered Chromium CV case receipt published on integration at `990a3bfa`.
+3
View File
@@ -1,5 +1,8 @@
# Jobjakt roadmap TODO
- [x] **Submitted attachment snapshot cleanup and integrated browser qualification.** `fa8154da` integrated at `398fafb7`; evidence `245f2fea`. 67 affected tests and one case through the actual API and browser passed. Verified the original frozen download still matches its recorded SHA-256 after the source changed.
- [x] **I18N-00 complete B03 quoted-line review.** B06 `61dcb894` and B07 `aaf66ca2` close the remaining 559 lines. The 708 historical lines have exactly one disposition each. This does not establish complete extraction or translation coverage.
- [x] **I18N-00 R03 standard alphabet probe.** `97e5cd18`, 56 same-language/same-script samples covering EU24; 1,542/1,736 face/exemplar pairs mapped every sampled scalar. Four fallback-source identities excluded. Full document and native-language qualification remains open.
- [x] **Recovered CV journey receipt packaged.** `990a3bfa` records the earlier native Chromium case and source identity. No duplicate implementation or test execution.
@@ -0,0 +1,606 @@
# Jobjakt — FULL ROADMAP EXECUTION + COMPLETE REDESIGN EXPLORATION
## Maximum Autonomous Development Across the Entire Backlog
I want you to continue developing Jobjakt, completing as much of my ENTIRE existing TODO as possible while simultaneously exploring a completely new frontend design.
**Do not stop after one checkpoint, one feature, one commit, one milestone or one workstream.**
Continue implementing independently authorised work for as long as the current execution environment, available usage and resources permit.
The goal is maximum meaningful, validated development progress.
---
# 1. Resume from the latest verified checkpoints
The latest reported checkpoints are:
- Application/A3 audit: `5fd5c470`
- Roadmap: `09a3a664`
Verify the actual repository state before proceeding.
Read the authoritative files:
- `docs/direct-roadmap/LATEST_CHECKPOINT.md`
- `docs/direct-roadmap/ROADMAP_TODO.md`
- `docs/direct-roadmap/ROADMAP_STATUS.md`
- Existing owner decisions and approval registers.
- Relevant implementation plans and acceptance documents.
Inspect existing worktrees, uncommitted changes, unpublished commits and unfinished worker outputs.
Preserve valid work.
Do not repeat completed audits or duplicate existing functionality.
The A3 reassessment concluded:
**PARTIALLY IMPLEMENTED**
IM01–IM09 have recorded implementation/progression evidence, but IM10, final visual acceptance and remaining qualification are incomplete.
The recovered connected CV journey was already integrated. Do not implement it again.
---
# 2. PRIMARY DESIGN PRIORITY — Five completely new Jobjakt concepts
I want to explore redesigning Jobjakt completely from the ground up.
This is not another A3 refinement.
You are authorised to rethink the entire frontend user experience, including:
- Navigation and information architecture.
- Dashboard.
- Job discovery.
- Applications and tracking.
- Application-detail workflows.
- Career Profile.
- CV Builder and editor.
- Cover letters.
- Calendar and interviews.
- Correspondence.
- Documents.
- Settings and automation.
- Onboarding.
- Administration.
- Mobile and desktop experiences.
- Typography, colours and visual identity.
- Component architecture and design system.
The existing A3 visual design is not a constraint.
## Deliver five genuinely different concepts
Produce five high-fidelity, interactive, browser-viewable prototypes.
Suggested directions:
A. Minimal productivity workspace.
B. Friendly, approachable career platform.
C. Career and document studio.
D. Premium modern SaaS.
E. Your own original recommendation, informed by research.
These must not simply be five colour variations.
Explore genuinely different navigation systems, page layouts and interaction patterns.
## Prototype requirements
Each concept should demonstrate:
- Desktop layouts.
- Mobile layouts.
- Light and dark themes.
- Realistic synthetic information.
- Navigation.
- Application tracking.
- Job discovery.
- Career Profile.
- CV editing and preview.
- Representative connected workflows.
- Loading, error and empty states.
Provide a working comparison gallery with screenshots and an evaluation of:
- Usability.
- Visual design.
- Information density.
- Accessibility.
- Navigation.
- Mobile experience.
- Implementation complexity.
- Preservation of existing functionality.
Keep the experience clean, modern and intuitive.
Avoid excessive nested cards and decorative containers.
Design for people in every profession, not only developers.
## Important approval boundary
You may create research, prototypes, comparisons and implementation proposals.
**Do not replace the actual application frontend until I have selected and approved the design and implementation strategy.**
Once the prototypes are ready, prepare them for my review.
Do not automatically select a winner.
Continue other authorised development while waiting for my feedback.
---
# 3. EQUALLY IMPORTANT — Continue the ENTIRE existing TODO
I do not want the redesign exploration to consume all development capacity.
While the design work proceeds, continue implementing everything else that is independently authorised in the existing roadmap.
This includes ALL current workstreams, not merely the following examples.
## Phase 10
Complete eligible outstanding acceptance, integrity, compatibility and preservation work.
Maintain all 34 routes and 57 preservation groups.
Do not bypass final owner approval.
## PRODUCT-REVIEW-01
Progress independently eligible preparation, evidence collection and research.
Complete formal review and protected implementation only after their prerequisites and approvals are satisfied.
## A3 application work
Continue correcting:
- Functional defects.
- Data-loss risks.
- Accessibility failures.
- Broken user journeys.
- Security defects.
- Important recovery failures.
Deprioritise purely cosmetic A3 changes because the frontend may be replaced.
Do not abandon essential functionality or acceptance evidence.
## International Global Job Search
Continue eligible GJ-01–GJ-08 work, respecting the existing predecessor and provider-rights gates.
Prioritise reusable, design-independent work:
- Country preferences.
- Canonical geographic data.
- Country-aware location hierarchies.
- Occupations and skills.
- Search architecture.
- Provider-independent services.
- Saved searches.
- Job matching.
- Alerts.
- Security and ownership protections.
- Integration and acceptance evidence.
Do not claim providers are supported before actual rights and integration qualification.
## European localisation
This is a major priority.
The goal is **all 24 official EU languages plus the approved wider European languages and locales**.
EN/NB fixes are only part of the foundation.
Continue:
- Locale registry.
- Translation architecture.
- Frontend catalogues.
- Backend errors/messages.
- Email and notification localisation.
- Career Profile and CV/letter localisation.
- PDF/export compatibility.
- Job discovery translations.
- Country-specific formatting.
- Localised public homepage.
- Translation tooling.
- Missing-string detection.
- Catalogue validation.
- Per-language acceptance.
Ensure language coverage is tracked honestly.
Do not count a registered locale as a translated or accepted locale.
## EUROPE-READY-01
Continue eligible geographical and international support work.
Ensure:
- Search countries are independent of residence.
- Interface language is independent of job-advertisement language.
- Document languages remain independent.
- Maps adapt to the selected country.
- Geographic filters use correct country-specific hierarchies.
- Multiple countries can be searched.
- Local dates, currencies and conventions are correct.
Preserve the existing European coverage matrix and licensing gates.
## PERF-01 — All 18 optimisation areas
Continue the existing performance backlog.
Include:
- API response caching.
- Expensive-query caching.
- Database indexing.
- N+1 query reduction.
- Connection pooling.
- Pagination.
- Image optimisation.
- Loading skeletons.
- Debouncing.
- Bundle splitting.
- Lazy loading.
- React rendering optimisation.
- JavaScript/CSS minification.
- Response compression.
- Deferred scripts.
- Unused dependency removal.
- CDN evaluation.
- Load-balancing evaluation.
Prioritise by measurable benefit, not checklist order.
Avoid speculative infrastructure complexity.
Do not implement unapproved production changes or paid services.
## LAUNCH-SITE-01
Continue eligible homepage research and design-independent work.
Preserve the existing owner design-selection gate.
Coordinate with the new product visual identity, European localisation and country-specific content.
Do not lock the homepage into an unapproved brand direction.
## SECURITY-AUDIT-01
Continue independently authorised security preparation and remediation.
Prioritise confirmed vulnerabilities involving:
- Authentication.
- Authorisation.
- User and tenant isolation.
- MFA.
- Email and OAuth.
- CV uploads and document processing.
- Dependency vulnerabilities.
- API access.
- Secrets.
- Data integrity.
Do not perform unapproved adversarial production testing.
Maintain the formal integrated audit gates.
## RELEASE-READINESS-01
Continue eligible offline and isolated verification:
- Docker and deployment reproducibility.
- Database compatibility.
- Backup integrity.
- Recovery safeguards.
- Health checks.
- Operational diagnostics.
- Test infrastructure.
- Performance evidence.
- Rollback qualification.
- Security readiness.
Do not treat isolated checks as evidence of production acceptance.
Preserve the separate production GO/NO-GO decision.
## Technical debt
Also review the existing technical-debt and separately gated items.
Do not silently skip them.
Progress eligible work and record dependencies for anything requiring separate approval.
---
# 4. MAXIMUM SAFE PARALLEL DEVELOPMENT
Use Codex parallel agents/workers where available.
I want as much useful concurrent work as possible.
Suggested allocation:
**Worker A — Complete design exploration**
- Five interactive concepts.
- Comparison gallery.
- Screenshots.
- Implementation options.
**Worker B — European expansion**
- I18N.
- Geography.
- Country-independent infrastructure.
- Global Jobs components.
**Worker C — Backend and performance**
- Database efficiency.
- Caching.
- API performance.
- Reliability.
- Connected workflow fixes.
**Worker D — Security, operations and qualification**
- Dependency remediation.
- Safe security analysis.
- Backup/recovery.
- Release-readiness evidence.
These are suggestions, not rigid assignments.
Reassign workers dynamically according to actual available tasks.
Use isolated worktrees and clear file ownership.
Avoid conflicting modifications to common files and shared databases.
Avoid oversubscribing CPU, memory or available usage.
If parallel workers become unavailable, preserve their changes and continue useful work sequentially.
Do not allow one interrupted worker to halt the entire backlog.
---
# 5. EXECUTION STRATEGY — Finish substantial work
I want you to prioritise meaningful feature completion rather than many tiny isolated fixes.
Prefer coherent implementation packages that close several related TODO items.
For each package:
1. Inspect existing implementation.
2. Confirm prerequisites and authority.
3. Implement the changes.
4. Add appropriate regression coverage.
5. Run targeted tests.
6. Validate integration where required.
7. Fix introduced regressions.
8. Record actual evidence.
9. Commit validated changes.
10. Publish when available and authorised.
11. Update the authoritative TODO.
12. Immediately select another eligible task.
Do not rerun the entire frontend/backend regression suite after every small change unless risk or acceptance requirements justify it.
Reuse applicable historical evidence only when its original conditions still hold.
Perform broader validation at meaningful integration and acceptance boundaries.
Never weaken tests merely to increase progress.
---
# 6. CONTINUOUS BACKLOG SCHEDULING
Treat the authoritative TODO as a dependency graph.
After completing a task, scan the remaining backlog.
Choose the highest-impact independently authorised next item.
Prioritise:
1. Security and data-integrity defects.
2. Work that unblocks multiple other tasks.
3. Core functional workflows.
4. European expansion foundations.
5. Significant performance improvements.
6. Remaining independently eligible roadmap work.
If a task is blocked:
- Record the exact blocker.
- Record required dependencies or approval.
- Preserve completed work.
- Move to another eligible task.
Do not repeatedly retry unchanged infrastructure failures.
Do not stop because one milestone needs owner approval.
Do not treat a completed commit or checkpoint as a stopping point.
---
# 7. BATCH QUESTIONS AND APPROVALS
Minimise interruptions.
I do not want to answer routine implementation questions individually.
Maintain one consolidated owner-decision register.
When approval is required:
- Record the question.
- Present available choices.
- Explain implications.
- Recommend an option.
- Identify blocked work.
- Continue something independent.
Ask me only when no further independently authorised useful work remains, except where an urgent security or destructive-data concern requires immediate attention.
Keep the new frontend design-selection gate explicit.
My approval of design exploration does not approve frontend replacement.
No silence-as-consent.
No bypassing protected gates.
---
# 8. DURABLE CONTINUITY
Update the existing authoritative records after meaningful verified increments:
- `ROADMAP_TODO.md`
- `ROADMAP_STATUS.md`
- `LATEST_CHECKPOINT.md`
- Relevant decision, blocker and acceptance records.
Record:
- Current Git branches/worktrees.
- Exact commits.
- Published versus local-only changes.
- Completed and partial tasks.
- Tests actually run.
- Current blockers.
- Unfinished implementation.
- Remaining owner decisions.
- Next eligible tasks.
Ensure a new Codex session can resume safely after a usage or thread limit.
Do not recreate the autonomous orchestrator.
---
# 9. VALIDATION AND QUALITY
Preserve existing functionality while developing new capabilities.
Maintain appropriate coverage for:
- Authentication and permissions.
- Cross-user data isolation.
- CV/document revisions.
- Imported and exported files.
- Job application workflows.
- Database integrity.
- Accessibility.
- Mobile and desktop behaviour.
- European languages.
- Error and recovery states.
- Existing API contracts.
Distinguish:
- Researched.
- Implemented.
- Tested.
- Published.
- Accepted.
- Production-ready.
Do not fabricate performance gains, tests, provider availability or localisation completeness.
---
# 10. REPORTING
Provide progress summaries when necessary, but do not voluntarily end execution just to produce a checkpoint report.
The five interactive designs are the next important owner-facing deliverable.
Once those are ready, provide the gallery and comparison for my review.
While waiting for design feedback, continue independently authorised roadmap development.
When the current execution must end, provide a consolidated report showing:
- Actual development completed.
- New design progress.
- Wider TODO progress.
- Performance improvements.
- European localisation coverage.
- Global Jobs progress.
- Security findings.
- Test and acceptance evidence.
- Published commits.
- Unfinished work.
- Blockers.
- Grouped owner decisions.
- Exact next eligible tasks.
Do not claim unfinished work is complete.
---
# 11. HARD RESTRICTIONS
Do not:
- Use or reactivate the autonomous orchestrator.
- Merge into `main`.
- Deploy production.
- Perform destructive migrations without approval.
- Activate unqualified external providers or AI models.
- Incur unapproved costs.
- Delete or overwrite existing user data.
- Discard unfinished work.
- Bypass mandatory owner approvals.
- Replace the frontend before I select and approve the new design.
- Declare full European language or provider coverage without genuine qualification.
---
# FINAL DIRECTIVE
**START CONTINUOUS FULL-ROADMAP DEVELOPMENT NOW.**
I want two substantial outcomes:
**A. Five completely new, interactive Jobjakt design concepts that I can review and combine before approving any frontend replacement.**
**B. As much completed, tested and published development as possible across my ENTIRE existing Jobjakt TODO.**
Do not let the design exploration pause European localisation, Global Jobs, performance, security, release-readiness or any other independently authorised work.
Use safe parallelism wherever supported.
If blocked, move to something else.
After every completed package, immediately start the next eligible task.
Keep working for as long as the execution environment legitimately permits.
Only stop when all remaining work is blocked, mandatory input is required for every useful next step, or an unavoidable execution/usage limit is reached.
Preserve complete continuation records if interrupted.
**I want maximum useful progress across the whole product, not just another small batch of fixes or design documentation.**