docs(redesign): record production no-go and P5-14 scope
This commit is contained in:
@@ -4,7 +4,7 @@
|
||||
|
||||
Sources: [Phase 3 sequencing](../phase-3/PHASE4_IMPLEMENTATION_PLAN.md), [P4-06 conditional acceptance](../phase-4/p4-06/README.md), [readiness gates](READINESS_GATES.md), [navigation contract](NAVIGATION_MIGRATION.md), [57-contract impact](PRESERVATION_IMPACT.md), [visual acceptance](VISUAL_ACCEPTANCE.md). This plan makes Phase 3 proposals concrete; it does not supersede preserved functionality or turn missing APIs into existing capabilities.
|
||||
|
||||
**Latest scope clarification — 2026-10-08:** [P5-13 grounding qualification](p5-13-qualification/README.md) remains **NO-GO for AI review UI**; its full requirements and [return conditions](OPEN_BLOCKERS.md#p5-13-deferred-debt-and-return-conditions--2026-10-08) remain mandatory. Connor's latest instruction places production deployment at the Phase 5 release-candidate decision **after P5-15**, superseding the previous release-before-P5-14 order. This bounded qualification checkpoint authorizes no UI, P5-14, P5-15, B07, production merge or deployment. Later acceptance must distinguish implemented/deferred and release-blocking/nonblocking work; missing AI-review responsiveness or human evidence cannot be reported as passed. F04, backup/restore, configuration, rollback and protected CI gates remain; no repeated Docker recovery during unrelated work.
|
||||
**Latest scope clarification — 2026-10-08:** Connor authorizes fresh production assessment from `1095ef1`, then P5-14 for implemented P5-09–12 CV capabilities **regardless of the release decision**. The [release decision](production-release-decision/README.md) remains **PRODUCTION NO-GO** until actual ingress/current backup-restore/configuration/rollback/protected-CI evidence exists; `main` automatically deploys on push. This supersedes qualification-only and deploy-after-P5-15 sequencing. P5-13 remains **DEFERRED / NOT QUALIFIED**, its [full return conditions](OPEN_BLOCKERS.md#p5-13-deferred-debt-and-return-conditions--2026-10-08) mandatory and Production withholding active. P5-14 may complete a scoped responsive checkpoint without unimplemented AI review; missing AI-specific responsiveness, human screen-reader and production font/photo evidence must remain explicit. No new qualification/Docker recovery, P5-13 UI, P5-15 or B07 starts here. Every individual P5-15 change/checkpoint must later be committed and pushed.
|
||||
|
||||
## Order and conditional branches
|
||||
|
||||
|
||||
Reference in New Issue
Block a user