docs(redesign): record production no-go and P5-14 scope

This commit is contained in:
cesnimda
2026-10-08 22:47:13 +02:00
parent 1095ef1d29
commit ef661983a0
5 changed files with 406 additions and 3 deletions
+1 -1
View File
@@ -1,6 +1,6 @@
# Phase 5 — Representative screens / major UI redesign plan
**Current status — 2026-10-08, latest qualification instruction:** P5-12 is the latest completed UI slice. [P5-13 grounding qualification](p5-13-qualification/README.md) remains **NO-GO for AI review UI**: 0/366 genuine calls, 0 human reviews, factuality unmeasured; fresh deterministic API/revision/HTTP checks pass separately. The candidate's Production CV review block stays active. No P5-13 UI, P5-14, P5-15, B07, production merge or deployment is authorized by this checkpoint. The latest instruction schedules deployment for the release-candidate decision **after P5-15**, superseding the earlier release-first ordering. F04, backup/restore, configuration/rollback and protected CI remain independent production gates. [The debt register](OPEN_BLOCKERS.md#p5-13-deferred-debt-and-return-conditions--2026-10-08) retains all qualification requirements; no deferred capability is declared complete.
**Current direction — 2026-10-08, owner's release/P5-14 instruction:** Assess the completed candidate at `1095ef1d29856a2984cd800abd2bbd65dd472d38` against fresh tests and actual production evidence, then implement P5-14 for currently implemented CV capabilities even when production is blocked. The [production release decision](production-release-decision/README.md) identifies `main` as the automatic deployment branch; missing ingress/current recovery/configuration/rollback evidence means **PRODUCTION NO-GO**, with no production merge, push or deployment. This supersedes the previous qualification-only/deploy-after-P5-15 sequencing, without waiving any release gate. P5-13 remains deferred: 0/366 genuine calls, 0 human reviews, factuality unmeasured, AI review UI unimplemented and Production withholding active. [The debt register](OPEN_BLOCKERS.md#p5-13-deferred-debt-and-return-conditions--2026-10-08) retains every qualification/acceptance obligation. P5-14 excludes unimplemented AI review and cannot claim complete AI-assisted CV acceptance. Stop before P5-15 and B07; every individual P5-15 change/checkpoint must later be committed and pushed.
The successor entries below retain their historical checkpoint decisions; they do not override this current status.