docs(entry): close visual preparation and reconcile mandatory orchestrator gates

This commit is contained in:
cesnimda
2026-10-30 08:46:14 +01:00
parent 39bf430401
commit fc5b9d3771
21 changed files with 169 additions and 58 deletions
@@ -27,7 +27,7 @@
"TEST_EVIDENCE.json",
"TRACEABILITY.md"
],
"limits": "Finite automated development review; manual/PDF/model/operator conditions remain."
"limits": "Conditionally closed for the accepted development/preparation scope; owner UI/PDF appearance approval recorded and applicable source-bound evidence sufficient. Separate release debt and protected orchestrator gates remain."
},
{
"criterion": "CV Integration",
@@ -42,13 +42,13 @@
},
{
"criterion": "PDF Spacing",
"status": "PARTIAL",
"status": "PASS",
"evidence": [
"VISUAL_REVIEW.md",
"windows-template-oracle",
"linux-template-oracle"
"PDF_VISUAL_APPROVAL.json",
"S01_METRIC_APPROVAL.json",
"s01-approved-qualification"
],
"limits": "Automated accent clipping and owner-dispositioned S01 pass; human typography/spacing/printing review remains pending, so PARTIAL."
"limits": "Owner personally reviewed current UI/revised CV PDFs and approved visual appearance for development. Same2mm S01 retained. No physical printing/device/AT/language or production approval."
},
{
"criterion": "Automated PDF Fidelity",
@@ -137,7 +137,7 @@
"BLOCKERS.json",
"READY_TO_RUN.md"
],
"limits": "Protected entry/candidate decisions and actual controller runtime/test-adapter/policy qualification remain pending. S01 metric-only disposition is complete; human PDF spacing remains PARTIAL."
"limits": "NO-GO for autonomous entry: actual composite adapter unconfigured, signed final baseline/assessment-stop policy unadopted, and protected runtime/entry activation pending. Owner key and fresh real-key qualification now confirmed; no PDF blocker or mandatory post-S01 product rerun remains."
},
{
"criterion": "Automation Handoff Package",
@@ -206,5 +206,5 @@
}
],
"generatedUtc": "2026-10-29T23:37:45.931733+00:00",
"recommendation": "Remain BLOCKED for automatic Phase10. Review this complete evidence, resolve affected mandatory conditions and protected scope, qualify the separate runtime/adapter, and adopt final published baseline/policy through its signed approval flow. Do not start any later workstream, merge or deploy."
"recommendation": "Pre-Phase10 preparation conditionally closed. Retain release/activation debt. Stop at protected orchestrator gate until actual composite adapter, signed exact final baseline/P10-00-only scope policy and owner-controlled runtime/entry activation are satisfied. No cleanup or production action."
}
@@ -1,3 +1,5 @@
> **30 October2026 — final owner visual approval and development-entry review.** PDF/UI appearance is owner-approved for development; metric36/36 per platform retained. Pre-Phase10 preparation conditionally closed. [FINAL_DEVELOPMENT_ENTRY.md](FINAL_DEVELOPMENT_ENTRY.md) identifies only the remaining adapter, signed scope/baseline policy and protected activation barriers. Physical printing/device/AT remain unperformed; production NO-GO. Fresh public status confirms a configured owner key and matching real-key qualification, superseding earlier missing-key claims. No Phase10 execution occurred.
# Authority reconciliation — 29 October 2026
This register distinguishes tested implementation, development review, cleanup entry and release. The package is evidence, never an approval token.
@@ -5,7 +5,7 @@
"items": [
{
"id": "P10-ENTRY-01",
"description": "No protected owner approval of the final published development baseline and exact cleanup scope was supplied to this handoff.",
"description": "Owner has approved current UI/PDF appearance and requested progress toward Phase10. Protected controller signature for the exact final published baseline and bounded P10-00 scope remains pending.",
"evidence": [
"AUTHORITY.md",
"docs/cv-integration-qa/PHASE_10_HANDOFF.md"
@@ -30,7 +30,7 @@
],
"severity": "HIGH",
"acceptanceCriterion": "Unused-route proof; passing affected tests; satisfied functionality inventory",
"requiredAction": "Prepare and approve a concrete candidate with caller/route/inventory/rollback proof and affected native regression; retain every active compatibility path.",
"requiredAction": "Assessment-only P10-00 may establish eligibility after protected activation; no deletion proof is required to inspect an inventory. Require exact static/dynamic/route/old-data proof, rollback and affected tests plus protected scope approval before P10-01 or any removal.",
"blockingPhase": [
"PHASE-10: each removal candidate"
],
@@ -41,16 +41,18 @@
},
{
"id": "AUTO-RUNTIME-01",
"description": "Current single-user controller reports real MXC canary PASS, but no actual owner key or ChatGPT sign-in, operator-controlled policy and disabled real execution; current-context qualification/activation remains incomplete.",
"description": "Read-only current public observation confirms configured owner key, matching public certificate pin, auth file present and fresh real-key/canary PASS with matching binding. Policy remains operator-controlled and queue disabled; auth session validity not independently tested.",
"evidence": [
"CONTROLLER_ADDENDUM.md",
"READY_TO_RUN.md",
"controller-current-native-qualification-json",
"controller-current-setup-results-json"
"controller-current-setup-results-json",
"final-entry-controller-status",
"FINAL_DEVELOPMENT_ENTRY.md"
],
"severity": "HIGH",
"acceptanceCriterion": "Independent qualified execution boundary",
"requiredAction": "Operator must sign into dedicated auth-only profile, configure the actual protected owner key and qualify its host-positive/worker-negative boundary and fresh current-context controls, then independently approve runtime/queue/entry policy. Existing same-user MXC mode does not require a new account or VM; its finite canaries do not qualify actual owner credentials or roadmap execution. This handoff must not operate that runtime.",
"requiredAction": "Owner checks auth-status, refreshes qualification only if expired/changed (current observation expires30October17:33UTC), and deliberately enables qualified runtime plus exact protected entry/policy approvals after adapter/scope qualification. No key recreation or extra account/VM indicated.",
"blockingPhase": [
"AUTOMATIC_PHASE-10_EXECUTION"
],
@@ -104,9 +106,11 @@
},
{
"id": "HUMAN-01",
"description": "Physical device, keyboard/AT/contrast, human EN/Bokmål, typography and actual printing acceptance are not provided.",
"description": "Owner personally approved current UI/CV/PDF visual presentation for development. Physical printing, physical-device/AT/contrast and proficient language/workflow tests retain actual unfinished status; aggregate human acceptance is not passed.",
"evidence": [
"MANUAL_ACCEPTANCE.md"
"MANUAL_ACCEPTANCE.md",
"PDF_VISUAL_APPROVAL.json",
"FINAL_DEVELOPMENT_ENTRY.md"
],
"severity": "MODERATE",
"acceptanceCriterion": "Genuine human/device/language/print acceptance",
@@ -1,3 +1,5 @@
> **30 October2026 — final owner visual approval and development-entry review.** PDF/UI appearance is owner-approved for development; metric36/36 per platform retained. Pre-Phase10 preparation conditionally closed. [FINAL_DEVELOPMENT_ENTRY.md](FINAL_DEVELOPMENT_ENTRY.md) identifies only the remaining adapter, signed scope/baseline policy and protected activation barriers. Physical printing/device/AT remain unperformed; production NO-GO. Fresh public status confirms a configured owner key and matching real-key qualification, superseding earlier missing-key claims. No Phase10 execution occurred.
# External controller snapshot reconciliation — 29 October 2026
At final review the external worktree advanced from the initially inspected c1663df to **140e182516e86c8718054cf0907593fcd6a38aa7**, branch `codex/autonomous-roadmap-single-user`. This addendum supersedes current-runtime statements based only on the earlier snapshot. Only committed Git objects were read; no external worktree file, setup, login, key, runtime, process, policy or schedule was modified or run by this handoff.
@@ -12,8 +12,8 @@
"generatedUtc": "2026-10-29T23:37:45.931733+00:00",
"cleanupScope": {
"disposition": "ASSESSMENT_ONLY_NO_REMOVALS_APPROVED",
"inventory": "CLEANUP_INVENTORY.md:19 retain/assessment entries, no proven unused product deletion",
"proposedFirstAction": "Only after independent protected permission: assess one named candidate for static/dynamic/route/historical-data callers, preservation tests and rollback. Stop before removal until exact scope is approved.",
"inventory": "CLEANUP_INVENTORY.md:19 retain/assessment entries;57preservation groups/34routes; no proven unused deletion",
"proposedFirstAction": "After protected activation, PHASE-10/P10-00 only: accepted baseline and deletion-eligibility inventory, no product edits/removals/migrations/dependency changes. Stop after P10-00; signed candidate-specific-cleanup-scope before P10-01. Target existing feature/phase10-cleanup branch, preserve canonical/history/RD21/contracts.",
"approvedRemovalCandidates": [],
"implementationPermission": false
},
@@ -23,7 +23,7 @@
"unchangedRevisedOracle": "FAIL",
"proposedBaselineDiagnostic": "PASS_OWNER_APPROVED_S01_Y_METRIC",
"metricDisposition": "OWNER_APPROVED_S01_METRIC_ONLY",
"humanVisual": "NOT_TESTED",
"humanVisual": "OWNER_APPROVED_FOR_DEVELOPMENT",
"actualPrinting": "NOT_TESTED"
},
"outstandingBlockerIds": [
@@ -90,7 +90,7 @@
},
{
"id": "runtime-test-adapter-policy",
"action": "Qualify actual owner key/sign-in/current-context runtime and real composite adapter; adopt exact baseline/policy independently. No queue activation is performed here.",
"action": "Qualify the actual composite adapter, adopt final candidate and P10-00 stop through signed policy; verify auth-status and existing real-key qualification freshness, then owner-controlled activation. Real key is configured; no automatic queue start.",
"state": "PENDING",
"authority": "EXTERNAL_PROTECTED_OWNER_OR_OPERATOR_DECISION"
},
@@ -106,7 +106,10 @@
"../../../p10-entry-final/REPORT.md",
"../../../p10-entry-final/S01_CLASSIFICATION.json",
"p10-entry-final/review/manifest.json",
"../../../p10-entry-final/OWNER_REVIEW.md"
"../../../p10-entry-final/OWNER_REVIEW.md",
"FINAL_DEVELOPMENT_ENTRY.md",
"PDF_VISUAL_APPROVAL.json",
"final-entry-controller-status"
],
"publication": {
"status": "VERIFIED_CANDIDATE_SNAPSHOT",
@@ -0,0 +1,43 @@
# Final development entry review —30 October2026
**Pre-Phase10 implementation/preparation: CLOSED with the existing conditional development acceptance. Phase10 autonomous execution: NO-GO pending only the three mandatory control-plane conditions below. Production: NO-GO.** The owner personally approved current UI and revised CV/PDF appearance for moving toward development; [PDF_VISUAL_APPROVAL.json](PDF_VISUAL_APPROVAL.json) records that direct decision separately from physical printing and protected activation. This closes PDF visual/spacing acceptance for the reviewed development scope. It does not certify accessibility, physical devices, language or printing.
## Existing evidence is sufficient for this preparation
Reviewed published checkpoint214dbd6c4d173db72cba18959dd8f81c7fc67f64, on `test/pre-phase10-ux-acceptance`, was clean and matched the independently queried remote. The frozen application/test source isba04d817fed26d659bfa2a56b089d6cac851dc34; rendering fix154a9e8 precedes it. All later changes concern evidence, metric verification and owner decisions. No post-S01 application, font, parser, renderer, fixture, document or product test source changed. Existing source manifests and Git scope checks prove correspondence.
The existing1448backend/1031frontend tests,51 affected Windows browser cases, separate import8/MariaDB90+3/RD216/admission1/Linux8, Python83+Docling14 and both-platform native exports remain applicable. Approved S01 requalification is36/36 per platform with the same2mm limit; original28/20 cell-top failures remain historical raw evidence. This metric-only change did not change a generated PDF. READY_TO_RUN permits bounded documentation-only descendants and requires affected qualification when application/test source changes; the Phase10 source prompt requires fresh applicable tests for its future checkpoints. Neither requires rerunning unchanged product suites or exports just to record this approval. **No mandatory post-S01 product regression or export run is missing.** Only handoff/schema/authority checks are rerun for this metadata change; their current report supersedes the prior27, never adds to it.
Current handoff result: **28/28 PASS**, including the new check that visual approval cannot be broadened into unperformed physical printing. Existing application/browser/provider/PDF totals are carried with their actual execution commits, not reported as new runs. No new audit, model inference or document export was performed.
## Exact proposed baseline and scope
`ENTRY_PROPOSAL.json.candidateCommit` names the normally pushed, independently read-back closure candidate. `TEST_EVIDENCE.json.testedCommit` remains the frozen application snapshotba04d817; it is intentionally a different identity. The final documentation envelope can be a descendant only within this handoff directory. At the real protected approval, resolve final clean local/remote HEAD again and bind candidate, application/source/evidence hashes and actual manifest/prompt policy. Do not adopt main or the controller's old5032ccb policy by assumption.
Propose **PHASE-10 / P10-00 only**, on the existing manifest's `feature/phase10-cleanup` branch after protected activation: establish the accepted baseline and evidence-backed deletion eligibility inventory. Reuse CLEANUP_INVENTORY.md's19 entries and the57-preservation/34-route register. Deliver candidate caller/route/export/dynamic/old-data census, affected preservation IDs, rollback and proposed focused tests. It is valid to conclude that nothing is eligible. **No product edit, deletion, migration, dependency change, provider/model activation, main merge or deployment is in this initial scope.** No deletion candidate has been proved unused. Stop after P10-00 and require a protected `candidate-specific-cleanup-scope` decision before P10-01. Do not turn assessment permission into permission to remove active compatibility paths. This task has not begun P10-00.
## Only remaining mandatory barriers to autonomous entry
1. **AUTO-ADAPTER-01 — real composite adapter.** The installed policy's `qualified-provider-browser-python-pdf-security-preservation` check is still `configured:false`, including P10-00. The controller/platform owner must install and qualify actual commands, trusted parsers, exact nonempty suite membership, source/freshness/report/cleanup contracts and the necessary isolated runtime capabilities. A wrapper returning0 or `configured:true` is insufficient. Existing canaries deliberately deny worker network access; provider/browser/Docker permissions need explicit isolated qualification, not a silent bypass or use of production services. Existing application results satisfy preparation; they do not install this runtime adapter.
2. **AUTO-SCOPE-01 / P10-ENTRY-01 — signed final baseline and bounded policy.** Installed baseline remains5032ccb, execution disabled, checkpoint deferrableGates empty, and P10-00 has no after-checkpoint candidate-scope approval. After adapter qualification, the operator must prepare/review the exact manifest adopting the proposed published candidate, retaining stage order and security limits, and adding the protected P10-00 stop before P10-01. Existing source-authorised debt must be explicitly scoped if any conditional checkpoint is to advance; do not add blanket deferrals. Submit that exact manifest through `configure`/`approve`/`configure`, then the exact protected environment, roadmap and Phase10 entry requests. This chat's approval is not a signature for those requests.
3. **AUTO-RUNTIME-01 — owner-controlled activation.** Read-only public observation at07:36UTC (08:36Paris) found the owner key configured and public certificate pin matching; auth file present; real-key negative probe PASS, binding matching, all canaries PASS; no recovery required; all stages PENDING. Qualification issued29October17:33UTC and expires30October17:33UTC (18:33Paris). Actual auth session validity was not tested and no credential content read. Policy is still `operator-controlled` and queue disabled. The operator must check `auth-status`, refresh qualification only if expired/changed, then deliberately enable the qualified runtime and complete protected policy/entry approvals. No key recreation, repeated canary run while still valid, second account or VM is presently indicated. Start independently rechecks these conditions.
The read-only observation is indexed as `final-entry-controller-status`; it is dated evidence, not a permanent runtime readiness claim. It supersedes older assertions that no actual owner key/auth file/real-key qualification existed. We did not execute a controller command, write its state, inspect auth contents, sign, enable a queue or mutate its worktree.
## Debt retained, not passed or universally blocking P10-00
| Item | Permitted scope and retained condition |
|---|---|
| HUMAN-01 | Owner's PDF/UI appearance approval recorded. Physical printing/device/AT/contrast and proficient EN/Bokmål checks remain NOT TESTED. Phase9 request246–252/426–439 permits genuine unfinished human checks as release debt; affected future candidates still need preservation/disposition. |
| AI-CV-01 | Real compatibility/accuracy BLOCKED; optional adapter stays disabled. CV-import acceptance permits model-independent conditional development, not activation or near100% claims. |
| DET-RECALL-01 / AI-CONTEXT-01 | Existing deterministic recall/review burden and canonical-to-generic-AI context gap remain limited. Preserve source review, unknowns and old text/run behavior; not permission to delete those paths. |
| PYSEC-01 | Existing scoped Python CONDITIONAL disposition persists, including incomplete vendor Torch404 advisory coverage. No security-risk waiver; changing affected processing/security paths needs its own qualification. |
| CI-01 | Hosted isolation/CI remains BLOCKED; existing local provider evidence remains distinct. Source CI-M01 permits operator-blocked hosted evidence while local qualification continues. If an adopted adapter requires hosted CI, it becomes mandatory for that checkpoint. |
| MYSQL-TLS-01 / OPS-01 / NATIVE-SEC-01 | Production TLS/advisories, filesystem/off-disk backup/restore, deployed/native-image/operator evidence stay unqualified. They do not justify changes or production operations during assessment-only P10-00. |
| FUTURE-01 | Later product/provider/model/translation/site/security/release initiatives retain their own gates and are outside this scope. |
Five conditional-development requests remain REQUESTED_NOT_GRANTED_OR_EXECUTABLE in the proposal, with individual source authority; no executable controller deferral is silently created by willingness to defer. Physical printing remains NOT TESTED. Human/device aggregate remains NOT TESTED. Hosted CI and CV AI remain BLOCKED. Production remains NO-GO.
## Protected request and smallest next actions
See [PROTECTED_ENTRY_REQUEST.md](PROTECTED_ENTRY_REQUEST.md). It is an unsigned decision brief, not a protected controller request. A genuine request cannot yet be eligible while the adapter is unconfigured and old policy is installed. The controller must create its own request with actual policy/manifest/baseline/checkpoint/artifact hashes; the owner alone reviews/signs in a real terminal. No approval JSON, signature, activation or automatic Phase10 execution is fabricated here.
@@ -1,3 +1,5 @@
> **30 October2026 — final owner visual approval and development-entry review.** PDF/UI appearance is owner-approved for development; metric36/36 per platform retained. Pre-Phase10 preparation conditionally closed. [FINAL_DEVELOPMENT_ENTRY.md](FINAL_DEVELOPMENT_ENTRY.md) identifies only the remaining adapter, signed scope/baseline policy and protected activation barriers. Physical printing/device/AT remain unperformed; production NO-GO. Fresh public status confirms a configured owner key and matching real-key qualification, superseding earlier missing-key claims. No Phase10 execution occurred.
> **30 October 2026 — metric-only owner approval recorded.** See [S01_APPROVAL.md](S01_APPROVAL.md). Revised S01 now passes36/36 per platform under the approved same2mm vertical baseline metric; original28/20 failures remain unchanged. Human PDF spacing remains PARTIAL; Phase10 and production NO-GO. This supersedes only the metric-pending statements below.
> **P10-ENTRY-FINAL addendum — 30 October 2026 (Europe/Paris).** The revised-name clipping correction is application commit154a9e8; the current source-bound candidate is in ACCEPTANCE.json/ENTRY_PROPOSAL.json. Read [the complete current report](../../../p10-entry-final/REPORT.md), [native PDF guide](../../../p10-entry-final/REVIEW_GUIDE.md) and [owner actions](../../../p10-entry-final/OWNER_REVIEW.md). Original S01 failures28Windows/20Linux remain FAIL pending explicit metric disposition; actual accent clipping is fixed on the finite corpus. Phase10 and production NO-GO; automatic execution false. No deletion scope, protected approval, model qualification or controller activation is supplied.
@@ -1,3 +1,5 @@
> **30 October2026 — final owner visual approval and development-entry review.** PDF/UI appearance is owner-approved for development; metric36/36 per platform retained. Pre-Phase10 preparation conditionally closed. [FINAL_DEVELOPMENT_ENTRY.md](FINAL_DEVELOPMENT_ENTRY.md) identifies only the remaining adapter, signed scope/baseline policy and protected activation barriers. Physical printing/device/AT remain unperformed; production NO-GO. Fresh public status confirms a configured owner key and matching real-key qualification, superseding earlier missing-key claims. No Phase10 execution occurred.
> **30 October 2026 — metric-only owner approval recorded.** See [S01_APPROVAL.md](S01_APPROVAL.md). Revised S01 now passes36/36 per platform under the approved same2mm vertical baseline metric; original28/20 failures remain unchanged. Human PDF spacing remains PARTIAL; Phase10 and production NO-GO. This supersedes only the metric-pending statements below.
> **P10-ENTRY-FINAL addendum — 30 October 2026 (Europe/Paris).** The revised-name clipping correction is application commit154a9e8; the current source-bound candidate is in ACCEPTANCE.json/ENTRY_PROPOSAL.json. Read [the complete current report](../../../p10-entry-final/REPORT.md), [native PDF guide](../../../p10-entry-final/REVIEW_GUIDE.md) and [owner actions](../../../p10-entry-final/OWNER_REVIEW.md). Original S01 failures28Windows/20Linux remain FAIL pending explicit metric disposition; actual accent clipping is fixed on the finite corpus. Phase10 and production NO-GO; automatic execution false. No deletion scope, protected approval, model qualification or controller activation is supplied.
@@ -1,3 +1,5 @@
> **30 October2026 — final owner visual approval and development-entry review.** PDF/UI appearance is owner-approved for development; metric36/36 per platform retained. Pre-Phase10 preparation conditionally closed. [FINAL_DEVELOPMENT_ENTRY.md](FINAL_DEVELOPMENT_ENTRY.md) identifies only the remaining adapter, signed scope/baseline policy and protected activation barriers. Physical printing/device/AT remain unperformed; production NO-GO. Fresh public status confirms a configured owner key and matching real-key qualification, superseding earlier missing-key claims. No Phase10 execution occurred.
> **30 October 2026 — metric-only owner approval recorded.** See [S01_APPROVAL.md](S01_APPROVAL.md). Revised S01 now passes36/36 per platform under the approved same2mm vertical baseline metric; original28/20 failures remain unchanged. Human PDF spacing remains PARTIAL; Phase10 and production NO-GO. This supersedes only the metric-pending statements below.
> **P10-ENTRY-FINAL addendum — 30 October 2026 (Europe/Paris).** The revised-name clipping correction is application commit154a9e8; the current source-bound candidate is in ACCEPTANCE.json/ENTRY_PROPOSAL.json. Read [the complete current report](../../../p10-entry-final/REPORT.md), [native PDF guide](../../../p10-entry-final/REVIEW_GUIDE.md) and [owner actions](../../../p10-entry-final/OWNER_REVIEW.md). Original S01 failures28Windows/20Linux remain FAIL pending explicit metric disposition; actual accent clipping is fixed on the finite corpus. Phase10 and production NO-GO; automatic execution false. No deletion scope, protected approval, model qualification or controller activation is supplied.
@@ -0,0 +1,33 @@
# Owner decision brief — NOT a protected request or signature
**Current recommendation: NO-GO for starting the autonomous orchestrator.** App/PDF preparation is conditionally closed; resolve the three control-plane items in FINAL_DEVELOPMENT_ENTRY.md. Do not run start/resume against the old5032ccb policy or enable a placeholder adapter.
Proposed decision text for the owner's later review (not a decision made by this file):
> Adopt the exact clean published candidate named by ENTRY_PROPOSAL.json and independently resolved final evidence-envelope HEAD, together with its source/evidence/manifest/prompt hashes. Permit PHASE-10/P10-00 baseline and deletion-eligibility assessment only, with no product edits or removals. Preserve all57 contracts/34 routes, canonical Career Profile, historical CV/letter revisions, import review/legacy readers and RD21/provider protections. Stop after P10-00; require protected candidate-specific-cleanup-scope approval before P10-01. Keep optional CV AI disabled, production NO-GO, and the five source-scoped debt requests separately identified. Do not silently enable conditional advancement, later initiative implementation, main merge or deployment.
No exact unused deletion candidate is asserted. P10-00 must produce the proof or report none. Actual scope approval must name the subsequent candidate, affected callers/routes/old data, rollback and tests; this brief cannot supply that missing proof.
The platform/controller maintainer first supplies a **qualified composite test adapter and owner-prepared manifest** for this exact scope. It must retain the seven stage IDs/order, add the protected stop after P10-00, and use qualified report membership/runtime permissions. Only then use the existing operator terminal flow from the installed SINGLE_USER.md:
```powershell
. "$HOME\.jobjakt-backlog\single-user-local\Use-JobjaktBacklog.ps1"
Jobjakt auth-status
Jobjakt status
Jobjakt dry-run
```
If authentication is unavailable, use `Jobjakt auth` yourself. If qualification expired or binding changed, use `Jobjakt qualify`; the observation on30October was already real-key PASS and matching until17:33UTC/18:33Paris, so do not recreate the key or repeat valid qualification just to increase evidence.
After reviewing the qualified adapter and runtime evidence, the operator may deliberately select `Jobjakt enable-unattended`; this requires typed confirmation and **does not itself approve Phase10 or enable the roadmap**. For the actual reviewed, schema-valid manifest file, use:
```powershell
# Replace with the actual maintainer-qualified manifest path; none is supplied as executable policy here.
Jobjakt configure -Manifest '<actual-reviewed-qualified-manifest.json>'
Jobjakt approve
Jobjakt configure -Manifest '<same-exact-reviewed-qualified-manifest.json>'
```
The first configure creates a protected `manifest-policy-update` request and stops. `approve` shows its exact payload, requires a random typed challenge, Approve/Revise/Reject and concrete decision text, then uses the real owner key. The second configure adopts only the signed exact manifest. Changed policy/evidence requires a new request; do not replay an old signature.
**Stop at this gate.** Environment-qualified, roadmap-execution and phase10-development-entry remain independent protected requests. Only after the controller's actual eligibility checks pass and the owner signs each requested exact scope should the owner deliberately invoke start/resume. There is no safe generic “approve everything” command or activation granted by this brief. No controller command in this guide was executed by this task.
@@ -1,3 +1,5 @@
> **30 October2026 — final owner visual approval and development-entry review.** PDF/UI appearance is owner-approved for development; metric36/36 per platform retained. Pre-Phase10 preparation conditionally closed. [FINAL_DEVELOPMENT_ENTRY.md](FINAL_DEVELOPMENT_ENTRY.md) identifies only the remaining adapter, signed scope/baseline policy and protected activation barriers. Physical printing/device/AT remain unperformed; production NO-GO. Fresh public status confirms a configured owner key and matching real-key qualification, superseding earlier missing-key claims. No Phase10 execution occurred.
> **30 October 2026 — metric-only owner approval recorded.** See [S01_APPROVAL.md](S01_APPROVAL.md). Revised S01 now passes36/36 per platform under the approved same2mm vertical baseline metric; original28/20 failures remain unchanged. Human PDF spacing remains PARTIAL; Phase10 and production NO-GO. This supersedes only the metric-pending statements below.
> **P10-ENTRY-FINAL addendum — 30 October 2026 (Europe/Paris).** The revised-name clipping correction is application commit154a9e8; the current source-bound candidate is in ACCEPTANCE.json/ENTRY_PROPOSAL.json. Read [the complete current report](../../../p10-entry-final/REPORT.md), [native PDF guide](../../../p10-entry-final/REVIEW_GUIDE.md) and [owner actions](../../../p10-entry-final/OWNER_REVIEW.md). Original S01 failures28Windows/20Linux remain FAIL pending explicit metric disposition; actual accent clipping is fixed on the finite corpus. Phase10 and production NO-GO; automatic execution false. No deletion scope, protected approval, model qualification or controller activation is supplied.
@@ -3,7 +3,7 @@
"workstreamId": "AUTOMATION-HANDOFF-01",
"kind": "TEST_EVIDENCE",
"testedCommit": "ba04d817fed26d659bfa2a56b089d6cac851dc34",
"verifierCommit": "1a47f7ac1d9cddd647135ebee808a77301335016",
"verifierCommit": "39bf430401d86f894277fdd78e7eb88c58d81e8b",
"verifierSourceArtifactId": "verifier-source",
"sourceManifestArtifactId": "application-source-before",
"sourceAfterArtifactId": "application-source-after",
@@ -1613,36 +1613,6 @@
"sha256": "bb1b1ccfb03bd888e5e429f5a17c4c106246cfb852b990298236edc7c86c7016",
"description": "Scoped human-approved revised S01 qualification; no visual/entry/production approval"
},
{
"id": "verifier-source",
"path": "evidence/verifier-source.gz",
"sha256": "e76de49d94de3cc9dacc34fd8f2a6546a6612f3f00976064d9a3c3088beacdbd",
"description": "Scoped human-approved revised S01 qualification; no visual/entry/production approval"
},
{
"id": "p10-entry-proposal",
"path": "evidence/p10-entry-proposal.gz",
"sha256": "0a70b05b01a1468e4ff813d11ba33e763996a63d5e0dd9f0de0fd2d62a2e7104",
"description": "Scoped human-approved revised S01 qualification; no visual/entry/production approval"
},
{
"id": "p10-entry-proposal-schema",
"path": "evidence/p10-entry-proposal-schema.gz",
"sha256": "3d2f684f2cb608b76297d16293e19415ca6f02cfcee74446880dc845641b3f1e",
"description": "Scoped human-approved revised S01 qualification; no visual/entry/production approval"
},
{
"id": "verifier-process",
"path": "evidence/verifier-process.gz",
"sha256": "58fbde6eeec013acf6e6039dc17443f918e7258a2d3bec59a54955a73eb23b07",
"description": "Final27 combined unit/package negative tests, exact source and native process; supersedes overlapping old19"
},
{
"id": "handoff-validator-native",
"path": "evidence/handoff-validator-native.gz",
"sha256": "49122a150619736a99b0911f9c18441d515c336f3eebab55be345fba56563a62",
"description": "Final27 combined unit/package negative tests, exact source and native process; supersedes overlapping old19"
},
{
"id": "p10-final-gate-processes",
"path": "evidence/p10-final-gate-processes.gz",
@@ -1678,6 +1648,48 @@
"path": "evidence/s01-initial-package-negative-process.gz",
"sha256": "ae8141e2ab46517d68ccb9d8338d4e7670fe8880327c7735c883cdb5d0eb3050",
"description": "Superseded26/27 regression attempt: copied approval inconsistency detected and fixed; final27 replaces this, not additive"
},
{
"id": "pdf-visual-approval",
"path": "evidence/pdf-visual-approval.gz",
"sha256": "0dc3bcd1fb1100b562f3d4d3a83c41456a532c4489ec71d61d6dee04e921a07e",
"description": "Direct human appearance approval for development; not physical printing, device/AT or protected activation"
},
{
"id": "final-entry-controller-status",
"path": "evidence/final-entry-controller-status.gz",
"sha256": "d49c3c3749ec8024551d3e10d42b0944ab0e86d2b7cea8ec07f2167f74330e0c",
"description": "Dated read-only public status; real-key PASS/binding/freshness and disabled operator-controlled policy; no credential content or runtime operation"
},
{
"id": "verifier-source",
"path": "evidence/verifier-source.gz",
"sha256": "6d6ec2b962fe68712b0ee0ea6a68766426472d78437b65a6f7f3a5eb4eb4a740",
"description": "Exact seven-file verifier source including the two scoped direct-owner decisions"
},
{
"id": "p10-entry-proposal",
"path": "evidence/p10-entry-proposal.gz",
"sha256": "3a1b618b1e5fad0adc35c093ef318ebfd7be618653716c7e02386e893345a2af",
"description": "Evidence-only exact proposed baseline/scope, owner visual status and remaining protected decisions; no executable permission"
},
{
"id": "p10-entry-proposal-schema",
"path": "evidence/p10-entry-proposal-schema.gz",
"sha256": "99dc28e1d4d66272f9ef3be6f48d02d15cf1fdf8ef083d2a4076453b6a432bc0",
"description": "Evidence-only exact proposed baseline/scope, owner visual status and remaining protected decisions; no executable permission"
},
{
"id": "verifier-process",
"path": "evidence/verifier-process.gz",
"sha256": "cb69252fb1bbffe6d26149b5c67a23e94d0602e2929ca483573b5b0b6fc46e5c",
"description": "Final28 combined unit/package negative tests, exact source and native process; supersedes overlapping prior27"
},
{
"id": "handoff-validator-native",
"path": "evidence/handoff-validator-native.gz",
"sha256": "b0a525ce25265fc319c62d730e74c72de96482cc3db929b40a060e7b8fdd0938",
"description": "Final28 combined unit/package negative tests, exact source and native process; supersedes overlapping prior27"
}
],
"reports": [
@@ -2314,8 +2326,8 @@
{
"id": "handoff-validator",
"bindingScope": "HANDOFF_VERIFIER",
"sourceCommit": "1a47f7ac1d9cddd647135ebee808a77301335016",
"executedFromCommit": "1a47f7ac1d9cddd647135ebee808a77301335016",
"sourceCommit": "39bf430401d86f894277fdd78e7eb88c58d81e8b",
"executedFromCommit": "39bf430401d86f894277fdd78e7eb88c58d81e8b",
"status": "PASS",
"exitCode": 0,
"artifactId": "handoff-validator-native",
@@ -2323,19 +2335,19 @@
"processPointer": "/exitCode",
"nativeFormat": "node-test",
"counts": {
"passed": 27,
"passed": 28,
"failed": 0,
"skipped": 0,
"retries": 0,
"unexecuted": 0
},
"membershipSha256": "8052c122a6348a82e8740b97a92e7bd64ff2ce11f01102871a96469c2d6f229d",
"limits": "Final combined27; no invented approval; excludes overlapping old19. Native execution commit retained separately from verifier source snapshot."
"membershipSha256": "60f133d8e60e1593562f50799801491ef19763bc777d0948ad235fb2d4f99d00",
"limits": "Final combined28; no invented approval; excludes overlapping prior27. Native execution commit retained separately from verifier source snapshot."
},
{
"id": "s01-approved-qualification",
"bindingScope": "HANDOFF_VERIFIER",
"sourceCommit": "1a47f7ac1d9cddd647135ebee808a77301335016",
"sourceCommit": "39bf430401d86f894277fdd78e7eb88c58d81e8b",
"executedFromCommit": "1a47f7ac1d9cddd647135ebee808a77301335016",
"status": "PASS",
"exitCode": 0,
@@ -2351,7 +2363,7 @@
"unexecuted": 0
},
"membershipSha256": "4f53cda18c2baa0c0354bb5f9a3ecbe5ed12ab4d8e11ba873c2f11161202b945",
"limits": "72 existing source-bound native documents requalified with owner-approved same2mm S01 vertical baseline metric. All other failures retained; no new PDF rendering, product cases or human approval."
"limits": "72 existing source-bound native documents requalified with owner-approved same2mm S01 vertical baseline metric. All other failures retained; no new PDF rendering, product cases or human approval. Visual-approval metadata descendant changes no geometry logic; actual executedFromCommit remains recorded."
},
{
"id": "p10-proposal-schema",
@@ -1,3 +1,5 @@
> **30 October2026 — final owner visual approval and development-entry review.** PDF/UI appearance is owner-approved for development; metric36/36 per platform retained. Pre-Phase10 preparation conditionally closed. [FINAL_DEVELOPMENT_ENTRY.md](FINAL_DEVELOPMENT_ENTRY.md) identifies only the remaining adapter, signed scope/baseline policy and protected activation barriers. Physical printing/device/AT remain unperformed; production NO-GO. Fresh public status confirms a configured owner key and matching real-key qualification, superseding earlier missing-key claims. No Phase10 execution occurred.
> **30 October 2026 — metric-only owner approval recorded.** See [S01_APPROVAL.md](S01_APPROVAL.md). Revised S01 now passes36/36 per platform under the approved same2mm vertical baseline metric; original28/20 failures remain unchanged. Human PDF spacing remains PARTIAL; Phase10 and production NO-GO. This supersedes only the metric-pending statements below.
> **P10-ENTRY-FINAL addendum — 30 October 2026 (Europe/Paris).** The revised-name clipping correction is application commit154a9e8; the current source-bound candidate is in ACCEPTANCE.json/ENTRY_PROPOSAL.json. Read [the complete current report](../../../p10-entry-final/REPORT.md), [native PDF guide](../../../p10-entry-final/REVIEW_GUIDE.md) and [owner actions](../../../p10-entry-final/OWNER_REVIEW.md). Original S01 failures28Windows/20Linux remain FAIL pending explicit metric disposition; actual accent clipping is fixed on the finite corpus. Phase10 and production NO-GO; automatic execution false. No deletion scope, protected approval, model qualification or controller activation is supplied.
@@ -1,3 +1,5 @@
> **30 October2026 — final owner visual approval and development-entry review.** PDF/UI appearance is owner-approved for development; metric36/36 per platform retained. Pre-Phase10 preparation conditionally closed. [FINAL_DEVELOPMENT_ENTRY.md](FINAL_DEVELOPMENT_ENTRY.md) identifies only the remaining adapter, signed scope/baseline policy and protected activation barriers. Physical printing/device/AT remain unperformed; production NO-GO. Fresh public status confirms a configured owner key and matching real-key qualification, superseding earlier missing-key claims. No Phase10 execution occurred.
> **30 October 2026 — metric-only owner approval recorded.** See [S01_APPROVAL.md](S01_APPROVAL.md). Revised S01 now passes36/36 per platform under the approved same2mm vertical baseline metric; original28/20 failures remain unchanged. Human PDF spacing remains PARTIAL; Phase10 and production NO-GO. This supersedes only the metric-pending statements below.
> **P10-ENTRY-FINAL addendum — 30 October 2026 (Europe/Paris).** The revised-name clipping correction is application commit154a9e8; the current source-bound candidate is in ACCEPTANCE.json/ENTRY_PROPOSAL.json. Read [the complete current report](../../../p10-entry-final/REPORT.md), [native PDF guide](../../../p10-entry-final/REVIEW_GUIDE.md) and [owner actions](../../../p10-entry-final/OWNER_REVIEW.md). Original S01 failures28Windows/20Linux remain FAIL pending explicit metric disposition; actual accent clipping is fixed on the finite corpus. Phase10 and production NO-GO; automatic execution false. No deletion scope, protected approval, model qualification or controller activation is supplied.