1.5 KiB
Dashboard publication and Gate F receipt
3 November 2026. Implementation c7d26d354c44b0bdd2976cf2f1c2b0737d7cc2d2 on codex/a3-ui-03 was pushed successfully. Independent git ls-remote --heads origin refs/heads/codex/a3-ui-03 returned the same full hash. Committed source/evidence manifest verification returned zero mismatches (23 sources,42 evidence artifacts; export hashes retained separately).
Navigation Gate F is accepted by the owner's exact reply "Approve navigation and A3-IM03". Dashboard/onboarding Gate F is now pending; the question submitted in this chat requests acceptance and progression to A3-IM04 B1 application table/Kanban/full detail pages, retaining actions, revision/permission protections and right-side context. Do not begin that dependent work until answered. Independent localisation continues separately; no automatic branch combination.
See qualification and desktop capture, mobile walkthrough. UI03's checklist item for owner acceptance remains open deliberately. This receipt does not accept Phase10, security or release readiness.
Git printed Windows filename-too-long warnings for unrelated Codex turn-diff checkpoint refs during commit. The application branch commit, source-manifest check, push and independent remote readback succeeded. No Git infrastructure/refs/hooks/configuration was repaired or bypassed. Worktree is clean except existing untracked generated graphify-out.