216 lines
6.5 KiB
Markdown
216 lines
6.5 KiB
Markdown
# Jobjakt — Gate F Approval and Continued Autonomous Development
|
|
|
|
## Owner decision: APPROVED
|
|
|
|
I approve the **A3 UI-01 Foundation checkpoint under Gate F**.
|
|
|
|
The approved checkpoint includes:
|
|
|
|
- Updated palette and typography.
|
|
- Shared UI controls.
|
|
- Quieter, more consistent surfaces.
|
|
- Light and dark theme foundations.
|
|
- English and Norwegian compatibility.
|
|
- Responsive foundation across the tested viewport widths.
|
|
|
|
Reported verification:
|
|
|
|
- 35 targeted tests passed.
|
|
- 48 scoped browser/accessibility checks passed.
|
|
- TypeScript typecheck passed.
|
|
- Lint passed.
|
|
- Build passed.
|
|
- Application commit: `bdd1de0d`.
|
|
- Latest branch receipt: `0d6de714`.
|
|
- Remote publication verified.
|
|
|
|
This approval authorises progression beyond the foundation increment.
|
|
|
|
It does not constitute production acceptance or waive unperformed integration, accessibility, security or release testing.
|
|
|
|
## 1. Continue A3 implementation
|
|
|
|
Proceed immediately with the next authorised A3 milestone: **navigation**.
|
|
|
|
Preserve the approved A3 design direction:
|
|
|
|
- D1 visual foundation.
|
|
- Original A1 dashboard.
|
|
- B1 application tracking.
|
|
- Labelled, grouped and collapsible desktop sidebar.
|
|
- Hybrid mobile navigation.
|
|
- CV editor left and live preview right.
|
|
- Full application-detail pages with contextual information on the right.
|
|
- Career Profile overview first.
|
|
- Calendar agenda first, with month-view option.
|
|
- Automation controls under Settings.
|
|
- Contextual, optional AI assistance.
|
|
- Optional, resumable onboarding.
|
|
|
|
Do not restart design exploration.
|
|
|
|
## 2. Complete as much authorised work as possible
|
|
|
|
I want you to continue development autonomously, making substantial progress without unnecessary interruptions.
|
|
|
|
After navigation, proceed through the remaining A3 milestones in their approved dependency order:
|
|
|
|
- Dashboard and application tracking.
|
|
- Application details.
|
|
- Career Profile.
|
|
- CV Builder and import workflows.
|
|
- Cover-letter editing.
|
|
- Job discovery.
|
|
- Calendar and correspondence.
|
|
- Documents and administration.
|
|
- Settings and automation.
|
|
- Optional onboarding.
|
|
- Responsive mobile refinement.
|
|
- Integrated UI/UX qualification.
|
|
|
|
Follow the actual approved A3 implementation plan and existing preservation requirements.
|
|
|
|
For each increment:
|
|
|
|
1. Inspect the existing implementation.
|
|
2. Implement the approved changes.
|
|
3. Fix bounded defects.
|
|
4. Run relevant tests.
|
|
5. Validate responsive layouts and both themes.
|
|
6. Verify English/Norwegian behaviour.
|
|
7. Check accessibility.
|
|
8. Verify preservation of existing functionality.
|
|
9. Commit validated changes.
|
|
10. Push where available.
|
|
11. Record evidence and continuation status.
|
|
12. Proceed to the next authorised increment.
|
|
|
|
Avoid repeatedly asking permission for ordinary reversible implementation decisions already covered by the approved design.
|
|
|
|
## 3. Milestone approvals
|
|
|
|
I want maximum autonomous progress, but genuine mandatory owner gates remain in force.
|
|
|
|
Where the approved implementation plan requires an owner milestone review:
|
|
|
|
- Complete the increment.
|
|
- Prepare the review evidence and screenshots.
|
|
- Record the exact proposed next scope.
|
|
- Request the required approval.
|
|
- Do not bypass that gate.
|
|
|
|
While awaiting approval, continue other independently authorised tasks that do not depend on the blocked milestone.
|
|
|
|
Do not treat my Gate F approval as blanket approval of all future protected gates.
|
|
|
|
Where the authoritative plan allows automatic progression, proceed without stopping.
|
|
|
|
## 4. Preserve the complete application
|
|
|
|
The A3 design handoff identifies 57 preservation groups and 34 routes.
|
|
|
|
Ensure every existing function remains available unless removal has been separately authorised and qualified.
|
|
|
|
Pay particular attention to:
|
|
|
|
- Career Profile persistence.
|
|
- CV revisions and undo/redo.
|
|
- Existing CV and cover-letter documents.
|
|
- Imports and exports.
|
|
- Authentication and account security.
|
|
- Job application data.
|
|
- Dashboard customisation.
|
|
- Administration permissions.
|
|
- RD21 data-integrity protections.
|
|
- Existing integrations and automations.
|
|
|
|
Do not simplify away advanced features merely because they were absent from a design prototype.
|
|
|
|
## 5. Continue the wider roadmap
|
|
|
|
Continue independently eligible work across:
|
|
|
|
1. Phase 10 completion and acceptance.
|
|
2. PRODUCT-REVIEW-01.
|
|
3. International Global Job Search.
|
|
4. Full European localisation.
|
|
5. A3 application UI/UX implementation.
|
|
6. Multilingual homepage redesign.
|
|
7. Security audit and remediation.
|
|
8. Release-readiness preparation.
|
|
|
|
Respect dependencies, explicit owner decisions and authoritative acceptance gates.
|
|
|
|
Coordinate Global Job Search, translations and A3 so their implementations do not conflict.
|
|
|
|
Do not repeat accepted work unnecessarily.
|
|
|
|
## 6. Blockers and continuation
|
|
|
|
If a task cannot proceed:
|
|
|
|
- Record the exact blocker.
|
|
- Identify its impact and dependency.
|
|
- Preserve completed work.
|
|
- Continue another independently eligible task.
|
|
- Revisit the blocker only when new evidence or an approval makes progress possible.
|
|
|
|
Maintain the existing durable roadmap continuation records.
|
|
|
|
Do not build or reactivate the autonomous orchestrator.
|
|
|
|
Do not spend development time fixing unrelated Git infrastructure issues.
|
|
|
|
Never claim unsuccessful publication or unperformed tests passed.
|
|
|
|
## 7. Validation expectations
|
|
|
|
Continue targeted verification throughout development.
|
|
|
|
Run broader regression suites when required by the approved milestone gates.
|
|
|
|
Keep these statuses distinct:
|
|
|
|
- Implemented.
|
|
- Tested.
|
|
- Accepted.
|
|
- Published.
|
|
- Production-ready.
|
|
|
|
The UI-01 browser checks do not qualify real backend journeys, native-device accessibility or integrated security.
|
|
|
|
Those requirements remain open.
|
|
|
|
## 8. Git and production restrictions
|
|
|
|
Use the existing authorised development branches and worktrees.
|
|
|
|
Verify the correct integration baseline before combining workstreams.
|
|
|
|
Commit and publish validated checkpoints when possible.
|
|
|
|
Do not merge into `main`.
|
|
|
|
Do not deploy production.
|
|
|
|
Do not activate unqualified AI models.
|
|
|
|
Do not perform destructive migrations without approval.
|
|
|
|
## Final instruction
|
|
|
|
**Gate F is approved for the A3 UI-01 Foundation checkpoint.**
|
|
|
|
Proceed immediately to navigation implementation.
|
|
|
|
Then continue through as much of the remaining authorised A3 overhaul and wider Jobjakt roadmap as possible.
|
|
|
|
Prioritise completing functional, integrated user journeys rather than accumulating disconnected partial implementations.
|
|
|
|
Minimise unnecessary interruptions.
|
|
|
|
Pause only for genuine mandatory decisions, and continue independent work whenever another task is blocked.
|
|
|
|
Keep the roadmap, test evidence and remaining approval items updated.
|
|
|
|
Do not merge into main or deploy production. |