Files
jobtrackingapp/docs/global-jobs/00/README.md
T

24 lines
2.1 KiB
Markdown
Raw Blame History

This file contains ambiguous Unicode characters
This file contains Unicode characters that might be confused with other characters. If you think that this is intentional, you can safely ignore this warning. Use the Escape button to reveal them.
# INT-GLOBAL-JOBS-01 — GJ-00 planning checkpoint
28 October 2026. **Planning/research only. Design: CONDITIONAL GO for review. GJ-01 implementation: NO-GO. Production: NO-GO.**
This is a proposed architecture, not implemented behavior or owner sign-off. The authoritative [prompt pack](../../planning/global-jobs-prompts/README.md) governs each later stage. Stop after GJ-00; obtain the next stage instruction and entry decisions before implementation.
| Deliverable | Purpose |
|---|---|
| [Product requirements](PRODUCT_REQUIREMENTS.md) | Journeys, preferences, languages and discovery experience |
| [Provider rights matrix](PROVIDER_RIGHTS_MATRIX.md) | Dated official evidence, capabilities, commercial and lifecycle limits |
| [Cross-industry taxonomy](CROSS_INDUSTRY_TAXONOMY.md) | Occupations, aliases, skills, national mappings and benchmark |
| [Geography decisions](GEOGRAPHY_DECISIONS.md) | Typed locations, exact refinement rules, radius and data licences |
| [Architecture ADRs](ARCHITECTURE_ADRS.md) | Existing owners, proposed contracts, processing, integrity and migration |
| [Dependencies and gates](DEPENDENCIES_AND_GATES.md) | Current source authority and independent entry decisions |
| [Implementation checkpoints](IMPLEMENTATION_CHECKPOINTS.md) | Ordered GJ-01–08 execution plan and file/test ownership |
| [Acceptance matrix](ACCEPTANCE_MATRIX.md) | Checkable future acceptance and evidence boundaries |
| [Owner actions](OWNER_ACTIONS.md) | External approvals and exact operator handoffs |
| [Evidence](EVIDENCE.md) | Research/verification ledger and publication procedure |
| [TODO](TODO.md) | Bounded GJ-00 checklist and deferred execution |
Source baseline: `4a8c907d70cbed235728f7d690b5409e72b93abe`, remote-confirmed `test/cv-integration-acceptance`. Planning branch: `planning/int-global-jobs-00`. No application, migration, Docker, AI or production change belongs to this checkpoint.
Recommendation: review this design now; **do not begin GJ-01** until Phase 10, PRODUCT-REVIEW-01 and initiative entry approval are evidenced. NAV consumer registration and UK licensing can proceed as separate owner actions, without blocking unrelated planning.