24 lines
2.1 KiB
Markdown
24 lines
2.1 KiB
Markdown
# INT-GLOBAL-JOBS-01 — GJ-00 planning checkpoint
|
||
|
||
28 October 2026. **Planning/research only. Design: CONDITIONAL GO for review. GJ-01 implementation: NO-GO. Production: NO-GO.**
|
||
|
||
This is a proposed architecture, not implemented behavior or owner sign-off. The authoritative [prompt pack](../../planning/global-jobs-prompts/README.md) governs each later stage. Stop after GJ-00; obtain the next stage instruction and entry decisions before implementation.
|
||
|
||
| Deliverable | Purpose |
|
||
|---|---|
|
||
| [Product requirements](PRODUCT_REQUIREMENTS.md) | Journeys, preferences, languages and discovery experience |
|
||
| [Provider rights matrix](PROVIDER_RIGHTS_MATRIX.md) | Dated official evidence, capabilities, commercial and lifecycle limits |
|
||
| [Cross-industry taxonomy](CROSS_INDUSTRY_TAXONOMY.md) | Occupations, aliases, skills, national mappings and benchmark |
|
||
| [Geography decisions](GEOGRAPHY_DECISIONS.md) | Typed locations, exact refinement rules, radius and data licences |
|
||
| [Architecture ADRs](ARCHITECTURE_ADRS.md) | Existing owners, proposed contracts, processing, integrity and migration |
|
||
| [Dependencies and gates](DEPENDENCIES_AND_GATES.md) | Current source authority and independent entry decisions |
|
||
| [Implementation checkpoints](IMPLEMENTATION_CHECKPOINTS.md) | Ordered GJ-01–08 execution plan and file/test ownership |
|
||
| [Acceptance matrix](ACCEPTANCE_MATRIX.md) | Checkable future acceptance and evidence boundaries |
|
||
| [Owner actions](OWNER_ACTIONS.md) | External approvals and exact operator handoffs |
|
||
| [Evidence](EVIDENCE.md) | Research/verification ledger and publication procedure |
|
||
| [TODO](TODO.md) | Bounded GJ-00 checklist and deferred execution |
|
||
|
||
Source baseline: `4a8c907d70cbed235728f7d690b5409e72b93abe`, remote-confirmed `test/cv-integration-acceptance`. Planning branch: `planning/int-global-jobs-00`. No application, migration, Docker, AI or production change belongs to this checkpoint.
|
||
|
||
Recommendation: review this design now; **do not begin GJ-01** until Phase 10, PRODUCT-REVIEW-01 and initiative entry approval are evidenced. NAV consumer registration and UK licensing can proceed as separate owner actions, without blocking unrelated planning.
|