43 lines
6.4 KiB
Markdown
43 lines
6.4 KiB
Markdown
# Owner decisions
|
|
|
|
## Redesign exploration — owner review pending
|
|
|
|
Five new directions are available at [the gallery](http://127.0.0.1:4327/) with a [side-by-side screenshot comparison](http://127.0.0.1:4327/compare.html). Source and evidence are published at `d8cf604c` on `codex/a3-ui-10`. The owner can select a direction or mix features and separately choose incremental route migration, a new shell retaining feature owners, or a full rebuild with demonstrated parity. Incremental route migration preserves the most established implementation contracts. Production UI replacement awaits both decisions. Independent roadmap work continues.
|
|
|
|
10 November 2026. The [roadmap TODO](ROADMAP_TODO.md) tracks current work and protected decisions. This record is for direct execution in chat.
|
|
|
|
## D01 — P10-01 / CLEAN-20
|
|
|
|
**APPROVED AND EXECUTED.** The owner replied “Approve CLEAN-20 only”. The approval covered the 38-line unimported `job-tracker-ui/src/App.css` at blob `74b5e053450a48a6bdb4d71aad648e7af821975c`. Verification and publication are in [P10-01](../redesign/phase-10/P10-01.md). Another removal needs its own evidence and approval.
|
|
|
|
## A3 implementation and final visual review
|
|
|
|
The owner selected A3, approved the implementation and approved progression through IM10. Final IM10 visual acceptance is pending a reviewable whole-application package. Read-only 2FA status and audit redaction are published. Factor recovery, private support access and live diagnostics each retain their separate decision.
|
|
|
|
## D02 — Phase 10 final bounded milestone
|
|
|
|
16 November qualification: [advisory addendum](../redesign/phase-10/ADVISORY_QUALIFICATION_ADDENDUM_2026-11-16.md). Frozen source declares/locks the same Next16.4.1 as the current failed build. Exact advisory/target/application relevance remain unqualified; recommend the queued official lookup before the milestone decision. Historical PASS receipts are not current security clearance. The original proposal/disposition/handoff remain byte-unchanged from59fd674f.
|
|
|
|
**READY FOR OWNER REVIEW.** Proposal published at `59fd674f4bb1d60939125430fa1d773af7288fcb` on `feature/phase10-cleanup`, with exact remote readback. Review [the acceptance proposal](../redesign/phase-10/ACCEPTANCE_PROPOSAL.md), [57-group disposition](../redesign/phase-10/PRESERVATION_DISPOSITION.json) and [Product Review handoff](../redesign/phase-10/PRODUCT_REVIEW_HANDOFF.md). Independent source review found the candidate requirements satisfied with applicable historical reuse. No additional executable check is established solely for the unserved stylesheet removal.
|
|
|
|
Recommended decision is CONDITIONAL GO for Phase 10 and the frozen pre-A3 development baseline, conditional Product Review readiness after milestone acceptance and target-baseline reconciliation, and production NO-GO. Retain 56 PARTIAL/C11 DEFERRED, all 34 routes and every inherited human/environment/security/release qualification. Final A3 Gate F is separate. CLEAN-20 implementation approval does not supply this final milestone decision. Continue eligible independent work while this decision is queued.
|
|
|
|
## 17 November build-warning authorisation and qualification update
|
|
|
|
Latest owner request explicitly asks to resolve the build/browser security warning with a verified compatible fix. It supersedes the queued question below for this bounded advisory/registry verification and same-minor non-production patch. Official lookup completed; Next16.4.6 build/export passed and source/evidence5f788635/a44a2f05 integrated into A3. Residual audit findings and final security/release gates remain open. No production deployment, formal paid scan, warning dismissal or broad dependency upgrade was authorised. Frozen Phase10 proposal/source remains unchanged and D02 is still pending; current A3 qualification does not retroactively alter that frozen candidate.
|
|
|
|
## Later decisions — not requested prematurely
|
|
|
|
16 November queued external-access question: permit a read-only official Next.js advisory/registry lookup to identify the exact advisory, supported safe target and application relevance? Independent offline review found no usable cached advisory details; standard Next16.4.1 build exits1 with SecurityFatalError. Recommendation: qualify the finding before a bounded dependency change. No upgrade, warning-dismissal retry or production action is authorised by the tool's message. Continue independent offline work before batching this question for the owner.
|
|
|
|
The owner's full-roadmap addendum authorises ordinary development wherever prerequisites are satisfied, including bounded EN/NB maintenance and approved A3 work. Product-ranked scope, Global Jobs entry and provider licences, additional-locale publication and human language release, homepage design selection, security target/environment and material-risk disposition, and final release approval retain their concrete review gates. Group remaining owner decisions when independent work is exhausted.
|
|
|
|
| Decision | Options and recommendation | Work held |
|
|
| --- | --- | --- |
|
|
| Homepage concept selection | Review the four published directions at `ccb11494`. Select or combine elements, then review the refined design. Keep product and pricing claims under their own review. | LAUNCH-02 refinement and later public implementation |
|
|
| MFA recovery and private support access | Review the separate technical proposals on the security branch. Prefer user-controlled recovery and explicit, scoped, revocable support consent. Retain present access while decisions are pending. | Factor reset/change workflow and cross-owner private support access |
|
|
| Global Jobs entry and rights | Review the accepted predecessor reports and provider rights before approving country/provider scope. Defer capabilities without documented access. | GJ-01 onward and provider activation |
|
|
| Isolated diagnostics and recovery rehearsal | Approve a specific disposable target, fixtures and operational acceptance criteria once the plan is ready. Retain production separation. | Real rollback, restore and diagnostic execution |
|
|
| Performance infrastructure | Keep the current topology while measurement is incomplete. Compare isolated replica, CDN and pool experiments only against a measured capacity or latency need. | Any external service, paid plan, DNS or production topology change |
|
|
| Final qualification | Review the source-bound A3, Phase 10, locale, security and release packages independently at their required gates. | Final milestone and production release decisions |
|