Files
jobtrackingapp/docs/direct-roadmap/LATEST_CHECKPOINT.md
T

85 lines
25 KiB
Markdown
Raw Blame History

This file contains ambiguous Unicode characters
This file contains Unicode characters that might be confused with other characters. If you think that this is intentional, you can safely ignore this warning. Use the Escape button to reveal them.
# Direct execution continuation
3 November 2026 — newest: owner attachment `a178edeb-c3ef-4c0e-b4c2-bcd1ca84b90b` explicitly ACCEPTS foundation Gate F (`bdd1de0d`, receipt `0d6de714`) and authorises navigation. Do not repeat foundation/final-A3 approval questions. Required later milestone gates remain distinct; ordinary independent work is authorised while awaiting them.
**A3 navigation IMPLEMENTED / TESTED / PUBLISHED; owner review pending.** Commit `992608c77f01d26220d086b2cdc55a3722b88ca5`, branch `codex/a3-ui-02`, independently remotely verified. Existing integration worktree `C:\Users\Connor\.codex\worktrees\direct-roadmap-integration\Job tracker` is now on that branch; original integration ref stays d3d33837 and UI-01 ref stays0d6de714. Reuses AppShell/router/MUI drawer, desktop collapse/storage, five mobile destinations and More, retained secondary tools/admin flags, measured content/scroll/toast clearance, source-bound EN/NB and theme behaviour. Discovery promoted to primary; existing workspace destinations retained. Fixed current-route drawer-close/focus defect and320px label wrapping. All57 groups/34 route declarations retained; no backend/data/renderer/dependency changes.
Fresh navigation evidence: **49 tests /9 suites PASSED**, typecheck/lint/build PASSED; **56 scoped axe sweeps with zero violations**,56 captures. Actual React browser lane:32 screen conditions at320/390/768/1440 EN/NB/light/dark,16 company dialogs,8 More drawers;16 configurations with4 primary route transitions, focus/collapse/More checks, local fixture company save and phone feedback clearance.16 PUTs were intercepted/fulfilled by browser fixtures; no real backend writes.40 existing Google font requests aborted. Core route content may show unavailable-service states: routing checks are not successful backend/domain qualification. Independent source review had no important/critical findings; final committed source/evidence manifest verified. See `docs/ui-modernisation/UI-02.md` and `NAVIGATION_VALIDATION.md` in that branch. Prototype counts are separate historical evidence.
**Navigation Gate F → A3-IM03 is OPEN.** A concise approval question was submitted in this chat after publication. Exact next scope: approved A1 dashboard hierarchy and optional resumable onboarding through existing DashboardView/grid/layout/checklist owners, retaining schema-2/CAS, hidden geometry/gaps, collision handling, drag/resize/keyboard alternatives and existing-data skip/resume. Do not start that dependent increment until owner review is received. Do not treat the foundation approval as blanket later-gate approval. Other independent roadmap work remains eligible under its own gates.
**Independent static I18N fix IMPLEMENTED / TESTED / PUBLISHED.** Commit `d4b938fafbf10541b62134293cea8299f25c4031`, `codex/i18n-build-metadata`, independently remotely verified. Existing i18n worktree `C:\Users\Connor\.codex\worktrees\i18n-00-audit\Job tracker` now uses that integration-derived branch from d3d33837; original codex/i18n-accessible-labels ref remains4172c23d. Reproduced Bokmål mobile menu showing literal `commit`; now uses existing localised version/revision key, retaining version-only fallback and caller-controlled admin metadata visibility. **24 tests /5 suites, typecheck, scoped zero-warning lint and fresh production build PASSED**. No new locale keys or historical dynamic-call review changes. Native report/source manifest verified. No fresh browser/live-service qualification for this separate branch. See `docs/i18n/MOBILE_BUILD_METADATA.md`. Do not add its overlapping existing suites to navigation's49 as a unique combined total.
The I18N patch is **not combined** with frozen navigation review992608c7. After navigation approval, reconcile the next UI baseline and port only its small AppShell hunk/test; never merge the older integration/theme tree wholesale. Run combined targeted metadata/navigation/language evidence after that integration. Full European localisation remains OPEN; all188 historical dynamic reviews remain accounted for, and navigation added four new static EN/NB keys only.
Design approval continuity is local-only at `3d6976be` on codex/product-modernisation; original A3 prototype237c79b8 and five concepts remain unchanged. No design-branch push. AST-only Graphify updates ran locally; generated graphs remain untracked. Prior orchestrator/pre-P10 worktrees are untouched. No main merge, deployment, destructive migration, provider access or model activation.
Wider roadmap stays OPEN: Phase10 final acceptance (no new deletion candidate), Product Review/full A3 implementation, GJ predecessor/provider permissions, European market/native localisation, homepage visual/claims approval, final integrated security and live recovery/hosted CI/release qualifications. Existing scoped evidence remains applicable only to its source-bound scope. No human/native-device/screen-reader/actual-zoom, physical PDF/container, provider/model, production or final security pass is inferred. The following entries are historical and superseded where they still describe foundation Gate F as pending.
3 November 2026 — latest: final A3 design/implementation authorisation RECEIVED in owner attachment137309c9-7463-4c4c-9b1c-6fb689d588d7. Gates C/D/E approved for that stated scope; do not ask for the same final A3 approval again. Verbatim text is committed in implementation branch `docs/ui-modernisation/A3_APPROVAL.md`. Design approval status updated locally at `b7051a3e` on restricted/local-only codex/product-modernisation; frozen prototype remains237c79b8, no new concept.
Actual A3 implementation checkpoint `bdd1de0dd3259e4e9e9f46c81948f865317c6054`, subsequent evidence/review receipt `0d6de71403015b0e44ca410d0ce2b844b75b893d`, branch `codex/a3-ui-01` in the existing `C:\Users\Connor\.codex\worktrees\direct-roadmap-integration\Job tracker` isolated worktree. Original codex/direct-roadmap-integration ref remains at d3d33837. Branch was created from that accepted integration, not by merging the older design tree. Existing theme.ts now implements D1 semantic palette/navigation colours, typography, quiet surfaces and shared controls. Actual sidebar structure, A1 dashboard and other feature layouts are NOT yet implemented. Theme/controls are A3-IM01, only part of owner UI-01.
Fresh implementation evidence:30 theme/state/dialog tests in5 suites plus5 disjoint CV-thumbnail/navigation tests in2 suites, all passed; baseline28 and reviewer16 overlap and are not added. Full typecheck, lint, static production build passed. Real built React with controlled API fixtures:32 screen conditions at320/390/768/1440, EN/NB and light/dark;16 company-dialog keyboard journeys;48 scoped axe sweeps, zero violations;32 screenshots. No page exceptions or backend writes. All32 inherited Google font requests were blocked, not fetched. Native JSON, screenshots and source/export-asset manifest committed. Independent code review found no important/critical findings. Final committed manifest verified. No backend/live-service/model/provider/native/human/physical-PDF/final security qualification claimed; actual browser zoom remains untested. Source/route/data/renderer contracts preserved; only shared theme application source changed.
Publication now works without repair: normal push and independent remote read-back confirmed implementation bdd1de0d. Subsequent documentation receipt0d6de714 pushed; latest read-back receipt recorded in this chat. Design branch remains unpublished by its specific restriction. Older connection-failure entries below remain historical actual results, not current publication status.
UI Gate F remains OPEN before A3-IM02 navigation: the approved handoff at237c79b8 explicitly says "Owner milestone review before next increment" for A3-IM01. Review the actual implementation evidence at docs/ui-modernisation/UI-01.md and VALIDATION.md in codex/a3-ui-01. After that review, proceed through approved navigation scope without repeating ordinary-change approvals. Do not infer Gate F approval from the earlier generic continue message sent before this validated checkpoint existed. Other independent work remains eligible under its original Phase10/provider/native/security/recovery gates. No orchestrator or pre-P10 changes, main merge or deployment.
All prior final-A3-approval-pending text below is historical and superseded by the explicit attachment authorisation above. All188 historical dynamic-call reviews remain accounted for; full European localisation, Phase10 acceptance, integrated security and release readiness remain open.
3 November 2026 — newest design checkpoint: `237c79b8cb3e280d7e4d1ef95cdbb2c77bb81c69` on local-only `codex/product-modernisation`, worktree `C:\Users\Connor\.codex\worktrees\product-modernisation\Job tracker`. Consolidated A3 http://127.0.0.1:4317/a3.html; handoff `docs/product-modernisation/08-a3-handoff/README.md` in that worktree. Owner explicitly confirmed A3: original A1 dashboard, D1 foundation, B1 tracking, editor left/preview right, application context right, desktop grouped sidebar/hybrid mobile, overview-first Career Profile, agenda-first calendar/month preference and automation under Settings. Do not restart five-concept exploration. Final production design/implementation approval remains OPEN (Gates C/D/E); no production UI replacement was authorised or implemented.
Publication result: local roadmap receipt `3eca2df0ad396544e4d2d1a60b4aed7164f127dc` committed successfully. Normal push to origin/feature/phase10-cleanup FAILED: `Failed to connect to git.cesnimda.uk:443 after 21119 ms: Could not connect to server`. Independent `git ls-remote --heads` also FAILED to connect after 21106 ms. No remote publication or verification is claimed for this receipt or the subsequent failure-record commit. Retry normal phase-branch publication/read-back when the existing remote becomes reachable; do not repair Gitea, change infrastructure or publish the restricted design branch.
Fresh isolated prototype evidence: 480 unique screen/layout/state conditions (320 populated + 160 generic states), 496 helper render/overflow calls including overlaps, 11 scoped behaviour checks, 44 screenshots and 50 scoped axe sweeps with zero returned violations. 57 inherited groups mapped (56 PARTIAL/1 DEFERRED retained), 34 inherited route strings confirmed in integration source. New direct profile edit/progress, local widget/calendar preferences, letter history/dirty navigation/optional fixed suggestion, account/session and processing-monitor interactions. Source/evidence manifest verified against committed Git bytes using LF-normalised text/raw PNG hashes. AST-only graph refresh completed locally (18,902 nodes/46,671 edges); generated graph remains untracked. Not real application E2E, full WCAG/native/device acceptance, provider/AI operation, Phase 10 or security/release acceptance. Advanced existing controls are explicitly retained components rather than fully simulated lab functionality.
Design commit is **not pushed or remotely verified**, under the design workshop's existing publication restriction. This primary continuation receipt may be published through the normal authorised Phase 10 development-branch workflow; it does not publish the design branch. Integration remains `d3d338376444b8abdcaf7200f682faa3daf1ad10` and earlier continuation `aa36075bef21385610c7522bf9fa8d7fc929fe89`; do not merge the older design branch application tree wholesale into integration. After explicit final approval, create implementation increments from the reconciled integration baseline and retain Gate F milestone reviews.
Next owner action: review the consolidated A3 handoff and explicitly approve or request changes to the final design system and proposed ten-milestone production implementation roadmap. Independent ordinary work remains eligible in the appropriate existing worktrees: localisation context/literals and European QA architecture, bounded source security remediation/review, remaining Phase 10 qualification, design-neutral launch preparation and offline release qualification. Do not represent this design review gate as blocking every unrelated package. Preserve provider/predecessor/native-language/homepage-visual/security-scan/staging/live-recovery/hosted-CI gates. No orchestrator access, pre-P10 modification, main merge or production deployment.
All older entries below are historical; use the latest counts and source-specific receipts above rather than reopening already reviewed 188 dynamic-call inventory entries.
Newest direct execution checkpoint: isolated combined application review branch `codex/direct-roadmap-integration` published and independently verified at `d3d338376444b8abdcaf7200f682faa3daf1ad10`, worktree `C:\Users\Connor\.codex\worktrees\direct-roadmap-integration\Job tracker`. It preserves approved CLEAN-20 and integrates exact validated I18N/backup paths, with no change to accepted automation handoff records, API sources or workflow configuration. See its docs/direct-roadmap/INTEGRATION_CHECKPOINT.md. Fresh combined checks: 195 selected frontend tests in 16 suites; full typecheck/lint/build; five mocked backup-function tests and Bash syntax, all passed. Additional catalogue QA: 10 tests in three suites; subsequent language-control QA: 17 tests in three suites, with overlap explicitly retained separately. Latest runtime language-control fix has its own fresh passing production build. Native JSON reports archived. No fresh browser, final integrated security, real provider/model, live restore or production qualification.
I18N finite key-domain census COMPLETE at published/read-back `4172c23d7ce13e8327a5e51bbb09f296c24fb9b8`: all 188 historical indices accounted for, 108 original + 80 supplemental, zero pending. Register schema 3 declares LF-normalised reviewed-text hashes for checkout portability, preserves original historical hashes, and distinguishes repeated same-line calls by immutable inventory index. This does not close every-string context, direct access/backend literals, European registry/native/plural/market or release gates. Tests enforce equal EN/Bokmål keys, placeholder sets and nonblank values across 3,119 keys per language; resources and translations were not invented or published for candidate locales. Only integration branch additionally contains the new catalogue tests, supported-language native-name/NB control fix and corrected JobFlowBar caller note. Prefer that branch for further ordinary integrated development.
Phase 10 separately published/read-back `db818e5ebd19eeedc05ae58dc3f7a908ce0e713d`: 14 new disjoint AttachmentConsistencyTests passed; selected backend coverage now 103, frontend Phase 10 coverage remains 92. P10-05 remains OPEN; do not claim complete regression/acceptance. Security source matrix follow-through published/read-back `88bcd6d91c6823ffc6bbc6a6de176ab7769e729f`: actual relational ownership denial evidence identified; HTTP/missing-owner/list/upload/MariaDB/final scan gaps retained. No Codex Security scan launched; desktop workflow references read, setup/capability/cost/scope and final integrated gates remain separate.
Homepage preparation published/read-back `af8c48ce7090f2c56bc8f9a47494b440312ec12a` on feature/launch-site-redesign: design-neutral content, locale and crawlable-HTML/SEO contracts; unchanged rendering-shell sources matched the available build, whose raw export lacked descriptive content/canonical/hreflang. No layout/route/metadata implementation or public marketing publication. Five application concepts and requested comparison ready in product-modernisation local-only commit `2f081e6f`: docs/product-modernisation/CONCEPT_COMPARISON.md and REVIEW_PACK.md, http://127.0.0.1:4317/gallery.html. No sixth concept and no final unapproved UI design implementation. Preserve design branch publishing restriction and all prior owner selections.
Next eligible work: use the integration branch for remaining literal/direct-access/localisation context work; continue bounded source audit without representing it as a plugin scan or final security gate; qualify full Phase 10/preservation evidence using unchanged source-bound results; complete detailed product journeys and review preparation without final design implementation. Remaining owner/environment gates: final design/implementation roadmap, locale market/native reviewer and Montenegrin identity, required predecessor acceptance/provider/data grants for GJ stages, approved public-site visuals/claims, scan policy/paid deep budget/named staging scope, isolated Linux recovery/hosted CI and production/human/device decisions. No orchestrator access, pre-P10 changes, main merge or deployment.
Current continuation after 2a4acc17: Phase 10 acceptance register published/read back at `6f29ed4cdb7b259318282f365d737f6cfdb6a682` (P10-05 remains OPEN). Fresh integrity check: 263 indexed artifact hashes and 1,279 retained source hashes match; only approved App.css absent. No extra deletion candidate.
I18N branch latest published/read-back `ebd33fcf0040ed7ebe659c75171873a88cdfc025`. Actual fixes: `2108ea50` session-change message uses existing EN/NB catalogue outside private providers; `7b132ec4` own-property guards for completeness/timeline unknown labels; `36db9322` inherited-name pipeline alias fallback. Selected runs separately: 17 session tests, 41 label/workflow tests, 29 pipeline/board tests, all passing. Typecheck and scoped lint passed for each implementation package. Static production build passed before the final one-line pipeline patch; do not claim a fresh final-pipeline build. Local AST graph update completed, 18,560 nodes / 46,020 edges; generated graphs untracked. Sanitized 17/41 native reports committed; pipeline native JSON remains ignored locally. DYNAMIC_RESOLUTION_REGISTER.json binds 18 individually matched supplemental call sites and reviewed source hashes to the original inventory: 126 resolved / 62 pending of 188, no duplicate counts. Final integrated security tests remain open until relevant application changes are complete.
Five rendered UI concepts are review-ready: product-modernisation local-only commit `c678ebdb`, docs/product-modernisation/REVIEW_PACK.md. Gallery http://127.0.0.1:4317/gallery.html; preferred expanded A3 http://127.0.0.1:4317/expanded.html. All 70 original screenshot files and ten gallery previews confirmed present; accepted 75-screenshot execution reused, not rerun. Earlier owner choices retained; no final unapproved design implementation. Design branch not pushed under its specific publishing restriction.
Global Jobs eligibility rechecked against planning branch docs/global-jobs/00/DEPENDENCIES_AND_GATES.md, PROVIDER_RIGHTS_MATRIX.md and OWNER_ACTIONS.md. Their old blanket no-implementation authority is superseded only by later direct-chat authorisation for independent ordinary work; required Phase 10/Product Review acceptance, stage/data/lifecycle/provider grants remain open. GJ-00 evidence is dated 28 October, not a fresh provider check. No credentials, registrations, scraping or provider calls occurred. European localisation registry/market/native-review choices, public homepage visual/claims approval, final design, hosted/live recovery/CI and security scan/staging gates remain separate; do not silently mark them complete.
Next eligible work: continue the 62 unresolved dynamic calls using the machine register to avoid repeats; review processing-monitor external-key maps for inherited-property behavior, then finite interview/prep/action maps; finish European catalogue context/legal evidence and eligible fixture checks; continue security owner-filter/source matrix review without final integrated scanning. Prepare fresh build/browser checks when relevant app scope stabilises, retaining all baseline/source boundaries. No immediate owner input is required for this offline work. No orchestrator access, pre-P10 edits, main merge or production deployment.
Newest continuation receipts: Phase 10 `ba826de1e5c959352e4442ab2fec5d02445dd32d` (89 backend + 92 frontend selected cases, separately counted); I18N `bab240914e30fb1e8e3756fbe568cbd60e39db32` (120/188 dynamic calls resolved; 68 pending); security offline preflight `0a17a33db7b9944693976df432f1e5a319277279`. All three refs were independently read back after normal publication. Security worktree: C:\Users\Connor\.codex\worktrees\security-offline-preflight\Job tracker, branch codex/security-offline-preflight. It contains partial Phase 00/01 inventory, ROE, eight-row source endpoint matrix and honest scan register. No scan or active staging attack executed; no policy file written. Continue there from docs/security/01-threat-model.md, completing owner-filter/sibling-path/source matrix review and actual plugin capability preflight. Read further subordinate prompts before entering later audit stages. Audit acceptance remains open.
Decisions parked for owner catch-up: exact proposed root security policy before any policy write; separately bounded deep-scan cost/runtime; named isolated staging hosts/accounts/rates before active attacks; final comprehensive product design and implementation roadmap; native-language/market and release/human/device gates. None is required for the next offline source review. Session-boundary English text remains an implementation item requiring privacy/unmount regression checks; preserve old-provider teardown. Orchestrator and pre-P10 worktree remain untouched.
Latest continuation: P10-04 selected regression has 89 backend cases and 92 frontend tests passing, zero failures/skips/pending. Native evidence is archived under docs/redesign/phase-10/p10-04-evidence; P10-04.md records exact filters, source boundaries and remaining qualification. Backend checkpoint `525b5fe4d74ab75f711651fe3a36b988b07abc4d` was independently remotely verified. I18N finite-map review was published/read back at `f577565f7146c6e0cba6edd00b4e804b032ad670`: 112 dynamic calls resolved / 76 pending. It verified 15 letter/completeness keys in both catalogues; checklist default review verified all 14 current defaults but retained the legacy unknown-key gap. No additional cleanup or production change.
Next: continue independent audit, remaining i18n owner maps/literals, and P10-05 evidence reconciliation. Keep final design/implementation approval, market/language decisions, provider/licensing access, live recovery, hosted CI and human/device gates open; ordinary local work need not wait for these unrelated gates. No user input is required for the next static review package.
Latest cross-workstream receipt (2 November 2026): I18N attachment preview fix published and independently read back at `4939585fb1272de69f4b1776f6a8f08af639762a`; supplemental checklist category review at `1559697eda967b8c767ac6595ba934877df89fcd` on `codex/i18n-accessible-labels`. Thirteen focused attachment/file-picker tests passed, typecheck passed, scoped lint passed. Graph update completed locally (18,548 nodes / 45,998 edges); generated graph remains untracked. See the I18N worktree's docs/i18n/ATTACHMENT_PREVIEW_LABEL.md and CHECKLIST_DYNAMIC_REVIEW.md. Dynamic review now 109 resolved / 79 pending, supplementing the historical inventory. Phase 10 latest published retain-review checkpoint is `927f909b0d65a24d617f0bac20d4c1fd7693f072`. These receipts supersede older pending statements below.
Next independently executable work: inspect checklist backend/default and legacy system-key coverage, continue the remaining dynamic/literal reviews, and progress P10-04/05 qualification. Four checklist template calls remain open pending compatibility analysis. Product design still awaits final comprehensive design approval before full production overhaul. No live provider/model/production qualification or complete security audit is claimed.
Latest: CLEAN-20 published and remotely verified at `78f7396adb2f1d3452c10e60bc0dbbd3a4a602e4`. P10-02/03 bounded retain reviews recorded; no further deletion nominated. P10-04/05 and independent audit remain open. Earlier pending-publication statements below describe the preceding checkpoint.
2 November 2026. Latest owner authorisation permits independent ordinary application work, preserves genuine gates, and explicitly approves CLEAN-20 only. Older statements requiring that approval are superseded.
- Phase 10: CLEAN-20 implemented and verified, see ../redesign/phase-10/P10-01.md. Publication pending exact receipt. P10-02–05 remain open; no extra cleanup approved.
- Release readiness: backup connection-parser fix published and read back at `f19e7ebf4aeae350b43fa84cf115c393030280f0` on codex/release-backup-parser, in release-readiness-discovery worktree. 31 offline tests passed; no live restore/deployment qualification.
- Product modernisation: isolated codex/product-modernisation worktree, latest local checkpoint `192095b8`; design prototypes and user choices retained under docs/product-modernisation. A1 dashboard + D1 foundation + B1 tracking, CV editor left/preview right, context right; overview-first Career Profile; agenda/month calendar including application deadlines; automation under Settings. No final full-application implementation approval. Prototype commits not remotely published.
- I18N: codex/i18n-accessible-labels branch created from `55adc1d`; implementation pending. Earlier translation audit counts remain historical; do not claim all dynamic calls fixed.
Next authorised work: publish validated CLEAN-20 normally and independently verify ref, then P10-02 retained-compatibility review and eligible independent fixes. Preserve primary/pre-P10 worktrees and all source-defined gates. No orchestrator commands, keys, configuration or queue changes; no main merge, models or production deployment. Full security/product/release acceptance remains incomplete.