# Direct execution continuation
|
||
|
||
3 November 2026 — newest: owner attachment `a178edeb-c3ef-4c0e-b4c2-bcd1ca84b90b` explicitly ACCEPTS foundation Gate F (`bdd1de0d`, receipt `0d6de714`) and authorises navigation. Do not repeat foundation/final-A3 approval questions. Required later milestone gates remain distinct; ordinary independent work is authorised while awaiting them.
|
||
|
||
**A3 navigation IMPLEMENTED / TESTED / PUBLISHED; owner review pending.** Commit `992608c77f01d26220d086b2cdc55a3722b88ca5`, branch `codex/a3-ui-02`, independently remotely verified. Existing integration worktree `C:\Users\Connor\.codex\worktrees\direct-roadmap-integration\Job tracker` is now on that branch; original integration ref stays d3d33837 and UI-01 ref stays0d6de714. Reuses AppShell/router/MUI drawer, desktop collapse/storage, five mobile destinations and More, retained secondary tools/admin flags, measured content/scroll/toast clearance, source-bound EN/NB and theme behaviour. Discovery promoted to primary; existing workspace destinations retained. Fixed current-route drawer-close/focus defect and320px label wrapping. All57 groups/34 route declarations retained; no backend/data/renderer/dependency changes.
|
||
|
||
Fresh navigation evidence: **49 tests /9 suites PASSED**, typecheck/lint/build PASSED; **56 scoped axe sweeps with zero violations**,56 captures. Actual React browser lane:32 screen conditions at320/390/768/1440 EN/NB/light/dark,16 company dialogs,8 More drawers;16 configurations with4 primary route transitions, focus/collapse/More checks, local fixture company save and phone feedback clearance.16 PUTs were intercepted/fulfilled by browser fixtures; no real backend writes.40 existing Google font requests aborted. Core route content may show unavailable-service states: routing checks are not successful backend/domain qualification. Independent source review had no important/critical findings; final committed source/evidence manifest verified. See `docs/ui-modernisation/UI-02.md` and `NAVIGATION_VALIDATION.md` in that branch. Prototype counts are separate historical evidence.
|
||
|
||
**Navigation Gate F → A3-IM03 is OPEN.** A concise approval question was submitted in this chat after publication. Exact next scope: approved A1 dashboard hierarchy and optional resumable onboarding through existing DashboardView/grid/layout/checklist owners, retaining schema-2/CAS, hidden geometry/gaps, collision handling, drag/resize/keyboard alternatives and existing-data skip/resume. Do not start that dependent increment until owner review is received. Do not treat the foundation approval as blanket later-gate approval. Other independent roadmap work remains eligible under its own gates.
|
||
|
||
**Independent static I18N fix IMPLEMENTED / TESTED / PUBLISHED.** Commit `d4b938fafbf10541b62134293cea8299f25c4031`, `codex/i18n-build-metadata`, independently remotely verified. Existing i18n worktree `C:\Users\Connor\.codex\worktrees\i18n-00-audit\Job tracker` now uses that integration-derived branch from d3d33837; original codex/i18n-accessible-labels ref remains4172c23d. Reproduced Bokmål mobile menu showing literal `commit`; now uses existing localised version/revision key, retaining version-only fallback and caller-controlled admin metadata visibility. **24 tests /5 suites, typecheck, scoped zero-warning lint and fresh production build PASSED**. No new locale keys or historical dynamic-call review changes. Native report/source manifest verified. No fresh browser/live-service qualification for this separate branch. See `docs/i18n/MOBILE_BUILD_METADATA.md`. Do not add its overlapping existing suites to navigation's49 as a unique combined total.
|
||
|
||
The I18N patch is **not combined** with frozen navigation review992608c7. After navigation approval, reconcile the next UI baseline and port only its small AppShell hunk/test; never merge the older integration/theme tree wholesale. Run combined targeted metadata/navigation/language evidence after that integration. Full European localisation remains OPEN; all188 historical dynamic reviews remain accounted for, and navigation added four new static EN/NB keys only.
|
||
|
||
Design approval continuity is local-only at `3d6976be` on codex/product-modernisation; original A3 prototype237c79b8 and five concepts remain unchanged. No design-branch push. AST-only Graphify updates ran locally; generated graphs remain untracked. Prior orchestrator/pre-P10 worktrees are untouched. No main merge, deployment, destructive migration, provider access or model activation.
|
||
|
||
Wider roadmap stays OPEN: Phase10 final acceptance (no new deletion candidate), Product Review/full A3 implementation, GJ predecessor/provider permissions, European market/native localisation, homepage visual/claims approval, final integrated security and live recovery/hosted CI/release qualifications. Existing scoped evidence remains applicable only to its source-bound scope. No human/native-device/screen-reader/actual-zoom, physical PDF/container, provider/model, production or final security pass is inferred. The following entries are historical and superseded where they still describe foundation Gate F as pending.
|
||
|
||
3 November 2026 — latest: final A3 design/implementation authorisation RECEIVED in owner attachment137309c9-7463-4c4c-9b1c-6fb689d588d7. Gates C/D/E approved for that stated scope; do not ask for the same final A3 approval again. Verbatim text is committed in implementation branch `docs/ui-modernisation/A3_APPROVAL.md`. Design approval status updated locally at `b7051a3e` on restricted/local-only codex/product-modernisation; frozen prototype remains237c79b8, no new concept.
|
||
|
||
Actual A3 implementation checkpoint `bdd1de0dd3259e4e9e9f46c81948f865317c6054`, subsequent evidence/review receipt `0d6de71403015b0e44ca410d0ce2b844b75b893d`, branch `codex/a3-ui-01` in the existing `C:\Users\Connor\.codex\worktrees\direct-roadmap-integration\Job tracker` isolated worktree. Original codex/direct-roadmap-integration ref remains at d3d33837. Branch was created from that accepted integration, not by merging the older design tree. Existing theme.ts now implements D1 semantic palette/navigation colours, typography, quiet surfaces and shared controls. Actual sidebar structure, A1 dashboard and other feature layouts are NOT yet implemented. Theme/controls are A3-IM01, only part of owner UI-01.
|
||
|
||
Fresh implementation evidence:30 theme/state/dialog tests in5 suites plus5 disjoint CV-thumbnail/navigation tests in2 suites, all passed; baseline28 and reviewer16 overlap and are not added. Full typecheck, lint, static production build passed. Real built React with controlled API fixtures:32 screen conditions at320/390/768/1440, EN/NB and light/dark;16 company-dialog keyboard journeys;48 scoped axe sweeps, zero violations;32 screenshots. No page exceptions or backend writes. All32 inherited Google font requests were blocked, not fetched. Native JSON, screenshots and source/export-asset manifest committed. Independent code review found no important/critical findings. Final committed manifest verified. No backend/live-service/model/provider/native/human/physical-PDF/final security qualification claimed; actual browser zoom remains untested. Source/route/data/renderer contracts preserved; only shared theme application source changed.
|
||
|
||
Publication now works without repair: normal push and independent remote read-back confirmed implementation bdd1de0d. Subsequent documentation receipt0d6de714 pushed; latest read-back receipt recorded in this chat. Design branch remains unpublished by its specific restriction. Older connection-failure entries below remain historical actual results, not current publication status.
|
||
|
||
UI Gate F remains OPEN before A3-IM02 navigation: the approved handoff at237c79b8 explicitly says "Owner milestone review before next increment" for A3-IM01. Review the actual implementation evidence at docs/ui-modernisation/UI-01.md and VALIDATION.md in codex/a3-ui-01. After that review, proceed through approved navigation scope without repeating ordinary-change approvals. Do not infer Gate F approval from the earlier generic continue message sent before this validated checkpoint existed. Other independent work remains eligible under its original Phase10/provider/native/security/recovery gates. No orchestrator or pre-P10 changes, main merge or deployment.
|
||
|
||
All prior final-A3-approval-pending text below is historical and superseded by the explicit attachment authorisation above. All188 historical dynamic-call reviews remain accounted for; full European localisation, Phase10 acceptance, integrated security and release readiness remain open.
|
||
|
||
3 November 2026 — newest design checkpoint: `237c79b8cb3e280d7e4d1ef95cdbb2c77bb81c69` on local-only `codex/product-modernisation`, worktree `C:\Users\Connor\.codex\worktrees\product-modernisation\Job tracker`. Consolidated A3 http://127.0.0.1:4317/a3.html; handoff `docs/product-modernisation/08-a3-handoff/README.md` in that worktree. Owner explicitly confirmed A3: original A1 dashboard, D1 foundation, B1 tracking, editor left/preview right, application context right, desktop grouped sidebar/hybrid mobile, overview-first Career Profile, agenda-first calendar/month preference and automation under Settings. Do not restart five-concept exploration. Final production design/implementation approval remains OPEN (Gates C/D/E); no production UI replacement was authorised or implemented.
|
||
|
||
Publication result: local roadmap receipt `3eca2df0ad396544e4d2d1a60b4aed7164f127dc` committed successfully. Normal push to origin/feature/phase10-cleanup FAILED: `Failed to connect to git.cesnimda.uk:443 after 21119 ms: Could not connect to server`. Independent `git ls-remote --heads` also FAILED to connect after 21106 ms. No remote publication or verification is claimed for this receipt or the subsequent failure-record commit. Retry normal phase-branch publication/read-back when the existing remote becomes reachable; do not repair Gitea, change infrastructure or publish the restricted design branch.
|
||
|
||
Fresh isolated prototype evidence: 480 unique screen/layout/state conditions (320 populated + 160 generic states), 496 helper render/overflow calls including overlaps, 11 scoped behaviour checks, 44 screenshots and 50 scoped axe sweeps with zero returned violations. 57 inherited groups mapped (56 PARTIAL/1 DEFERRED retained), 34 inherited route strings confirmed in integration source. New direct profile edit/progress, local widget/calendar preferences, letter history/dirty navigation/optional fixed suggestion, account/session and processing-monitor interactions. Source/evidence manifest verified against committed Git bytes using LF-normalised text/raw PNG hashes. AST-only graph refresh completed locally (18,902 nodes/46,671 edges); generated graph remains untracked. Not real application E2E, full WCAG/native/device acceptance, provider/AI operation, Phase 10 or security/release acceptance. Advanced existing controls are explicitly retained components rather than fully simulated lab functionality.
|
||
|
||
Design commit is **not pushed or remotely verified**, under the design workshop's existing publication restriction. This primary continuation receipt may be published through the normal authorised Phase 10 development-branch workflow; it does not publish the design branch. Integration remains `d3d338376444b8abdcaf7200f682faa3daf1ad10` and earlier continuation `aa36075bef21385610c7522bf9fa8d7fc929fe89`; do not merge the older design branch application tree wholesale into integration. After explicit final approval, create implementation increments from the reconciled integration baseline and retain Gate F milestone reviews.
|
||
|
||
Next owner action: review the consolidated A3 handoff and explicitly approve or request changes to the final design system and proposed ten-milestone production implementation roadmap. Independent ordinary work remains eligible in the appropriate existing worktrees: localisation context/literals and European QA architecture, bounded source security remediation/review, remaining Phase 10 qualification, design-neutral launch preparation and offline release qualification. Do not represent this design review gate as blocking every unrelated package. Preserve provider/predecessor/native-language/homepage-visual/security-scan/staging/live-recovery/hosted-CI gates. No orchestrator access, pre-P10 modification, main merge or production deployment.
|
||
|
||
All older entries below are historical; use the latest counts and source-specific receipts above rather than reopening already reviewed 188 dynamic-call inventory entries.
|
||
|
||
Newest direct execution checkpoint: isolated combined application review branch `codex/direct-roadmap-integration` published and independently verified at `d3d338376444b8abdcaf7200f682faa3daf1ad10`, worktree `C:\Users\Connor\.codex\worktrees\direct-roadmap-integration\Job tracker`. It preserves approved CLEAN-20 and integrates exact validated I18N/backup paths, with no change to accepted automation handoff records, API sources or workflow configuration. See its docs/direct-roadmap/INTEGRATION_CHECKPOINT.md. Fresh combined checks: 195 selected frontend tests in 16 suites; full typecheck/lint/build; five mocked backup-function tests and Bash syntax, all passed. Additional catalogue QA: 10 tests in three suites; subsequent language-control QA: 17 tests in three suites, with overlap explicitly retained separately. Latest runtime language-control fix has its own fresh passing production build. Native JSON reports archived. No fresh browser, final integrated security, real provider/model, live restore or production qualification.
|
||
|
||
I18N finite key-domain census COMPLETE at published/read-back `4172c23d7ce13e8327a5e51bbb09f296c24fb9b8`: all 188 historical indices accounted for, 108 original + 80 supplemental, zero pending. Register schema 3 declares LF-normalised reviewed-text hashes for checkout portability, preserves original historical hashes, and distinguishes repeated same-line calls by immutable inventory index. This does not close every-string context, direct access/backend literals, European registry/native/plural/market or release gates. Tests enforce equal EN/Bokmål keys, placeholder sets and nonblank values across 3,119 keys per language; resources and translations were not invented or published for candidate locales. Only integration branch additionally contains the new catalogue tests, supported-language native-name/NB control fix and corrected JobFlowBar caller note. Prefer that branch for further ordinary integrated development.
|
||
|
||
Phase 10 separately published/read-back `db818e5ebd19eeedc05ae58dc3f7a908ce0e713d`: 14 new disjoint AttachmentConsistencyTests passed; selected backend coverage now 103, frontend Phase 10 coverage remains 92. P10-05 remains OPEN; do not claim complete regression/acceptance. Security source matrix follow-through published/read-back `88bcd6d91c6823ffc6bbc6a6de176ab7769e729f`: actual relational ownership denial evidence identified; HTTP/missing-owner/list/upload/MariaDB/final scan gaps retained. No Codex Security scan launched; desktop workflow references read, setup/capability/cost/scope and final integrated gates remain separate.
|
||
|
||
Homepage preparation published/read-back `af8c48ce7090f2c56bc8f9a47494b440312ec12a` on feature/launch-site-redesign: design-neutral content, locale and crawlable-HTML/SEO contracts; unchanged rendering-shell sources matched the available build, whose raw export lacked descriptive content/canonical/hreflang. No layout/route/metadata implementation or public marketing publication. Five application concepts and requested comparison ready in product-modernisation local-only commit `2f081e6f`: docs/product-modernisation/CONCEPT_COMPARISON.md and REVIEW_PACK.md, http://127.0.0.1:4317/gallery.html. No sixth concept and no final unapproved UI design implementation. Preserve design branch publishing restriction and all prior owner selections.
|
||
|
||
Next eligible work: use the integration branch for remaining literal/direct-access/localisation context work; continue bounded source audit without representing it as a plugin scan or final security gate; qualify full Phase 10/preservation evidence using unchanged source-bound results; complete detailed product journeys and review preparation without final design implementation. Remaining owner/environment gates: final design/implementation roadmap, locale market/native reviewer and Montenegrin identity, required predecessor acceptance/provider/data grants for GJ stages, approved public-site visuals/claims, scan policy/paid deep budget/named staging scope, isolated Linux recovery/hosted CI and production/human/device decisions. No orchestrator access, pre-P10 changes, main merge or deployment.
|
||
|
||
Current continuation after 2a4acc17: Phase 10 acceptance register published/read back at `6f29ed4cdb7b259318282f365d737f6cfdb6a682` (P10-05 remains OPEN). Fresh integrity check: 263 indexed artifact hashes and 1,279 retained source hashes match; only approved App.css absent. No extra deletion candidate.
|
||
|
||
I18N branch latest published/read-back `ebd33fcf0040ed7ebe659c75171873a88cdfc025`. Actual fixes: `2108ea50` session-change message uses existing EN/NB catalogue outside private providers; `7b132ec4` own-property guards for completeness/timeline unknown labels; `36db9322` inherited-name pipeline alias fallback. Selected runs separately: 17 session tests, 41 label/workflow tests, 29 pipeline/board tests, all passing. Typecheck and scoped lint passed for each implementation package. Static production build passed before the final one-line pipeline patch; do not claim a fresh final-pipeline build. Local AST graph update completed, 18,560 nodes / 46,020 edges; generated graphs untracked. Sanitized 17/41 native reports committed; pipeline native JSON remains ignored locally. DYNAMIC_RESOLUTION_REGISTER.json binds 18 individually matched supplemental call sites and reviewed source hashes to the original inventory: 126 resolved / 62 pending of 188, no duplicate counts. Final integrated security tests remain open until relevant application changes are complete.
|
||
|
||
Five rendered UI concepts are review-ready: product-modernisation local-only commit `c678ebdb`, docs/product-modernisation/REVIEW_PACK.md. Gallery http://127.0.0.1:4317/gallery.html; preferred expanded A3 http://127.0.0.1:4317/expanded.html. All 70 original screenshot files and ten gallery previews confirmed present; accepted 75-screenshot execution reused, not rerun. Earlier owner choices retained; no final unapproved design implementation. Design branch not pushed under its specific publishing restriction.
|
||
|
||
Global Jobs eligibility rechecked against planning branch docs/global-jobs/00/DEPENDENCIES_AND_GATES.md, PROVIDER_RIGHTS_MATRIX.md and OWNER_ACTIONS.md. Their old blanket no-implementation authority is superseded only by later direct-chat authorisation for independent ordinary work; required Phase 10/Product Review acceptance, stage/data/lifecycle/provider grants remain open. GJ-00 evidence is dated 28 October, not a fresh provider check. No credentials, registrations, scraping or provider calls occurred. European localisation registry/market/native-review choices, public homepage visual/claims approval, final design, hosted/live recovery/CI and security scan/staging gates remain separate; do not silently mark them complete.
|
||
|
||
Next eligible work: continue the 62 unresolved dynamic calls using the machine register to avoid repeats; review processing-monitor external-key maps for inherited-property behavior, then finite interview/prep/action maps; finish European catalogue context/legal evidence and eligible fixture checks; continue security owner-filter/source matrix review without final integrated scanning. Prepare fresh build/browser checks when relevant app scope stabilises, retaining all baseline/source boundaries. No immediate owner input is required for this offline work. No orchestrator access, pre-P10 edits, main merge or production deployment.
|
||
|
||
Newest continuation receipts: Phase 10 `ba826de1e5c959352e4442ab2fec5d02445dd32d` (89 backend + 92 frontend selected cases, separately counted); I18N `bab240914e30fb1e8e3756fbe568cbd60e39db32` (120/188 dynamic calls resolved; 68 pending); security offline preflight `0a17a33db7b9944693976df432f1e5a319277279`. All three refs were independently read back after normal publication. Security worktree: C:\Users\Connor\.codex\worktrees\security-offline-preflight\Job tracker, branch codex/security-offline-preflight. It contains partial Phase 00/01 inventory, ROE, eight-row source endpoint matrix and honest scan register. No scan or active staging attack executed; no policy file written. Continue there from docs/security/01-threat-model.md, completing owner-filter/sibling-path/source matrix review and actual plugin capability preflight. Read further subordinate prompts before entering later audit stages. Audit acceptance remains open.
|
||
|
||
Decisions parked for owner catch-up: exact proposed root security policy before any policy write; separately bounded deep-scan cost/runtime; named isolated staging hosts/accounts/rates before active attacks; final comprehensive product design and implementation roadmap; native-language/market and release/human/device gates. None is required for the next offline source review. Session-boundary English text remains an implementation item requiring privacy/unmount regression checks; preserve old-provider teardown. Orchestrator and pre-P10 worktree remain untouched.
|
||
|
||
Latest continuation: P10-04 selected regression has 89 backend cases and 92 frontend tests passing, zero failures/skips/pending. Native evidence is archived under docs/redesign/phase-10/p10-04-evidence; P10-04.md records exact filters, source boundaries and remaining qualification. Backend checkpoint `525b5fe4d74ab75f711651fe3a36b988b07abc4d` was independently remotely verified. I18N finite-map review was published/read back at `f577565f7146c6e0cba6edd00b4e804b032ad670`: 112 dynamic calls resolved / 76 pending. It verified 15 letter/completeness keys in both catalogues; checklist default review verified all 14 current defaults but retained the legacy unknown-key gap. No additional cleanup or production change.
|
||
|
||
Next: continue independent audit, remaining i18n owner maps/literals, and P10-05 evidence reconciliation. Keep final design/implementation approval, market/language decisions, provider/licensing access, live recovery, hosted CI and human/device gates open; ordinary local work need not wait for these unrelated gates. No user input is required for the next static review package.
|
||
|
||
Latest cross-workstream receipt (2 November 2026): I18N attachment preview fix published and independently read back at `4939585fb1272de69f4b1776f6a8f08af639762a`; supplemental checklist category review at `1559697eda967b8c767ac6595ba934877df89fcd` on `codex/i18n-accessible-labels`. Thirteen focused attachment/file-picker tests passed, typecheck passed, scoped lint passed. Graph update completed locally (18,548 nodes / 45,998 edges); generated graph remains untracked. See the I18N worktree's docs/i18n/ATTACHMENT_PREVIEW_LABEL.md and CHECKLIST_DYNAMIC_REVIEW.md. Dynamic review now 109 resolved / 79 pending, supplementing the historical inventory. Phase 10 latest published retain-review checkpoint is `927f909b0d65a24d617f0bac20d4c1fd7693f072`. These receipts supersede older pending statements below.
|
||
|
||
Next independently executable work: inspect checklist backend/default and legacy system-key coverage, continue the remaining dynamic/literal reviews, and progress P10-04/05 qualification. Four checklist template calls remain open pending compatibility analysis. Product design still awaits final comprehensive design approval before full production overhaul. No live provider/model/production qualification or complete security audit is claimed.
|
||
|
||
Latest: CLEAN-20 published and remotely verified at `78f7396adb2f1d3452c10e60bc0dbbd3a4a602e4`. P10-02/03 bounded retain reviews recorded; no further deletion nominated. P10-04/05 and independent audit remain open. Earlier pending-publication statements below describe the preceding checkpoint.
|
||
|
||
2 November 2026. Latest owner authorisation permits independent ordinary application work, preserves genuine gates, and explicitly approves CLEAN-20 only. Older statements requiring that approval are superseded.
|
||
|
||
- Phase 10: CLEAN-20 implemented and verified, see ../redesign/phase-10/P10-01.md. Publication pending exact receipt. P10-02–05 remain open; no extra cleanup approved.
|
||
- Release readiness: backup connection-parser fix published and read back at `f19e7ebf4aeae350b43fa84cf115c393030280f0` on codex/release-backup-parser, in release-readiness-discovery worktree. 31 offline tests passed; no live restore/deployment qualification.
|
||
- Product modernisation: isolated codex/product-modernisation worktree, latest local checkpoint `192095b8`; design prototypes and user choices retained under docs/product-modernisation. A1 dashboard + D1 foundation + B1 tracking, CV editor left/preview right, context right; overview-first Career Profile; agenda/month calendar including application deadlines; automation under Settings. No final full-application implementation approval. Prototype commits not remotely published.
|
||
- I18N: codex/i18n-accessible-labels branch created from `55adc1d`; implementation pending. Earlier translation audit counts remain historical; do not claim all dynamic calls fixed.
|
||
|
||
Next authorised work: publish validated CLEAN-20 normally and independently verify ref, then P10-02 retained-compatibility review and eligible independent fixes. Preserve primary/pre-P10 worktrees and all source-defined gates. No orchestrator commands, keys, configuration or queue changes; no main merge, models or production deployment. Full security/product/release acceptance remains incomplete.
|