Direct roadmap status

Updated 10 November 2026. This register records direct-chat work. See the continuation checkpoint for exact integration refs and evidence.

Workstream/checkpoint Status Dependency and evidence
PHASE-10 / P10-00 assessment COMPLETED Report in ../redesign/phase-10/P10-00.md; assessment 7ba1367, publication receipts 8cdff28/1692142. Remote exactly 1692142295950e390a4cf807d9df86cc5cf96290 on 2 November
P10-01 / CLEAN-20 VALIDATED AND PUBLISHED Owner approved only the unused App.css removal. Source and receipt at 78f7396a. See P10-01
P10-02 CV/documents REVIEWED, RETAIN Historical document and import compatibility kept. See P10-02
P10-03 backend/dependencies/config REVIEWED, RETAIN No additional proven-safe removal. See P10-03
P10-04 functional/data verification PARTIAL 103 distinct historical backend cases and 92 frontend tests reconciled. Environment and recovery limits in P10-04
P10-05 full acceptance OPEN Full local backend passed 1,448 tests. Full frontend passed 1,031 tests across 112 suites. Independent audit and preservation closure remain open. See P10-05
PRODUCT-REVIEW-01 FINAL REVIEW BLOCKED Final audit requires accepted Phase 10. Approved A3 work advances separately under the owner's direct authorisation
A3 UI/UX modernisation IM10 IN PROGRESS Owner approved IM09 and IM10. Visual comparison, outstanding route states, combined qualification and final Gate F remain open
INT-GLOBAL-JOBS-01 / GJ-00 CONDITIONAL Existing planning at 0ec9f98e6ed4a646fc5e017d8eb6fade07653f37; exact remote reverified 2 November. No implementation authorised
INT-GLOBAL-JOBS-01 implementation BLOCKED Accepted Phase 10/Product Review, initiative approval and provider rights
I18N-01 / I18N-00 audit PARTIAL All 188 historical dynamic call reviews accounted for in published 4172c23d. Full visible-text, native, market and European coverage remain open
I18N-01–08 implementation/acceptance PARTIAL Bounded EN/NB improvements tested and published. Later stage prerequisites, native review and additional locale publication remain separate
LAUNCH-SITE-01 / LAUNCH-00 audit PARTIAL Design-neutral contracts at af8c48ce and rendered baseline reconciliation at 98483b80. Design research, asset rights and public claims remain open
LAUNCH-01 four desktop/mobile concepts PUBLISHED FOR REVIEW Gallery and eight rendered screenshots at ccb11494. 20 controlled browser checks passed
LAUNCH-SITE final design/implementation AWAITING_APPROVAL Owner selection or combination is next. Refine and obtain final design approval before application implementation
SECURITY-AUDIT-01 OFFLINE PREFLIGHT PARTIAL Approved root policy published at de3d5031. Formal integrated scan requires a completed application baseline and applicable environment/cost approval
RELEASE-READINESS-01 / discovery and RR-11–13 PARTIAL Parser fix and offline rollback, off-host copy failure and monthly completion guards published through 24a62997. Isolated rollback, restore and off-host encryption evidence remain open
Release stages 2–7 baseline, qualification, remediation, requalification, rehearsal, final acceptance BLOCKED Final release candidate/prerequisites not accepted; each stage needs actual applicable environment and source-bound evidence
PERF-01 / 18 performance areas IN PROGRESS Initial source classifications and isolated export/browser baseline recorded. A3 page query and cache changes published. Isolated Jobs request and route splitting have measured results and await integration. MariaDB and runtime timing remain open

Implemented, tested, accepted, published and production-ready are separate. Production is NO-GO. Historical counts are not fresh executions. See blockers, owner decisions, completed work and next actions.