Files
jobtrackingapp/docs/roadmap/todo.md
T

69 lines
19 KiB
Markdown
Raw Blame History

This file contains ambiguous Unicode characters
This file contains Unicode characters that might be confused with other characters. If you think that this is intentional, you can safely ignore this warning. Use the Escape button to reveal them.
# TODO
Status reconciled: 2026-10-09.
## Current repository work
- **P5-15-01R-02 — bounded Rules draft repair in progress:** [record](../redesign/phase-5/p5-15/p5-15-01/rules-draft-repair/README.md). Native RED reproduces unsaved14→5→tab round trip→14, persisted14/zero writes. Preserve the Settings-session draft, explicit save/discard/error semantics and account boundary; full regression and acceptance evidence pending. Analytics repair/P5-15-02/P5-13/B07/production remain outside this checkpoint.
- **P5-15-00 — acceptance planning only:** [final acceptance programme](../redesign/phase-5/p5-15/README.md) reconciles every Phase 5 slice, all 57 original PRES groups and retained routes, incomplete axe/manual/device qualifications, CV/native/revision boundaries and A/B/C/D debt/release gates. No new application/test change or fresh suite result; inherited 1,023 backend / 459 frontend / 117 browser remains. P5-13 deferred, full Phase 5 incomplete and production NO-GO. Push this documentation checkpoint and stop for review; each subsequently completed logical P5-15 checkpoint must be separately committed/pushed. No production `main` push, B07 or automatic 01 execution.
- **P5-14 — scoped responsive CV checkpoint, CONDITIONAL GO:** [implementation/acceptance record](../redesign/phase-5/p5-14/README.md) covers implemented P5-09–12, measured shell clearance, bounded preview chrome/canvas, pane-owned Ctrl+Home/End, nested drag/drop protection, save/conflict recovery and 320–1440px/landscape evidence. Final baseline: **1,023 backend / 459 frontend / 117 actual browser passes**, sidecar 49, real HTTP 2, security/configuration 9/6/1/3; revision 5/5, original fidelity 16/16 with 36 aligned pages and settings exports 8/8 with 24 aligned pages. Production remains NO-GO and no `main` deployment occurred. P5-13 stays deferred/unqualified; incomplete/human/device/zoom/font/production gates remain open. Stop before P5-15/B07; acceptance planning is the next recommendation only.
- **P5-13 — DEFERRED / BLOCKED / NOT QUALIFIED:** [outstanding-work register](../redesign/phase-5/OPEN_BLOCKERS.md#p5-13-deferred-debt-and-return-conditions--2026-10-08) retains 32 frozen cases, 366 required/0 completed model calls, 0 human reviews, unmeasured factuality, unavailable environment/unverified deployed identity and unimplemented AI review UI. Deterministic protections and Production withholding remain; no unrelated Docker recovery retries. The separate [fresh production assessment](../redesign/phase-5/production-release-decision/README.md) identifies automatic deployment from `main` and records **PRODUCTION NO-GO** pending actual ingress/current backup-restore/configuration/rollback evidence. Connor authorizes scoped P5-14 independently of release success; missing AI-review acceptance remains explicit. P5-15 must carry the debt and commit/push every individual change/checkpoint when authorized.
- **P5-11 — live preview presentation complete:** [implementation record](../redesign/phase-5/p5-11/README.md) retains the native renderer, physical geometry, settings/history/source owners and pane modes. Fit/count/return chrome, readable busy/error/retry, semantic canvas/white paper and stable label slots have native keyboard/scroll evidence. Baseline: **941 backend / 434 frontend (+4) / 108 actual browser passes (+2)**, security 9/6/1, configuration 3; revision 5/5, fidelity 16/16 and 36 aligned pages. Forty-four final captures/211 axe scans retain incomplete/manual/sticky-boundary qualifications. The first complete smoke-selector failure and exact-mode regression correction are documented. Stop before P5-12+ or B07; F04, human screen-reader, production font/photo, pointer/reflow and separate debt remain open.
- **P5-10 — CV section editing/source clarity complete:** [implementation record](../redesign/phase-5/p5-10/README.md) retains P5-09's frame and existing canonical/settings/history/rendering owners. Scope-labelled fields, independent reset, editable omitted entries and compact custom-entry actions have native persistence/focus evidence. Baseline: **941 backend / 430 frontend (+4) / 106 actual browser passes (+4)**, security 9/6/1, configuration 3; revision 5/5 and fidelity 16/16, 36 aligned pages. EN/Bokmål, light/dark, desktop/intermediate/320px evidence retained; 205 axe scans report zero violations but retain incomplete findings. Stop before P5-11+ or B07. F04 and human screen-reader/font/photo/pointer qualifications stay open.
- **P5-10-O01 — scoped closure in P5-14:** [ownership/default-drop evidence](../redesign/phase-5/p5-14/README.md#reproduced-failures-and-bounded-corrections) protects entry versus section gestures, cancels unsupported foreign editable drops and retains valid native order/persistence plus named alternatives. Original [observation](../redesign/phase-5/p5-10/README.md#separately-scoped-drag-caveat) remains historical. No cross-section transfer feature or physical-touch/all-browser certification is implied.
- **P5-09 — CV editor frame/navigation complete:** [implementation record](../redesign/phase-5/p5-09/README.md). Content-first studio, compact document identity/scope/actions, ordered section navigation and explicit keyboard preview entry reuse the existing forms/save/history/render owners. Baseline: **941 backend / 426 frontend (+4) / 102 actual browser passes (+4)**, security 9/6/1, configuration 3; revision 5/5 and fidelity 16/16 with 36 aligned pages. EN/Bokmål, light/dark and desktop/intermediate/phone evidence retained; incomplete checks and pointer/reflow qualification are explicit. Stop before P5-10+ and B07. F04, production font/photo and human screen-reader acceptance stay open.
- **CV pagination-fidelity repair complete — GO for P5-09:** [native pagination evidence](../redesign/phase-5/p5-09-pagination-readiness/README.md) resolves all six original failures, **16/16** at unchanged tolerances, 36 preview/native PDF pages. PDF and accepted [revision protection](../redesign/phase-5/p5-09-readiness/README.md) remain unchanged. Baseline: **941 backend / 422 frontend / 98 actual browser passes (+2)**, security 9/6/1, configuration 3. Broader photo/wrapped-line/deployment-font qualification and native print-quality/control debt remain recorded. Stop before P5-09+ or B07; F04 and human screen-reader acceptance stay open. P2-D01 is ordinary passing.
- **P5-08b — Job sections complete:** [section architecture/preservation record](../redesign/phase-5/p5-08b/README.md) owns seven URL-backed sections, Application and Timeline subsections, current versus frozen documents, readable Timeline/Notes/tasks/correspondence/interview presentation and local read-error handling. Existing native packages, legacy/numeric links, query/history, Jobs Back focus and all domain owners remain. Final baseline: **936 backend / 418 frontend (+6) / 93 actual browser passes (+5)**, zero expected failures; security 9/6/1, configuration 3. Eight scoped mounted-page scans have no violations but retain incomplete findings; human screen-reader acceptance is not passed. Stop before P5-09: revision/rendering gates remain; F04 stays open. Historical checkpoint counts below are not current expected failures.
- **P5-08b readiness complete — GO:** [native package/navigation/accessibility record](../redesign/phase-5/p5-08b-readiness/README.md) owns the provider-compatible capture repair, frozen source/file/account-ZIP proof, existing disclosure destinations, retained query/history and scoped ARIA/keyboard fixes. Backend 936 (+2), frontend 412 (+4), browser 88 actual (+4 new and P2-D01 converted to a real pass), zero expected failures; security 9/6/1 and configuration 3. Connor approved preserving follow-up metadata and deferring absent mode-specific UI to the mail phase. No deeper redesign, CV or B07 work. F04 and manual screen-reader acceptance remain open. Older checkpoint counts below are historical.
- **P5-08a — Job header and Overview complete:** shared role/company/status/actions header, recorded date summary, native preparation entries and keyboard-scrollable progress; five section keys/six deeper disclosures and all route/domain owners retained. [Record](../redesign/phase-5/p5-08a/README.md). Baseline: 934 backend, 408 frontend (+5), 83 actual browser passes (+2) plus unchanged P2-D01 expected failure; security 9/6/1, configuration 3. P4-02-D03 closes locally. P5-08b is **NO-GO pending native package proof and its own adapter/draft/AI/deeper-accessibility gates**; no B07 or deeper migration. F04 and manual screen-reader acceptance remain open.
- **P5-07 — existing-report Analytics destination complete:** meaningful authenticated `/analytics`/Insights entry, shared retained Dashboard report owner, current-versus-window definitions, exact values and existing status/company drill-downs. [Record](../redesign/phase-5/p5-07/README.md). Baseline: 934 backend, 403 frontend (+5), 81 actual browser passes (+2) plus unchanged P2-D01 expected failure. Dashboard's five owner-local flags and all original routes remain; no new metrics/backend contracts. P5-08a is recorded separately above; F04, P2-D01, incomplete axe/manual screen-reader, P5-06-O01 and the P5-07-O01 observation remain open.
- **P5-06 — personal Dashboard presentation complete:** existing reports, actions and five owner-local visibility flags retained; precise population/period/sample captions, shared-scale activity and exact keyboard-accessible values, independent error/retry, and native account-switch evidence. [Record](../redesign/phase-5/p5-06/README.md). Baseline: 934 backend, 398 frontend (+8), 79 actual browser passes (+2) plus unchanged P2-D01 expected failure; security 9/6/1, configuration 3. No new metrics/backend contracts or Phase 8 customization. P5-07 is recorded separately above; F04, incomplete axe and manual screen-reader acceptance remain open.
- **P5-06-O01 — native language-preference 500, cause unproven:** the first full browser attempt observed a generic 500 during overlapping Dashboard/setup reads after Browser Back. Visual preparation now requires the native preference save before mounting the next Dashboard; no retry or backend repair. Investigate the unchanged endpoint separately; concurrent language writes during loading remain uncertified. [Evidence](../redesign/phase-5/p5-06/README.md#regression-protection).
- **P5-07-O01 — existing confirmation focus observation:** an inherited light/English desktop attachment test failed Shift+Tab-to-Delete after initial Cancel focus. The unchanged provider refocuses Cancel on transition entry; a transition/focus race is plausible but not instrumented/proven. Keep separate from Analytics; no provider/test repair or weakened assertion. A passing rerun does not close it. [Evidence](../redesign/phase-5/p5-07/README.md#validation-observations-retained).
- **P5-04b complete — Table/Board integration:** one Jobs filter owner and URL view switch, retained `/kanban` alias, Table page/selection lifetime and full Board population. [Acceptance/evidence](../redesign/phase-5/p5-04b/README.md). Baseline: 934 backend, 390 frontend, 77 actual browser passes + unchanged P2-D01 expected failure; security 9/6/1, configuration 3. No backend contract changes, P5-06 or B07. F04, P2-D01, incomplete axe/manual screen-reader/native touch and Board scaling remain open.
- **P5-04b query readiness complete — GO for integration's read prerequisite:** shared server query and URL interpretation, full Board versus paged Table ID parity, refresh/focus and failure evidence. [Record](../redesign/phase-5/p5-04b-readiness/README.md). Baseline: 934 backend, 384 frontend, 76 actual browser passes + unchanged P2-D01 expected failure; security 9/6/1, configuration 3. Earlier unchanged command-focus/CV smoke failures are recorded as R01/R02, not silently closed by passing reruns. No integration, P5-06 or B07 implemented; F04/manual screen-reader/native touch remain open.
- **P5-03 — Jobs Table and mobile cards complete:** restrained table/card presentation, existing Comfortable/Compact controls, localized display, partial-bulk retry, and Browser Back row focus have [real-browser and unit evidence](../redesign/phase-5/p5-03/README.md). Baseline: 918 backend, 377 frontend, 74 actual browser passes plus unchanged P2-D01 expected failure. P5-00-D02 and P4-05-O01 close for Jobs/Trash; P5-02 manual screen-reader acceptance and F04 remain open. Stop before P5-04a.
- **P5-01 — AppShell/grouped navigation complete:** existing destinations are grouped under Dashboard, Job search, Career, Admin and Account; expanded/rail/mobile access, parent/child current semantics, skip/main and route-heading focus have automated and visual evidence. Final baseline: 918 backend, 365 frontend, 70 browser passes plus unchanged P2-D01 expected failure. [Record](../redesign/phase-5/p5-01/README.md). P5-02 remains separate; no route/provider/business change or B07 work.
- **P5-02 — global shell utilities implemented, accessibility acceptance conditional:** command error/retry and stale-result isolation, grouped existing commands, keyboard selection, and notification stale-load/read/dismiss presentation pass 918 backend, 373 frontend and 74 actual browser tests plus unchanged P2-D01 expected failure. [Record](../redesign/phase-5/p5-02/README.md). P5-02-D01's spoken-name and live/state-announcement check remains mandatory for P5-15; it does not block independent P5-03 Jobs work. F04 remains open.
- **P5-00 — complete, P5-01 GO:** [record](../redesign/phase-5/p5-00/README.md) covers the five bounded shell gates, shared 1024px navigation boundary and open-drawer resize lifecycle. P5-00-D01 is closed with the existing fixed clock injected into the test; backend rerun is 916/916. No grouped-navigation redesign or B07 work in that checkpoint. F04 remains open.
- **P5-00-D02 — closed for Jobs:** P5-03 stores the originating row focus target on the list history entry and restores it after Browser Back and data load; explicit workspace Back remains intact. Four locale/theme browser cases pass. Revalidate if P5-08 changes workspace navigation. [Evidence](../redesign/phase-5/p5-03/README.md).
- **Phase 5 plan:** [bounded plan](../redesign/phase-5/README.md) maps all 57 contracts/31 routes. Board integration, native package and CV revision/rendering gates apply only to dependent slices. F04 remains open.
- **P2-D01 — successor native proof:** [P5-08b readiness](../redesign/phase-5/p5-08b-readiness/README.md) repairs SQLite ordering and executes successful capture plus immutable-content/file/ZIP assertions. Its final baseline records conversion of the original expected failure into an ordinary regression. Historical reproduction remains in Phase 2. P2-O01's initial rules-500 behavior remains unconfirmed.
- **P3-O01/P3-O02 — scoped follow-up:** P5-06/P5-07 address Dashboard/Analytics population/period/sample presentation and independent error retention. Backend metric definitions and other navigation/query surfaces remain separately scoped. Evidence is in the current [redesign decision records](../redesign/phase-3/OPEN_DECISIONS.md).
- **P4-02-D02 — open accessibility debt:** company save-error feedback outside the modal's accessible subtree. D01 command-list semantics are addressed in P5-00; D03 progress-scroll access closes for the targeted P5-08a strip; D04's literal AI context was corrected in [P5-08b readiness](../redesign/phase-5/p5-08b-readiness/README.md) and remains regression protected. [Original evidence](../redesign/phase-4/p4-02/README.md). Do not disable modal background isolation or hide findings.
- **P5-08a-O01/O03 — scoped successors:** the readiness checkpoint protects existing next-task aliases and unique labelled content; [P5-08b](../redesign/phase-5/p5-08b/README.md) revalidates the seven-section adapter/composition. **O02** retains two failed menu-contrast runs and the explicitly justified settled-state fixture wait; no Dashboard styling change or broader manual certification. [Record](../redesign/phase-5/p5-08a/README.md).
- **P5-00 scoped closures:** P4-03-D01 Tooltip contrast, P4-04-O01 bottom-action toast overlap, P4-06-O01 mobile labels/focus and P4-06-O02 synthetic long admin metadata are addressed with [readiness evidence](../redesign/phase-5/p5-00/README.md). This does not certify all overlays, all accessibility targets or deployed production behavior.
- **P4-04-O02 — existing SQLite notification-save contention:** overlapping native preference read/write requests reproduced HTTP 500 with SQLite error 5 in two of ten local runs. The sequential UI test now awaits and requires the save response before readback; server concurrency remains unresolved. Investigate separately from page-layout/density work. [Evidence](../redesign/phase-4/p4-04/README.md).
- **P4-05-O01 — closed for Jobs/Trash:** P5-03 localizes standard status display and date labels while retaining raw API status values, custom labels and stored dates. [Evidence](../redesign/phase-5/p5-03/README.md).
- **F04/B06 — open:** complete the authorized main release and production ingress/runtime verification; the browser gate and runner diagnostics remain unresolved. No gate should be bypassed.
## Delivery and feature gates
- Deploy the verified CV Builder/UI batch through protected `main` and confirm the live health/version transition.
- Run authenticated production CV editing/PDF, existing-data, attachment, email-verification, OAuth, and rollback smoke checks when an authorized session is available.
- Activate Stripe only after the recurring Pro price, portal, webhook, and external secrets are configured; see [known issues](known-issues.md).
- Rehearse backup/restore and the legacy `Job`/`JobApplication` cutover against a restored production backup before removing compatibility columns.
## CV Builder preservation and next slice
The current builder already includes expandable sections, preset/free-text custom sections, section AI review, Code and other capability-aware templates, accent/typography controls, shared preview/PDF rendering, and extraction confidence handling. Preserve these under PRES-C02/C07/C08/C09/C12; they are not new backlog requirements. See the [functionality inventory](../redesign/audit/FUNCTIONALITY_INVENTORY.md) and [57-group preservation matrix](../redesign/phase-2/PRESERVATION_MATRIX.md).
The [native readiness](../redesign/phase-5/p5-09-readiness/README.md) and [pagination repair](../redesign/phase-5/p5-09-pagination-readiness/README.md) now establish the bounded local preview/PDF contract requested during P4-03. P4-03 remains the keyboard/viewport proof. Later P5-11/P5-12 presentation/control work must retain this measured output baseline and explicitly carry broader photo/wrapping/deployment-font and print-quality qualifications; do not restart already-completed builder features from archived plans.
Completed phase items are intentionally omitted here; their evidence remains in the current redesign checkpoint records and recoverable historical archive.