2.5 KiB
TODO
Status reconciled: 2026-09-11.
Current repository work
- P4-02 — open: finish the current UI semantic-control and modal-state review, preserve
RichTextField/draft behavior, then run full regression and visual evidence. The active implementation record isdocs/redesign/phase-4/p4-02/README.md. - P2-D01 — open: repair the SQLite
DateTimeOffsetordering baseline before package/tailoring restructuring; retain the expected-failure browser oracle until native capture and historical-binary preservation are proven. P2-O01's initial rules-500 behavior also remains unconfirmed. - P3-O01/P3-O02 — open: address analytics population/period labels and navigation/query/error retention when those surfaces are next changed. Evidence is in the current redesign decision records.
- F04/B06 — open: complete the authorized main release and production ingress/runtime verification; the browser gate and runner diagnostics remain unresolved. No gate should be bypassed.
Delivery and feature gates
- Deploy the verified CV Builder/UI batch through protected
mainand confirm the live health/version transition. - Run authenticated production CV editing/PDF, existing-data, attachment, email-verification, OAuth, and rollback smoke checks when an authorized session is available.
- Activate Stripe only after the recurring Pro price, portal, webhook, and external secrets are configured; see known issues.
- Rehearse backup/restore and the legacy
Job/JobApplicationcutover against a restored production backup before removing compatibility columns.
CV Builder preservation and next slice
The current builder already includes expandable sections, preset/free-text custom sections, section AI review, Code and other capability-aware templates, accent/typography controls, shared preview/PDF rendering, and extraction confidence handling. Preserve these under PRES-C02/C07/C08/C09/C12; they are not new backlog requirements. See the functionality inventory and 57-group preservation matrix.
P4-03's future scope is the loaded preview keyboard/viewport boundary, after review of P4-02. Broader editor changes require their own approved slice and preservation evidence; do not restart already-completed builder work from archived plans.
Completed phase items are intentionally omitted here; their evidence remains recoverable in the pre-cleanup backup and existing archive.