Files
jobtrackingapp/docs/roadmap/todo.md
T

2.5 KiB

TODO

Status reconciled: 2026-09-11.

Current repository work

  • P4-02 — open: finish the current UI semantic-control and modal-state review, preserve RichTextField/draft behavior, then run full regression and visual evidence. The active implementation record is docs/redesign/phase-4/p4-02/README.md.
  • P2-D01 — open: repair the SQLite DateTimeOffset ordering baseline before package/tailoring restructuring; retain the expected-failure browser oracle until native capture and historical-binary preservation are proven. P2-O01's initial rules-500 behavior also remains unconfirmed.
  • P3-O01/P3-O02 — open: address analytics population/period labels and navigation/query/error retention when those surfaces are next changed. Evidence is in the current redesign decision records.
  • F04/B06 — open: complete the authorized main release and production ingress/runtime verification; the browser gate and runner diagnostics remain unresolved. No gate should be bypassed.

Delivery and feature gates

  • Deploy the verified CV Builder/UI batch through protected main and confirm the live health/version transition.
  • Run authenticated production CV editing/PDF, existing-data, attachment, email-verification, OAuth, and rollback smoke checks when an authorized session is available.
  • Activate Stripe only after the recurring Pro price, portal, webhook, and external secrets are configured; see known issues.
  • Rehearse backup/restore and the legacy Job/JobApplication cutover against a restored production backup before removing compatibility columns.

CV Builder preservation and next slice

The current builder already includes expandable sections, preset/free-text custom sections, section AI review, Code and other capability-aware templates, accent/typography controls, shared preview/PDF rendering, and extraction confidence handling. Preserve these under PRES-C02/C07/C08/C09/C12; they are not new backlog requirements. See the functionality inventory and 57-group preservation matrix.

P4-03's future scope is the loaded preview keyboard/viewport boundary, after review of P4-02. Broader editor changes require their own approved slice and preservation evidence; do not restart already-completed builder work from archived plans.

Completed phase items are intentionally omitted here; their evidence remains recoverable in the pre-cleanup backup and existing archive.