61 selected tests and build/lint pass. Wider rendered qualification remains in progress; this local checkpoint does not establish visual acceptance.
2.8 KiB
Secondary route visual review — in progress
4 November 2026. Runtime starts at published/verified 2218659ecf692e8e377dd33a9ce6415b01e43032. The initial visual run was deliberately interrupted after 35 baseline captures when material discrepancies were identified. These images are observations, not a complete passing matrix; see evidence/secondary/BEFORE_INTERRUPTED.json.
| Route | Actual phone review | Implementation / preservation |
|---|---|---|
| /companies | One card per company, relationship actions retained; no outer card around the collection | Retain meaningful company object boundary; desktop table and relationship paths remain |
| /offers | Page heading repeated below the shell heading | Removed redundant local heading; retained explanation, All Offers action, named results region, unknown facts and individual offer objects; object headings now h2 under page h1 |
| /operations | Open task cards were enclosed within another section card | Removed outer section surfaces, retaining named sections, individual notification/task objects, progress, permission-dependent actions, polling and focus/error/committed-write protections |
| /analytics | Independent chart/widget surfaces and explicit period/source explanations | Retain distinct data objects; do not remove necessary scope qualifications to save space or imply historical conversion |
| /trash | Existing filters and selection/pagination within results boundary; no additional nested collection card | Empty fixture only; real restore/delete and populated selection remain separately qualified |
| /cv/:slug | Public document route owns its paper and download link | Retain document boundary; no app sidebar/identity fetch introduced; synthetic preview is not physical PDF or deployed anonymous-access acceptance |
PASSED:61 selected component tests/five suites, export build and full lint after bounded Offer Comparison / Operations changes. The 36-configuration successor run writes to evidence/secondary-after and is IN PROGRESS. Do not claim216 passing captures until its final report succeeds. Source census and independent source review must be reconciled with the successor before publication.
Remaining screenshots and desktop/tablet layouts require inspection. These six routes do not cover all 34 routes or their loading/error/populated variants. Application Add Job/table/board/detail visual matrix is prepared as an opt-in extension of the existing verifier. Its one-configuration pilot passed four scans/captures and the controlled search→board→precise status→detail/context→return journey plus Add Job open/Escape and three alias URL checks, with one intercepted fixture status write. The complete36-configuration matrix remains NOT RUN until recorded otherwise. A pilot is not full qualification. No new application provider, model, migration or live action is included.