15 lines
1.7 KiB
Markdown
15 lines
1.7 KiB
Markdown
# Partial homepage planning handoff
|
|
|
|
Branch `feature/launch-site-redesign`, baseline `5cb903b989742b7a96cb22ddf4c0e24993b18980`. Documentation-only source audit. LAUNCH-00 remains IN_PROGRESS. LAUNCH-01 four actual desktop/mobile concepts are PENDING, not replaced by written descriptions. No owner design decision requested until reviewable concepts exist.
|
|
|
|
Next authorised work:
|
|
|
|
1. Inspect rendered homepage/signup and research contemporary patterns using credible public sources. Preserve existing routing and privacy boundaries.
|
|
2. Obtain provenance-bound synthetic screenshots from accepted evidence or an isolated test environment. The committed pre-P10 visual manifest contains real PDF previews/contact sheets, not a complete set of dashboard/CV editor/mobile product captures. Inspect any image before reuse; do not touch the separate pre-p10-ux worktree.
|
|
3. Produce four distinct, viewable desktop/mobile concepts and an asset/licence manifest. No external image/font acquisition without appropriate rights. Concept placeholders cannot be represented as real application screenshots.
|
|
4. Present concrete concepts for mix-and-match owner feedback, then stop final implementation until explicit final-design approval. Design approval does not authorise publication.
|
|
|
|
No assets, app code, tests, routes, packages, production services or authenticated dashboard were changed. Rendered/browser/performance/accessibility/SEO checks NOT RUN. No production feature/pricing/language availability was asserted.
|
|
|
|
The delegated design task stopped at a service usage limit before saving deliverables. Parent continued the source audit and preserved this checkpoint. No design agent is running in the background.
|