38 lines
6.2 KiB
Markdown
38 lines
6.2 KiB
Markdown
# Direct roadmap status
|
||
|
||
Updated 11 November 2026. This register records direct-chat work. See [the continuation checkpoint](LATEST_CHECKPOINT.md) for exact integration refs and evidence.
|
||
|
||
| Workstream/checkpoint | Status | Dependency and evidence |
|
||
| --- | --- | --- |
|
||
| PHASE-10 / P10-00 assessment | COMPLETED | Report in `../redesign/phase-10/P10-00.md`; assessment `7ba1367`, publication receipts `8cdff28`/`1692142`. Remote exactly `1692142295950e390a4cf807d9df86cc5cf96290` on 2 November |
|
||
| P10-01 / CLEAN-20 | VALIDATED AND PUBLISHED | Owner approved only the unused `App.css` removal. Source and receipt at `78f7396a`. See [P10-01](../redesign/phase-10/P10-01.md) |
|
||
| P10-02 CV/documents | REVIEWED, RETAIN | Historical document and import compatibility kept. See [P10-02](../redesign/phase-10/P10-02.md) |
|
||
| P10-03 backend/dependencies/config | REVIEWED, RETAIN | No additional proven-safe removal. See [P10-03](../redesign/phase-10/P10-03.md) |
|
||
| P10-04 candidate functional/data verification | QUALIFIED WITH INHERITED LIMITS | Candidate checks and full local 1,448 backend/1,031 frontend receipts reconciled. Applicable historical source/environment evidence retained. Existing operational and human gates carry forward |
|
||
| P10-05 full acceptance | READY FOR OWNER REVIEW | Reviewed Conditional GO proposal, all57 preservation dispositions and Product Review handoff published at `59fd674f`. D02 final milestone decision pending. See [proposal](../redesign/phase-10/ACCEPTANCE_PROPOSAL.md) |
|
||
| PRODUCT-REVIEW-01 | FINAL REVIEW BLOCKED | Final audit requires accepted Phase 10. Approved A3 work advances separately under the owner's direct authorisation |
|
||
| A3 UI/UX modernisation | IM10 IN PROGRESS | Published through9f341750, final source99b144f4. Combined76 affected cases/seven suites, build/lint and Rules12 configurations/84 scans passed. Export/native/count matrices keep their recorded sources. V45–V47 resolved; other workflows/native/human/final Gate F open |
|
||
| INT-GLOBAL-JOBS-01 / GJ-00 | CONDITIONAL | Existing planning at `0ec9f98e6ed4a646fc5e017d8eb6fade07653f37`; exact remote reverified 2 November. No implementation authorised |
|
||
| INT-GLOBAL-JOBS-01 implementation | BLOCKED | Accepted Phase 10/Product Review, initiative approval and provider rights |
|
||
| I18N-01 / I18N-00 audit | PARTIAL | All 188 historical dynamic call reviews accounted for in published `4172c23d`. Full visible-text, native, market and European coverage remain open |
|
||
| I18N-01–08 implementation/acceptance | PARTIAL | Shared MUI/picker EN/NB defaults published through A3 `e6240ad3`. Live controls/drafts/theme verified in finite paired configurations. Legacy timestamp precision, broader visible-text/native review and additional locale publication remain open |
|
||
| LAUNCH-SITE-01 / LAUNCH-00 audit | PARTIAL | Design-neutral contracts at `af8c48ce` and rendered baseline reconciliation at `98483b80`. Design research, asset rights and public claims remain open |
|
||
| LAUNCH-01 four desktop/mobile concepts | PUBLISHED FOR REVIEW | Gallery and eight rendered screenshots at `ccb11494`. 20 controlled browser checks passed |
|
||
| LAUNCH-SITE final design/implementation | AWAITING_APPROVAL | Owner selection or combination is next. Refine and obtain final design approval before application implementation |
|
||
| SECURITY-AUDIT-01 | OFFLINE PREFLIGHT PARTIAL | Approved root policy published at `de3d5031`. Formal integrated scan requires a completed application baseline and applicable environment/cost approval |
|
||
| RELEASE-READINESS-01 / discovery and RR-11–14 | PARTIAL | Release branche1c8e845 explicitly propagates prune/enumeration failures.16 backup and6 rollback offline methods plus syntax passed; root verified diff/ref/source receipts. Earlier parser/guards/probes retained. Real rollback/restore/off-host/release qualification remain open |
|
||
| Release stages 2–7 baseline, qualification, remediation, requalification, rehearsal, final acceptance | BLOCKED | Final release candidate/prerequisites not accepted; each stage needs actual applicable environment and source-bound evidence |
|
||
| PERF-01 / 18 performance areas | IN PROGRESS | A3 page query, Companies cache, rules freshness and locale request changes published through `1d733675`. JobTable split trial remains isolated after a throttled phone regression. MariaDB plan/load validation blocked by unavailable local Docker engine |
|
||
|
||
Implemented, tested, accepted, published and production-ready are separate. Production is NO-GO. Historical counts are not fresh executions. See [blockers](BLOCKERS.md), [owner decisions](OWNER_DECISIONS.md), [completed work](WORK_COMPLETED.md) and [next actions](NEXT_ACTIONS.md).
|
||
|
||
## 11 November flat Edit Job continuation
|
||
|
||
- A3 published and remotely read back at `c172427fb21820084eb0b029178599c1f776edac`. Presentation `7bfebe88` removes four decorative Edit Job panels and the raised intro; verifier `552525df` adds tablet coverage. All fields, actions and revision/date payload contracts retained.
|
||
- PASSED: 29 tests in three suites, build/TypeScript and scoped lint. Nine finite three-timezone desktop/tablet/mobile journeys passed 27 accessibility captures and 18 intercepted fixture writes; zero page errors/unavailable reads. Earlier six journeys overlap the final nine. Desktop/mobile/tablet screenshots inspected. 147 committed source/evidence/export bindings verified. See A3 `docs/ui-modernisation/visual-correction/EDIT_DIALOG_FLAT_REVIEW.md`.
|
||
- V39 resolved within `/jobs`; the 34-route/57-group inventory and final owner/human qualification remain open. Other shared MUI labels and legacy timestamp semantics remain independent tasks. Phase 10 D02, launch selection, providers, integrated security/recovery and release gates are unchanged.
|
||
|
||
EN/NB import/conversion singular feedback qualified through511b68a1:50 overlapping cases, two paired profiles/six native conversions/six scans. Broader localisation and native-language review remain open.
|
||
|
||
11 November continuation: A3dbae1962 integrates submitted-CV revision integrity (22 scoped backend cases; legacy0 retained). Release4019569a closes mocked permission failure propagation (19 backup methods). Frontend76-case and UI matrices remain historical/source-bound; no new app-wide acceptance. Delegate quota and C-capacity limits documented; E build lane works.
|