4.7 KiB
Direct-roadmap continuity
2 November 2026. Worktree: C:\Users\Connor\.codex\worktrees\p10-assessment\Job tracker. Branch: feature/phase10-cleanup. Initial HEAD: fc5b9d377199ce51f480a920a3772108094929e3; reported handoff 5cb903b989742b7a96cb22ddf4c0e24993b18980 is an ancestor and matched its original branch's live remote readback. Frozen application source remains ba04d817fed26d659bfa2a56b089d6cac851dc34.
Completed and current gate
- Completed P10-00; preserved the existing staged worker draft with a dated review note. Only Markdown changed.
- Fresh checks: 263 indexed evidence hashes, 1,280 current frozen source files and 7 verifier-source entries all match; 57 groups retain 56 PARTIAL/C11 DEFERRED; 34 distinct routes match the preserved register. Product suites were NOT RUN. Historical results remain historical.
- Sole proposed candidate: P10-01/CLEAN-20, delete the unimported original CRA
job-tracker-ui/src/App.css, blob74b5e053450a48a6bdb4d71aad648e7af821975c. Exact callers/data/routes, required checks, rollback and stop conditions are in P10-00. All other assessed compatibility code remains retained. - Await explicit candidate-specific owner approval in this chat. No implementation is authorised yet. Do not treat approval of this stylesheet as permission for P10-02 or another initiative.
- Assessment checkpoint/publication: pending the normal commit/push/readback at the time this file was first written; append exact observed results below. Resolve current HEAD with Git, since this document cannot contain its own commit hash.
Resume without repeating the assessment
Read any newer owner reply and this handoff. Inspect current Git state and the candidate/source identity. Reuse the source-bound accepted evidence if unchanged. If CLEAN-20 is approved, perform only its documented patch/verification/publication, updating evidence and this handoff. Do not reinstall/retest unchanged product scope merely to restart this chat. Significant or affected changes require fresh applicable checks. Missing dependencies/graph/build/runtime prerequisites must be reported accurately, without modifying another worktree or inventing results.
No autonomous controller commands or state, keys, signatures, approvals, configuration or queue may be used, repaired or changed. It must remain paused. Do not modify C:\Users\Connor\.codex\worktrees\pre-p10-ux\Job tracker. No main merge, production deployment, production services, application AI models or deferred CV-import overhaul/personal portfolio work is authorised.
Authoritative order after Phase 10 acceptance
All seven source files exist; their bytes were fingerprinted during P10-00. Only the active Phase 10 source was read as execution requirements here. Before entering each later workstream, read its complete source and every required linked/subordinate prompt, recheck dependencies and obtain its applicable entry decisions. Do not substitute this order table or old orchestrator records for those requirements.
| Order | Workstream / source below E:\Storage\Projects\Active\temp docs\final\ |
Source SHA256 observed |
|---|---|---|
| 1 | PHASE-10: Prompt 5 — Phase 10.txt |
f3d5d183a1cd653aac2207a8435ba95fbb74ef4bb8cc91d605edd959f9f4ec72 |
| 2 | PRODUCT-REVIEW-01: Prompt 6 — PRODUCT-REVIEW-01.txt |
544d11a2d1e9a913397766c7e475f63338f0b735d2bb26dcabdedb6fe9e25a58 |
| 3 | INT-GLOBAL-JOBS-01: done\Prompt 7 — INT-GLOBAL-JOBS-01.txt |
c67c70862eecf677e1f2944fd0e17799068c054738d520513955fcf6542c52ce |
| 4 | I18N-01: I18N\00_MASTER_ORCHESTRATOR.md, including its entire linked prompt pack |
6365901a0521d603f8059de31492bc6353229c684da23b8553df49b4844fd330 |
| 5 | LAUNCH-SITE-01: Prompt 10 - homepage.txt |
f1d2b143796725e37b9a86643975a716f0be2109687fc772c6e26dae5172eaa0 |
| 6 | SECURITY-AUDIT-01: jobjakt-security\MASTER_PROMPT.md, including its entire linked prompt pack |
37bec461f84df60b787bda45db3bd9af1a6c836c6c023f3ab6dd7dc4beb2c6db |
| 7 | RELEASE-READINESS-01: prompt 11 - release readiness.txt |
12c846d754b170c2e767db05816f4053d9e8c4cf58a2349121b2de91875beaf2 |
Phase 10 checkpoints remain P10-00 baseline, P10-01 frontend, P10-02 CV/document compatibility, P10-03 backend/dependencies/config, P10-04 data/functional verification, P10-05 full acceptance. Subsequent scopes require evidence and the applicable candidate gates. If nothing is safely removable, say so; never invent a deletion to complete a checkpoint.
Human/device/language/printing, AI semantics, provider licences, hosted CI, security and production decisions remain separate. SQLite retirement stays a separately gated initiative. Production NO-GO does not prohibit an otherwise authorised bounded assessment.