909 lines
24 KiB
Markdown
909 lines
24 KiB
Markdown
# Jobjakt — AUTOMATION-HANDOFF-01
|
||
## Finish Pre-Phase-10 Acceptance and Prepare for Autonomous Roadmap Execution
|
||
|
||
### Your role
|
||
|
||
Act as Jobjakt's senior QA engineer, release engineer, software architect, Git integration specialist and autonomous-development handoff coordinator.
|
||
|
||
Your task is to complete the remaining safely achievable Pre-Phase-10 acceptance work and prepare a reliable, machine-readable handoff for the separate AUTONOMOUS-ROADMAP-01 Codex orchestrator.
|
||
|
||
**Do not begin Phase 10.**
|
||
|
||
Your objective is to leave the development repository in a verified, clean, reproducible state from which an independently authorised automation system can safely begin Phase 10 and eventually continue through the remaining roadmap.
|
||
|
||
Work autonomously through normal development, testing, remediation, documentation and feature-branch publication.
|
||
|
||
Only interrupt me when genuine human approval, manual testing or external infrastructure action is needed.
|
||
|
||
---
|
||
|
||
# 1. Starting baseline
|
||
|
||
Latest reported development environment:
|
||
|
||
Local URL:
|
||
`http://jobbjakt.local/`
|
||
|
||
Branch:
|
||
`test/pre-phase10-ux-acceptance`
|
||
|
||
Latest reported commit:
|
||
`5032ccb`
|
||
|
||
Reported status:
|
||
|
||
- Working tree clean.
|
||
- Backend: 1,448 tests passed.
|
||
- Frontend: 1,031 tests passed.
|
||
- Python: 83 tests passed.
|
||
- Real MariaDB: 90 tests passed.
|
||
- Ordinary browser regression: 380 tests passed.
|
||
- Real CV extraction verified.
|
||
- Queued AI strategy generation verified.
|
||
- Scheduled job enrichment verified.
|
||
- Conflicting JSON instructions in the strategy route corrected.
|
||
- Synthetic accounts and temporary test containers cleaned up.
|
||
- Two local commits remain unpublished because Git server connectivity failed.
|
||
- Production remains NO-GO.
|
||
- No merge or deployment occurred.
|
||
|
||
Outstanding qualifications include:
|
||
|
||
- CV AI extraction and semantic accuracy.
|
||
- Human accessibility testing.
|
||
- Physical-device testing.
|
||
- Human language review.
|
||
- PDF template spacing and visual qualification.
|
||
- Historical Phase 9, Python dependency and CI requirements where still applicable.
|
||
- Existing production-only infrastructure and recovery gates.
|
||
|
||
Read the actual current evidence before relying on this summary.
|
||
|
||
Primary documentation:
|
||
|
||
`docs/pre-phase10-ux/ACCEPTANCE.md`
|
||
|
||
`docs/pre-phase10-ux/CV_QA_HANDOFF.md`
|
||
|
||
Also inspect the authoritative CV-UX, CV-IMPORT, CV-QA, RD21, Phase 9, Phase 10 and preservation documentation.
|
||
|
||
Verify which reported checks are actually complete, which were conditionally accepted and which remain outstanding.
|
||
|
||
Do not invent evidence for missing results.
|
||
|
||
---
|
||
|
||
# 2. Relationship to the automation orchestrator
|
||
|
||
A separate workstream named:
|
||
|
||
`AUTONOMOUS-ROADMAP-01`
|
||
|
||
is responsible for building a persistent Windows-compatible Codex orchestrator.
|
||
|
||
That orchestrator will eventually process the approved roadmap:
|
||
|
||
05 — Phase 10 cleanup.
|
||
|
||
06 — PRODUCT-REVIEW-01.
|
||
|
||
07 — INT-GLOBAL-JOBS-01.
|
||
|
||
08 — I18N-01 translations.
|
||
|
||
09 — LAUNCH-SITE-01 homepage redesign.
|
||
|
||
10 — SECURITY-AUDIT-01.
|
||
|
||
11 — RELEASE-READINESS-01.
|
||
|
||
Your responsibility is **not** to implement or run this orchestrator.
|
||
|
||
Your responsibility is to make the current repository and its acceptance evidence suitable for the orchestrator to consume.
|
||
|
||
You must provide:
|
||
|
||
- An authoritative accepted development baseline.
|
||
- A complete pre-Phase-10 blocker register.
|
||
- Structured acceptance evidence.
|
||
- Stage dependency and gate definitions.
|
||
- Explicit deferrals and reasons.
|
||
- Human approval requirements.
|
||
- Git branch and remote state.
|
||
- Reproducible verification commands.
|
||
- An exact Phase 10 handoff.
|
||
|
||
Coordinate through documented contracts, not by modifying the other worktree or running a second orchestrator.
|
||
|
||
---
|
||
|
||
# 3. Git and worktree safety
|
||
|
||
Stay on the currently authorised Pre-Phase-10 development branch, or the verified equivalent worktree containing its complete history.
|
||
|
||
Before making changes:
|
||
|
||
1. Verify Git status.
|
||
2. Verify current HEAD.
|
||
3. Verify ancestry of commit `5032ccb`.
|
||
4. Inspect pending local commits.
|
||
5. Identify the configured Gitea remote.
|
||
6. Confirm the worktree is not being modified by another Codex session.
|
||
7. Determine which branch contains the latest accepted integration history.
|
||
|
||
Do not assume `main` includes the redesign.
|
||
|
||
Do not reset, rebase destructively, cherry-pick blindly or force-push.
|
||
|
||
Do not alter the separate automation worktree.
|
||
|
||
Do not merge into `main`.
|
||
|
||
Do not deploy production.
|
||
|
||
If new commits are required, keep them on the authorised pre-Phase-10 branch and document their hashes.
|
||
|
||
---
|
||
|
||
# 4. P10-HANDOFF-00 — Comprehensive acceptance reconciliation
|
||
|
||
Begin with a complete review of the existing acceptance evidence.
|
||
|
||
Determine whether the currently reported implementation genuinely satisfies the mandatory development requirements.
|
||
|
||
Investigate:
|
||
|
||
### CV Builder
|
||
|
||
- Creating a completely blank CV with zero unwanted content sections.
|
||
- Creating a CV from Career Profile.
|
||
- Undo/redo across supported editor operations.
|
||
- Save, refresh and recovery.
|
||
- Multiple-session editing.
|
||
- Existing CV compatibility.
|
||
- Historical document preservation.
|
||
|
||
### CV templates
|
||
|
||
- Existing template spacing.
|
||
- New template library.
|
||
- Optional-photo templates.
|
||
- Font consistency.
|
||
- Page margins.
|
||
- Section spacing.
|
||
- Bullet indentation.
|
||
- Multi-page layout.
|
||
- PDF preview/export agreement.
|
||
|
||
### CV import
|
||
|
||
- Real PDF extraction.
|
||
- Real DOCX extraction.
|
||
- Career Profile mapping.
|
||
- New-record creation.
|
||
- Review and corrections.
|
||
- Duplicate handling.
|
||
- Transactional MariaDB persistence.
|
||
- Failure recovery.
|
||
- Source provenance.
|
||
|
||
### Dashboard
|
||
|
||
- Widget drag-and-drop.
|
||
- Resizing.
|
||
- Show/hide controls.
|
||
- Layout persistence.
|
||
- Mobile behaviour.
|
||
- Keyboard accessibility.
|
||
- Existing preference compatibility.
|
||
|
||
### Admin Processing Monitor
|
||
|
||
- Job attribution to the submitting user.
|
||
- Related job application or import record.
|
||
- Processing stage.
|
||
- Status and duration.
|
||
- Failure diagnostics.
|
||
- Sanitised event logs.
|
||
- Administrative authorisation.
|
||
- Tenant isolation.
|
||
- Log redaction.
|
||
|
||
### AI workflows
|
||
|
||
- CV extraction.
|
||
- Queued AI strategy generation.
|
||
- Scheduled job enrichment.
|
||
- Safe structured outputs.
|
||
- Processing failure handling.
|
||
- Disabled/unqualified AI functionality.
|
||
- Model compatibility and semantic qualification requirements.
|
||
|
||
### Application preservation
|
||
|
||
- Existing routes.
|
||
- Authentication.
|
||
- Career Profile.
|
||
- Jobs and applications.
|
||
- CVs.
|
||
- Cover letters.
|
||
- Dashboard.
|
||
- Settings.
|
||
- Administration.
|
||
- English/Norwegian.
|
||
- Existing functionality-preservation contracts.
|
||
|
||
Use actual repository implementation and evidence.
|
||
|
||
Create a traceability matrix mapping each required capability to its test evidence and acceptance status.
|
||
|
||
Do not claim that an untested feature passed merely because its implementation exists.
|
||
|
||
---
|
||
|
||
# 5. P10-HANDOFF-01 — Fix remaining bounded defects
|
||
|
||
Investigate the remaining pre-Phase-10 defects.
|
||
|
||
Prioritise:
|
||
|
||
1. User-data loss or corruption.
|
||
2. Broken Career Profile persistence.
|
||
3. Import approval failures.
|
||
4. Missing-record creation.
|
||
5. Undo/redo defects.
|
||
6. Incorrect blank CV behaviour.
|
||
7. Broken template spacing or clipping.
|
||
8. Missing PDF content.
|
||
9. Admin authorisation or sensitive-log exposure.
|
||
10. Broken dashboard persistence.
|
||
11. Confirmed regressions in existing workflows.
|
||
|
||
Fix reproducible defects that are within the current acceptance scope.
|
||
|
||
For each fix:
|
||
|
||
- Record the reproduction.
|
||
- Identify the root cause.
|
||
- Implement the smallest maintainable correction.
|
||
- Add regression tests.
|
||
- Run targeted verification.
|
||
- Update the acceptance matrix.
|
||
|
||
Do not begin unrelated product features.
|
||
|
||
Do not redesign major parts of Jobjakt unnecessarily.
|
||
|
||
If a requested change is genuinely outside the existing acceptance scope, record it as a separate backlog item rather than silently expanding Phase 10.
|
||
|
||
Do not change acceptance criteria solely to obtain a PASS.
|
||
|
||
---
|
||
|
||
# 6. P10-HANDOFF-02 — PDF spacing and document qualification
|
||
|
||
The remaining PDF spacing review requires particular attention.
|
||
|
||
The original PDF fidelity fixtures previously passed on Windows and Linux, but this does not automatically establish that every template has excellent spacing.
|
||
|
||
Perform a dedicated visual and functional audit of the current CV template library.
|
||
|
||
Render representative synthetic CVs using every available template.
|
||
|
||
Include:
|
||
|
||
- Short CV.
|
||
- Long CV.
|
||
- Multiple employers.
|
||
- Dense education.
|
||
- Long skill lists.
|
||
- Several languages.
|
||
- Norwegian characters.
|
||
- Optional profile photographs.
|
||
- Multi-page content.
|
||
- Cover letters where applicable.
|
||
|
||
Check:
|
||
|
||
- Section spacing.
|
||
- Line height.
|
||
- Paragraph rhythm.
|
||
- Headers.
|
||
- Margins.
|
||
- List indentation.
|
||
- Column alignment.
|
||
- Page breaks.
|
||
- Font weights.
|
||
- Text clipping.
|
||
- Missing content.
|
||
- Excessive whitespace.
|
||
- Preview/PDF differences.
|
||
|
||
Generate actual rendered preview images or PDFs for inspection.
|
||
|
||
Fix measurable formatting defects.
|
||
|
||
Create a visual comparison package for owner review where aesthetic approval is necessary.
|
||
|
||
Retain historical document compatibility and existing licensed-font arrangements.
|
||
|
||
Do not modify golden fixtures merely to conceal regressions.
|
||
|
||
Distinguish:
|
||
|
||
- Automated PDF fidelity: PASS/FAIL.
|
||
- Semantic content completeness: PASS/FAIL.
|
||
- Visual spacing qualification: PASS/PARTIAL/FAIL.
|
||
- Human print approval: PASS/NOT TESTED.
|
||
|
||
If human visual or printing acceptance is required by the authoritative Phase 10 entry criteria, prepare the relevant review artifacts and keep that gate pending until I approve them.
|
||
|
||
---
|
||
|
||
# 7. P10-HANDOFF-03 — Real AI and security qualification
|
||
|
||
Review the actual current AI architecture.
|
||
|
||
The latest report states real CV extraction, queued AI strategy generation and scheduled enrichment have been verified.
|
||
|
||
Determine precisely what was exercised.
|
||
|
||
Distinguish:
|
||
|
||
- Real Docling parsing.
|
||
- Deterministic extraction.
|
||
- Model-assisted processing.
|
||
- Queued task execution.
|
||
- Structured-output validation.
|
||
- Real model inference.
|
||
- Semantic correctness.
|
||
- User-reviewed final output.
|
||
- Source-grounded accuracy.
|
||
|
||
Do not interpret a successful AI request or completed background job as proof of good AI output.
|
||
|
||
Inspect the existing model qualification and Python dependency security evidence.
|
||
|
||
Determine which checks can safely run in the isolated development environment.
|
||
|
||
If approved model artifacts and safe runtime conditions exist, conduct authorised targeted model evaluations.
|
||
|
||
Otherwise preserve the relevant qualification as BLOCKED or NOT TESTED.
|
||
|
||
Do not download large models to production.
|
||
|
||
Do not change live Ollama services or model caches.
|
||
|
||
Do not accept security risks on my behalf.
|
||
|
||
If optional AI functionality is disabled, isolated and not required for Phase 10 code cleanup, document whether its remaining qualification can legally and technically be deferred under the existing acceptance criteria.
|
||
|
||
Do not falsely mark AI production-ready.
|
||
|
||
---
|
||
|
||
# 8. P10-HANDOFF-04 — Human and manual acceptance
|
||
|
||
Prepare a prioritised owner-test package.
|
||
|
||
Include:
|
||
|
||
- What to test.
|
||
- Why it matters.
|
||
- Exact page or workflow.
|
||
- Preconditions.
|
||
- Test steps.
|
||
- Expected behaviour.
|
||
- Pass/fail criteria.
|
||
- Evidence to capture.
|
||
- Whether the test blocks Phase 10 or production only.
|
||
|
||
Cover:
|
||
|
||
- Real mobile/tablet.
|
||
- Keyboard-only usage.
|
||
- Screen reader.
|
||
- English copy.
|
||
- Norwegian Bokmål copy.
|
||
- Other implemented languages.
|
||
- CV editor usability.
|
||
- Template visual approval.
|
||
- PDF printing.
|
||
- Job tracking.
|
||
- Dashboard layout.
|
||
- Admin diagnostics.
|
||
- AI-generated content review where enabled.
|
||
|
||
Complete checks that can genuinely be performed automatically.
|
||
|
||
Do not fabricate physical-device, human language, screen-reader or printing test results.
|
||
|
||
Where a mandatory human decision is needed, flag it clearly.
|
||
|
||
Prefer a small, well-prioritised owner checklist over a large unstructured testing document.
|
||
|
||
---
|
||
|
||
# 9. P10-HANDOFF-05 — Resolve Git publication
|
||
|
||
Two local commits were reported to be awaiting publication.
|
||
|
||
Diagnose the Gitea connectivity issue safely.
|
||
|
||
Verify:
|
||
|
||
- Remote URL.
|
||
- DNS.
|
||
- Network reachability.
|
||
- HTTPS connectivity.
|
||
- TLS validation.
|
||
- Git authentication, if reached.
|
||
- Local/remote branch divergence.
|
||
|
||
If the remote becomes available, perform a normal push of the authorised development branch.
|
||
|
||
Verify remote HEAD equals the intended local commit.
|
||
|
||
Do not force-push.
|
||
|
||
Do not disable TLS verification.
|
||
|
||
Do not expose tokens or credentials.
|
||
|
||
If connectivity remains unavailable:
|
||
|
||
- Preserve all local commits.
|
||
- Record precise diagnostics.
|
||
- Mark Git publication BLOCKED.
|
||
- Provide exact operator actions.
|
||
- Do not declare the remote branch published.
|
||
|
||
A pending or failed push must be represented accurately in the automation handoff.
|
||
|
||
Do not let the orchestrator silently assume that a local commit exists remotely.
|
||
|
||
Also inspect the separately completed GJ-00 planning branch's publication status without merging or modifying it.
|
||
|
||
---
|
||
|
||
# 10. P10-HANDOFF-06 — Full regression baseline
|
||
|
||
After bounded remediation, run the applicable regression suites.
|
||
|
||
Include:
|
||
|
||
- .NET backend.
|
||
- React frontend.
|
||
- Ordinary browser.
|
||
- CV import browser journeys.
|
||
- Real MariaDB integration.
|
||
- RD21 concurrency and recovery.
|
||
- Python sidecar.
|
||
- Document extraction.
|
||
- Queued processing.
|
||
- Scheduled job enrichment.
|
||
- CV Editor.
|
||
- PDF fidelity.
|
||
- Dashboard customisation.
|
||
- Admin processing monitor.
|
||
- Browser contracts.
|
||
- TypeScript.
|
||
- Lint.
|
||
- Builds.
|
||
- Security scans.
|
||
- Existing functionality preservation.
|
||
|
||
Use approved isolated environments.
|
||
|
||
Record:
|
||
|
||
- Commands.
|
||
- Exit codes.
|
||
- Environment details.
|
||
- Passed/failed/skipped counts.
|
||
- Test report paths.
|
||
- Final commit.
|
||
- Relevant test artifacts.
|
||
- Any checks not run.
|
||
|
||
Do not treat previously reported counts as newly executed evidence.
|
||
|
||
Never weaken tests merely to achieve a green result.
|
||
|
||
Ensure generated test reports are attributable to the specific tested commit.
|
||
|
||
---
|
||
|
||
# 11. P10-HANDOFF-07 — Define precise Phase 10 entry gates
|
||
|
||
This is the most important orchestration requirement.
|
||
|
||
Review the authoritative Phase 10 entry criteria.
|
||
|
||
Separate all outstanding work into:
|
||
|
||
### A. Mandatory Phase 10 blockers
|
||
|
||
Issues that must be resolved before code cleanup can safely begin.
|
||
|
||
### B. Permissible conditional-development deferrals
|
||
|
||
Items that may remain outstanding during Phase 10 only where an existing approved acceptance rule permits it.
|
||
|
||
### C. Production release blockers
|
||
|
||
Issues that can be addressed later without invalidating Phase 10 development.
|
||
|
||
### D. Future feature work
|
||
|
||
Items belonging to the post-Phase-10 product roadmap.
|
||
|
||
For every item include:
|
||
|
||
- Stable ID.
|
||
- Description.
|
||
- Evidence.
|
||
- Severity.
|
||
- Relevant acceptance criterion.
|
||
- Required action.
|
||
- Blocking phase.
|
||
- Responsible party.
|
||
- Deferral authority, if any.
|
||
- Current status.
|
||
|
||
Do not infer that an item is deferrable simply because it is inconvenient.
|
||
|
||
If a requirement is ambiguous or a conditional entry needs owner judgement, request approval rather than inventing permission.
|
||
|
||
Do not require every production-only infrastructure issue to be resolved before non-production Phase 10 work unless the authoritative criteria actually require it.
|
||
|
||
Likewise, do not advance with unresolved mandatory development-entry blockers.
|
||
|
||
---
|
||
|
||
# 12. P10-HANDOFF-08 — Machine-readable orchestration contract
|
||
|
||
Produce structured artifacts for the AUTONOMOUS-ROADMAP-01 orchestrator.
|
||
|
||
Place handoff documentation under:
|
||
|
||
`docs/automation/handoffs/pre-phase10/`
|
||
|
||
Use repository conventions where appropriate.
|
||
|
||
Required artifacts:
|
||
|
||
### `HANDOFF.md`
|
||
|
||
Human-readable overview of the current accepted state and readiness.
|
||
|
||
### `ACCEPTANCE.json`
|
||
|
||
Machine-readable status.
|
||
|
||
Include:
|
||
|
||
- Schema version.
|
||
- Workstream ID.
|
||
- Source branch.
|
||
- Local commit.
|
||
- Verified remote commit, if available.
|
||
- Worktree cleanliness.
|
||
- Acceptance status.
|
||
- Entry-gate status.
|
||
- Test evidence references.
|
||
- Unresolved blocker IDs.
|
||
- Permissible deferrals.
|
||
- Required owner approvals.
|
||
- Generation timestamp.
|
||
- Recommendation for Phase 10.
|
||
|
||
### `GATES.json`
|
||
|
||
Define stage-specific gate requirements, including:
|
||
|
||
- Required predecessor.
|
||
- Required test suites.
|
||
- Minimum acceptable evidence.
|
||
- Required Git state.
|
||
- Required preservation checks.
|
||
- Required manual approvals.
|
||
- Permissible conditional deferrals.
|
||
- Blocking findings.
|
||
|
||
### `BLOCKERS.json`
|
||
|
||
Structured unresolved-issue register.
|
||
|
||
### `TEST_EVIDENCE.json`
|
||
|
||
Index machine-verifiable test results and report artifacts.
|
||
|
||
Include commit binding and actual process exit codes.
|
||
|
||
### `MANUAL_ACCEPTANCE.md`
|
||
|
||
Prioritised human test and approval checklist.
|
||
|
||
### `PHASE10_BASELINE.md`
|
||
|
||
Exact branch and commit ancestry, preservation scope, safe cleanup targets and required compatibility checks.
|
||
|
||
### `READY_TO_RUN.md`
|
||
|
||
Exact conditions required to start automated Phase 10.
|
||
|
||
### `HANDOFF_SCHEMA.json`
|
||
|
||
JSON Schema for the exported acceptance package.
|
||
|
||
Validate all structured JSON.
|
||
|
||
Use stable keys and explicit status enums.
|
||
|
||
Do not include secrets, personal data or machine-specific credentials.
|
||
|
||
Absolute local paths may be included as informational references, but prefer repository-relative paths for portable automation.
|
||
|
||
---
|
||
|
||
# 13. Critical acceptance-security rule
|
||
|
||
The handoff package is evidence, not authority by itself.
|
||
|
||
A Codex-generated `ACCEPTANCE.json` must not be able to bypass a gate simply by claiming:
|
||
|
||
`"status": "GO"`
|
||
|
||
The orchestrator must independently verify:
|
||
|
||
- Required report existence.
|
||
- Test exit codes.
|
||
- Commit correspondence.
|
||
- Remote publication.
|
||
- Accepted predecessor stages.
|
||
- Mandatory blocker status.
|
||
- Applicable owner approvals.
|
||
|
||
Owner approvals must be maintained outside the model-writable repository or through another protected approval mechanism.
|
||
|
||
Do not generate approval tokens or owner signatures.
|
||
|
||
Do not mark human acceptance PASS without actual approval evidence.
|
||
|
||
If the external orchestrator already defines an acceptance schema, conform to it where compatible rather than creating a conflicting parallel standard.
|
||
|
||
If it is still under development, produce a clearly versioned proposed contract and document the integration requirements.
|
||
|
||
---
|
||
|
||
# 14. P10-HANDOFF-09 — Phase 10 cleanup inventory
|
||
|
||
Prepare the scope for the actual Phase 10 task.
|
||
|
||
Identify proven superseded components and code.
|
||
|
||
Include:
|
||
|
||
- Legacy CV Editor components.
|
||
- Old CV import components.
|
||
- Replaced dashboard layout configuration.
|
||
- Superseded admin-processing views.
|
||
- Unused style utilities.
|
||
- Duplicate services.
|
||
- Unreferenced frontend routes.
|
||
- Obsolete feature flags.
|
||
- Potentially unused dependencies.
|
||
- Historical compatibility components that must remain.
|
||
- Database code with active compatibility requirements.
|
||
|
||
For every proposed removal include:
|
||
|
||
- Location.
|
||
- Why it appears obsolete.
|
||
- Evidence of actual replacement.
|
||
- Current consumers.
|
||
- Dynamic/runtime reference risks.
|
||
- Related preservation group.
|
||
- Required regression test.
|
||
- Removal risk.
|
||
|
||
Do not remove these items as part of the handoff.
|
||
|
||
Do not delete old PDF renderers, document mappings or migrations solely because newer implementations exist.
|
||
|
||
Do not retire SQLite automatically.
|
||
|
||
Do not perform MariaDB major-version upgrades.
|
||
|
||
Phase 10 will make removal decisions using this evidence.
|
||
|
||
---
|
||
|
||
# 15. P10-HANDOFF-10 — Reconcile the remaining roadmap
|
||
|
||
The automation queue after Phase 10 is intended to contain:
|
||
|
||
05 — Phase 10 final redesign cleanup.
|
||
|
||
06 — PRODUCT-REVIEW-01 full application review.
|
||
|
||
07 — INT-GLOBAL-JOBS-01 international, cross-industry job discovery.
|
||
|
||
08 — I18N-01 expanded translations and locale qualification.
|
||
|
||
09 — LAUNCH-SITE-01 multilingual homepage redesign.
|
||
|
||
10 — SECURITY-AUDIT-01 adversarial audit and remediation.
|
||
|
||
11 — RELEASE-READINESS-01 production qualification.
|
||
|
||
Also preserve separate tracked initiatives:
|
||
|
||
- Deferred P5-13 AI qualification and model assessment.
|
||
- LinkedIn integration feasibility.
|
||
- Android application.
|
||
- SQLite retirement.
|
||
- MariaDB upgrade strategy.
|
||
- Monitoring and operational improvements.
|
||
- Future country integrations.
|
||
|
||
These initiatives must not be silently discarded simply because they aren't numbered 05–11.
|
||
|
||
Highlight the dependencies:
|
||
|
||
- Global Job Search depends on approved planning and provider permissions.
|
||
- Internationalisation overlaps with Global Job Search and homepage work.
|
||
- Product Review requires owner approval before starting its resulting implementation scope.
|
||
- Homepage final visual design requires owner approval.
|
||
- Production requires independent security, backup, recovery and release approval.
|
||
|
||
Create an automation-friendly roadmap summary without starting any later workstream.
|
||
|
||
---
|
||
|
||
# 16. Autonomous execution checkpoints
|
||
|
||
Execute safely in this order:
|
||
|
||
### AUTO-H01 — Baseline and acceptance reconciliation
|
||
Read the reports, verify actual Git state and establish existing evidence.
|
||
|
||
### AUTO-H02 — Targeted defect remediation
|
||
Fix bounded confirmed pre-Phase-10 defects.
|
||
|
||
### AUTO-H03 — PDF and AI qualification
|
||
Complete permitted verification and document remaining blocked items.
|
||
|
||
### AUTO-H04 — Manual acceptance preparation
|
||
Produce focused human test packages and record genuine approvals.
|
||
|
||
### AUTO-H05 — Git publication recovery
|
||
Publish pending development commits if the remote is available.
|
||
|
||
### AUTO-H06 — Full regression
|
||
Establish commit-bound verification evidence.
|
||
|
||
### AUTO-H07 — Structured automation handoff
|
||
Produce and validate schemas, gates, blocker registers and evidence manifests.
|
||
|
||
### AUTO-H08 — Phase 10 readiness
|
||
Determine the actual acceptance decision and exact automation prerequisites.
|
||
|
||
Commit and push validated checkpoints.
|
||
|
||
If the remote is unavailable, continue safe independent work and preserve commits locally.
|
||
|
||
Do not claim remote publication when it is unverified.
|
||
|
||
---
|
||
|
||
# 17. Required final decisions
|
||
|
||
Issue independent verdicts for:
|
||
|
||
**Pre-Phase-10 UX:** GO / CONDITIONAL GO / NO-GO.
|
||
|
||
**CV Integration:** GO / CONDITIONAL GO / NO-GO.
|
||
|
||
**PDF Spacing:** PASS / PARTIAL / FAIL.
|
||
|
||
**CV AI Accuracy:** PASS / PARTIAL / BLOCKED.
|
||
|
||
**Human/Device Acceptance:** PASS / PARTIAL / NOT TESTED.
|
||
|
||
**Python Security:** PASS / CONDITIONAL / BLOCKED.
|
||
|
||
**Hosted CI:** PASS / BLOCKED / FAIL.
|
||
|
||
**Preservation:** PASS / PARTIAL / FAIL.
|
||
|
||
**Git Publication:** VERIFIED / BLOCKED.
|
||
|
||
**Phase 10 Development Readiness:** GO / CONDITIONAL GO / NO-GO.
|
||
|
||
**Automation Handoff Package:** READY / INCOMPLETE.
|
||
|
||
**Production:** GO / NO-GO.
|
||
|
||
Every verdict must cite actual supporting evidence.
|
||
|
||
Distinguish implementation completion from acceptance, deployment and release readiness.
|
||
|
||
---
|
||
|
||
# 18. Final report
|
||
|
||
At completion, report:
|
||
|
||
1. Current branch and final commit.
|
||
2. Working-tree status.
|
||
3. Remote publication state.
|
||
4. Defects fixed.
|
||
5. Tests executed and actual totals.
|
||
6. Outstanding mandatory blockers.
|
||
7. Permitted deferrals.
|
||
8. Human actions required.
|
||
9. Automation handoff artifacts created.
|
||
10. Acceptance schema validation result.
|
||
11. Phase 10 entry decision.
|
||
12. Exact integration baseline for the orchestrator.
|
||
13. Whether the orchestrator may start automatically.
|
||
14. What it must verify independently before doing so.
|
||
|
||
If Phase 10 receives an authoritative GO or approved CONDITIONAL GO, mark the handoff eligible for orchestration.
|
||
|
||
However, **do not actually begin Phase 10**.
|
||
|
||
If required conditions remain outstanding, mark the stage BLOCKED and state exactly how it can become READY.
|
||
|
||
---
|
||
|
||
# 19. Hard restrictions
|
||
|
||
Do not:
|
||
|
||
- Merge into `main`.
|
||
- Deploy production.
|
||
- Start Phase 10.
|
||
- Start Global Job Search.
|
||
- Start the Product Review.
|
||
- Modify the separate automation worktree.
|
||
- Fabricate owner approval.
|
||
- Self-approve acceptance exceptions.
|
||
- Bypass Python security qualifications.
|
||
- Modify live Ollama.
|
||
- Download unapproved production models.
|
||
- Change production MariaDB.
|
||
- Perform destructive database migrations.
|
||
- Modify production Docker services.
|
||
- Modify or repair production filesystems.
|
||
- Remove compatibility code prematurely.
|
||
- Lower test requirements to achieve a GO.
|
||
|
||
Do not introduce unnecessary changes that disrupt the locally running `jobbjakt.local` environment.
|
||
|
||
If a test requires destructive operations, use a disposable database or isolated test environment.
|
||
|
||
---
|
||
|
||
# FINAL INSTRUCTION
|
||
|
||
Starting from the real current Pre-Phase-10 acceptance state, complete all safely achievable outstanding acceptance and remediation work.
|
||
|
||
Restore Git publication where possible.
|
||
|
||
Prepare a **machine-readable, independently verifiable Phase 10 handoff** suitable for AUTONOMOUS-ROADMAP-01.
|
||
|
||
Make the handoff robust enough that the orchestrator can identify:
|
||
|
||
- What has passed.
|
||
- What is blocked.
|
||
- What may be deferred.
|
||
- Which human approvals are required.
|
||
- Which exact commit forms the accepted baseline.
|
||
- Whether Phase 10 may begin.
|
||
|
||
Work autonomously, commit and push validated checkpoints, and prepare all necessary documentation.
|
||
|
||
**STOP after the final handoff report. Do not start Phase 10, merge into main or deploy production.** |