Files
jobtrackingapp/docs/automation/handoffs/pre-phase10/ROADMAP.md
T

18 lines
2.8 KiB
Markdown

# Roadmap contract projection
Read from committed codex/autonomous-roadmap-01 policy only. This projection is not a second queue, does not configure execution and does not authorise any stage. The external controller must reconcile its immutable manifest with the final published handoff commit and obtain protected approvals. All current deferrableGates arrays are empty; a conditional status alone cannot advance.
| Sequence / stage | Required predecessor | Additional authority before implementation/advancement |
|---|---|---|
|05 PHASE-10 | Finished pre-Phase10 evidence and exact published baseline | phase10-development-entry; exact unused candidate/consumer/inventory/rollback proof; qualified native sandbox and actual stage test adapter; signed stage-requirements-review. No cleanup started here |
|06 PRODUCT-REVIEW-01 | Accepted Phase10 | Independent review/ranked proposals, then product-ranked-scope approval before resulting implementation scope |
|07 INT-GLOBAL-JOBS-01 | Accepted Product Review, reviewed GJ-00 planning | global-jobs-implementation, product-ranked-scope; provider-licences-and-display-rights before provider checkpoint. Never infer scraping/content rights from technical reachability |
|08 I18N-01 | Accepted Global Jobs | i18n-scope and later human-linguistic-and-market-qualification; coordinate locale/geography/taxonomy and marketing catalogs. Drafts do not enable public locales |
|09 LAUNCH-SITE-01 | Accepted I18N | Four actual design concepts/research, owner homepage-design-selection before implementation, preserved revision feedback; no model-selected final design |
|10 SECURITY-AUDIT-01 | Accepted homepage | security-test-environment-and-scope, isolated-adversarial-targets, significant scanner cost approval where applicable, material-security-findings-disposition and stage review |
|11 RELEASE-READINESS-01 | Accepted security audit | Independent backup/restore/recovery/deployed/security/provider/manual evidence, release-evidence-review and stage review. Recommendation only; this queue has no main merge/deploy stage |
Separately retained initiatives: P5-13/C11 deferred AI model assessment and semantic qualification; LinkedIn feasibility; Android application; staged SQLite retirement; MariaDB upgrade strategy; monitoring/operational improvement; future country integrations. These are tracked future work, not silently completed, deleted or smuggled into cleanup. No MariaDB major upgrade or SQLite retirement is authorised here.
GJ-00 branch planning/int-global-jobs-00 is independently published at0ec9f98e6ed4a646fc5e017d8eb6fade07653f37; it diverges from the later pre-Phase10 integration history. Do not blindly cherry-pick/merge its planning commit. Future authorised integration must reconcile its documents against the accepted current development source and provider evidence freshness, preserving every completed workstream.