Files
jobtrackingapp/docs/redesign/phase-7/COMMITS.md
T

2.0 KiB

Phase 7 — Commit and evidence ledger

Every completed checkpoint or coherent repair is committed and pushed normally to codex/ui-redesign-phase4, with immediate direct remote=HEAD verification. Production main remains 27657f31131cd95d42f0e1290853ec9c9b3959a4; no force push, main push or automatic deployment.

Entry is the completed Phase6 successor receipt b5319981ad3d1bd635daff861453d23c0de5320b. Its historical ledger retains P6-05 4669fb42e604c4728e8c420846ba78f298a8d90c and original runtime provenance. At P7-00 entry, application source was unchanged from P6-03 bd47214bdcd74336788dca0f294b8ddb9403cac1; inherited measured export 2LDblja_XnSBWSuY6ys_V. Later migration rows record their own changed source/build identity.

Logical unit Commit Validation / push receipt
P7-00 inventory, preservation/debt and unchanged-source baseline 27c54146ad6f9059295d169b533db7b1b6689210 P7-00, fresh finite baseline and static checks; inherited runtime explicitly separated. Normal development push verified2026-10-11 14:44:45UTC: localHEAD=origin=live development27c5414; local/origin/live main unchanged27657f3; clean worktree. P7-01 entry dependency satisfied

Hashes and remote receipts are appended by a successor to avoid self-referential commit hashes. Each row records actual commands/results, source scope, remaining conditions, normal push and immediate direct remote identity; partial or blocked evidence is recorded without inventing success. Subsequent receipt metadata is a separately reviewable documentation unit, with its own hash reported after push rather than an endless receipt chain.

Execute the exact approved P7-00…P7-12 plus optional P7-06F from the handoff. Commit boundaries follow owned workflow/consumer scope and preserve concurrent work. No Phase8 dashboard customization, P5-13 qualification/activation or gated production/lifecycle action is implied.