Files
jobtrackingapp/docs/redesign/phase-7/COMMITS.md
T

14 lines
2.0 KiB
Markdown

# Phase 7 — Commit and evidence ledger
Every completed checkpoint or coherent repair is committed and pushed normally to `codex/ui-redesign-phase4`, with immediate direct remote=HEAD verification. Production main remains `27657f31131cd95d42f0e1290853ec9c9b3959a4`; no force push, main push or automatic deployment.
Entry is the completed Phase6 successor receipt `b5319981ad3d1bd635daff861453d23c0de5320b`. Its [historical ledger](../phase-6/COMMITS.md) retains P6-05 `4669fb42e604c4728e8c420846ba78f298a8d90c` and original runtime provenance. At P7-00 entry, application source was unchanged from P6-03 `bd47214bdcd74336788dca0f294b8ddb9403cac1`; inherited measured export `2LDblja_XnSBWSuY6ys_V`. Later migration rows record their own changed source/build identity.
| Logical unit | Commit | Validation / push receipt |
|---|---|---|
| P7-00 inventory, preservation/debt and unchanged-source baseline | `27c54146ad6f9059295d169b533db7b1b6689210` | [P7-00](p7-00/README.md), [fresh finite baseline](p7-00/evidence/baseline.json) and [static checks](p7-00/evidence/static-checks.json); inherited runtime explicitly separated. Normal development push verified2026-10-11 14:44:45UTC: localHEAD=origin=live development27c5414; local/origin/live main unchanged27657f3; clean worktree. P7-01 entry dependency satisfied |
Hashes and remote receipts are appended by a successor to avoid self-referential commit hashes. Each row records actual commands/results, source scope, remaining conditions, normal push and immediate direct remote identity; partial or blocked evidence is recorded without inventing success. Subsequent receipt metadata is a separately reviewable documentation unit, with its own hash reported after push rather than an endless receipt chain.
Execute the exact approved P7-00…P7-12 plus optional P7-06F from [the handoff](../phase-6/p6-05/PHASE7_HANDOFF.md). Commit boundaries follow owned workflow/consumer scope and preserve concurrent work. No Phase8 dashboard customization, P5-13 qualification/activation or gated production/lifecycle action is implied.