Next eligible actions
11 November 2026.
- Phase 10 candidate qualification and independent final-proposal review are complete. Owner decision D02 covers the concrete Conditional GO package published at
59fd674f, retaining inherited qualifications. Keep it queued while independent work continues. Further removal requires its own proven candidate and approval. - Continue approved A3-IM10 from published
d027754doncodex/a3-ui-10. Both existing native discovery specs now pass all11 cases, including the repaired shared confirmation focus. Date-only input/default fixes passed seven cases in each of three timezone processes. Next close remaining route/state and connected-workflow coverage in V06/V07, including correspondence/Settings/import states and actual date-widget browser interaction. Retain source-bound evidence and final Gate F. Do not rerun the accepted11 discovery cases solely to resume. - Continue independently eligible localisation on its isolated branch. The 188 historical dynamic calls are accounted for. Prioritise contextual display coverage and automated locale checks. Native and additional locale publication gates remain open.
- Four desktop/mobile launch concept pairs are published at
ccb11494. Retain owner selection before refinement and final approval before implementation. Release3cca4418includes RR-11/13 fixes and RR-12 post-rollback probes, with six offline rollback/twelve backup tests and corrected legacy-runbook scope. Actual recovery, integrated security and production remain separately gated. - Keep Product Review findings provisional until Phase 10 acceptance. Reuse the published GJ-00 pack. GJ-01 awaits the accepted predecessors, implementation scope and provider rights.
- Continue PERF from the source census and comparable baseline. The reproduced PERF-01-RULES fix is integrated and passed 35 affected backend tests. Measure its steady-state lookup/load tradeoff and failed-save behaviour when the applicable environment is available. Carry the page correspondence delta into isolated MariaDB once the local engine is available. Keep the isolated JobTable split out of A3 until a revised strategy protects the throttled Jobs marker. Keep replica, CDN, production, migrations and protected removal gated.
Use the complete roadmap TODO, the latest checkpoint and branch-specific handoffs to resume. The orchestrator remains paused. Keep pre-p10-ux and unrelated work intact. Publication belongs on the relevant development branch.