17 lines
2.0 KiB
Markdown
17 lines
2.0 KiB
Markdown
# Phase 4 checkpoints
|
|
|
|
Successor: [Phase 5 planning package](../phase-5/README.md) reconciles the conditional acceptance at `2a2f9e4`. Planning only; P5-00 prerequisites precede shell migration and no Phase 5 implementation is started by that package.
|
|
|
|
Phase 4 starts from `f696f23` on `codex/ui-redesign-phase4`. The 57 preservation contracts in [Phase 2](../phase-2/PRESERVATION_MATRIX.md) and the [Phase 3 impact matrix](../phase-3/PRESERVATION_IMPACT_MATRIX.md) remain authoritative.
|
|
|
|
- [P4-01 semantic colors, focus and loaded fixtures](p4-01/README.md)
|
|
- [P4-01 preservation and visual evidence](p4-01/TRACEABILITY.md)
|
|
- [P4-02 named controls and modal state](p4-02/README.md)
|
|
- [P4-03 builder preview keyboard boundary](p4-03/README.md)
|
|
- [P4-04 page layout and typography primitives](p4-04/README.md)
|
|
- [P4-05 table/list density contract](p4-05/README.md)
|
|
- [P4-06 shared validation and Phase 5 gates](p4-06/README.md)
|
|
- [Phase 4 preservation acceptance — all 57 contracts](p4-06/PRESERVATION_ACCEPTANCE.md)
|
|
|
|
P4-02 is locally validated after `115441a` and the separate documentation restructure `682a302` on the same Phase 4 branch. P4-03 follows the P4-02 checkpoint `ebd4a3e`, adding preview keyboard access and preserving focused panes through viewport transitions. P4-04 follows `806eee4e`, introducing opt-in shared page/section typography and layout with Settings as the sole consumer. P4-05 follows `2cdcab9e`, adding opt-in Comfortable/Compact spacing to the existing Jobs/Trash table and phone cards. Its baseline is 916 backend / 354 frontend / 51 actual browser passes plus unchanged P2-D01 expected failure. P4-06 reviews that combined foundation at `c99f4fb7`, with all 57 contracts reconciled and explicit migration gates. Its conditional readiness verdict is not blanket permission for broad migration. No Phase 5 implementation, CV margin/template rendering correction, B07, backend/schema behaviour change or production deployment is included. F04 remains open pending actual production ingress evidence.
|