Files
jobtrackingapp/docs/direct-roadmap/MAXIMUM_BACKLOG_EXECUTION_20261118.md
T

11 KiB
Raw Blame History

Jobjakt — MAXIMUM BACKLOG EXECUTION

Continuous, Parallel, Milestone-Driven Development

I want you to make substantially more progress through the entire Jobjakt development backlog during each execution.

Do not treat a completed checkpoint, commit, test suite or 15-minute work cycle as a reason to stop.

Continue for as long as the current execution environment, usage limits and available authorisation permit.

My objective is to complete as much of the ENTIRE outstanding roadmap as possible, not just a handful of small fixes.

1. Resume from the actual checkpoint

Latest reported remotely verified checkpoints:

  • Application: 1db5f488
  • Roadmap: 271d37d1

Reported verification:

  • 1,665 frontend tests passed.
  • 44 server-backed workflow tests passed.
  • 12 rendered journeys and 12 accessibility scans passed.

First inspect:

  • docs/direct-roadmap/LATEST_CHECKPOINT.md
  • docs/direct-roadmap/ROADMAP_TODO.md
  • docs/direct-roadmap/ROADMAP_STATUS.md
  • Relevant source plans, acceptance documents and implementation records.

Verify the actual Git and worktree state.

Identify completed, partial, blocked and independently eligible work.

Preserve all previous work and accepted evidence.

2. Change execution strategy

Previously, development has often progressed through small individual fixes followed by checkpoint reports.

I now want a more ambitious execution strategy.

Prioritise completing substantial backlog items and entire authorised milestones wherever feasible.

Avoid repeatedly choosing tiny cosmetic or localisation fixes when larger independent functionality is ready.

Do not abandon necessary small fixes, particularly security or data-integrity issues.

Instead, group related changes into coherent implementation packages.

For example:

  • Finish several related A3 workflow gaps together.
  • Implement a meaningful portion of the European localisation infrastructure.
  • Complete several independent performance optimisations.
  • Resolve a group of verified security/dependency problems.
  • Advance a complete Global Job Search architectural increment.

The goal is integrated, functional progress rather than simply increasing the commit count.

3. Execute across the complete roadmap

Work through ALL remaining authorised tasks, including:

Phase 10

Complete independently executable acceptance evidence, preserve the 57 functionality groups and prepare remaining owner decisions.

A3 modernisation

Finish remaining connected workflows, visual consistency, responsiveness, accessibility and error/recovery states.

Progress independently authorised country-aware search, geographic filtering, canonical location models, occupation data and provider-independent functionality.

Respect Phase 10, Product Review, initiative approvals and provider-rights gates. Do not treat previous planning approval as blanket permission for protected implementation.

European localisation

Move beyond EN/NB maintenance.

The objective remains all 24 official EU languages plus the wider approved European scope.

Progress locale infrastructure, translation catalogues, backend localisation, documents, discovery, the homepage, validation tooling and language coverage.

Do not claim locales are complete merely because they have been researched or registered.

Performance

Complete as many of the 18 optimisation areas as justified by evidence.

Prioritise the next eligible performance tasks identified in the continuation record.

Public homepage

Advance authorised design-neutral technical work and eligible implementation, while preserving any outstanding design approval.

Security

Triage and remediate verified issues within authorised scope.

Continue independent security preparation and safe offline checks.

Release readiness

Progress isolated qualification, reproducible builds, operational diagnostics and recovery evidence.

Do not bypass production or formal security gates.

Product Review and technical debt

Complete independent preparatory work where allowed. Respect formal predecessor approvals.

4. Use maximum safe parallelism

Where available, use multiple Codex workers or sub-agents.

I would prefer approximately 3–4 concurrent independent workstreams when the available environment and resources support them.

Possible assignments:

Worker A — Frontend/A3

  • Connected workflows.
  • Visual discrepancies.
  • Accessibility.
  • UI performance.

Worker B — European I18N/Global Jobs

  • Locale architecture.
  • Translation tooling.
  • Geographic infrastructure.
  • Provider-independent discovery.

Worker C — Backend/Performance

  • Database queries.
  • Caching.
  • Pagination.
  • API efficiency.
  • Safe concurrency fixes.

Worker D — Security/Operations

  • Dependency remediation.
  • Offline qualification.
  • Backup/recovery evidence.
  • Operational diagnostics.

These are suggested allocations, not fixed assignments.

Choose tasks according to actual eligibility and dependencies.

Use isolated worktrees or nonconflicting file ownership.

Avoid simultaneous changes to shared mutable databases, schema migrations and common configuration files.

Do not overload the host with unnecessary concurrent builds or tests.

If fewer workers are available, continue sequentially.

Parallelism must improve completed, validated work—not merely produce more branches.

5. Avoid unnecessary repetitive verification

The recent execution ran the full 1,665 frontend tests.

That is valuable acceptance evidence, but I do not want the entire suite unnecessarily rerun after every small, isolated change.

Adopt risk-based verification:

  • Run targeted tests during development.
  • Run affected integration tests for connected changes.
  • Run typecheck/lint/build as appropriate.
  • Run broader regression suites when required by affected scope, integration or authoritative acceptance gates.
  • Reuse valid evidence only when the source and test conditions remain applicable.

Never weaken tests or skip mandatory acceptance requirements.

Use the saved execution time for further implementation.

6. Continuous execution loop

After completing an implementation package:

  1. Verify the work.
  2. Fix introduced regressions.
  3. Commit validated changes.
  4. Publish when available and authorised.
  5. Update the authoritative TODO and continuation checkpoint.
  6. Recalculate the eligible backlog.
  7. Assign the next independent tasks.
  8. Immediately continue implementing them.

Repeat this cycle.

Do not voluntarily end execution merely because a coherent package has been completed.

Do not ask whether I want you to continue.

Do not produce a final handoff after each package unless the environment forces the execution to end.

7. Dependency-aware scheduling

Treat the roadmap as a dependency graph.

Prioritise work that:

  • Removes blockers for other milestones.
  • Improves central user journeys.
  • Resolves confirmed security or integrity defects.
  • Completes partially implemented functionality.
  • Enables European language and market expansion.
  • Provides measurable performance improvements.

If a task is blocked:

  • Record the blocker.
  • Identify the required decision or prerequisite.
  • Preserve current progress.
  • Move to another eligible task.

Do not repeatedly retry the same unchanged external failure.

Do not sit idle waiting for approval while independent work remains.

8. Minimise interruptions

I want minimal human intervention.

Do not ask questions about routine implementation choices already covered by approved plans.

Maintain a consolidated owner-decision register.

When a protected decision is needed:

  • Record the question.
  • Explain the options.
  • Recommend an approach.
  • Identify blocked work.
  • Continue other eligible tasks.

Only present questions when no further authorised independent work remains, except where immediate security or data-loss risks require attention.

Batch questions wherever possible.

Do not self-approve protected gates.

9. Preserve important requirements

All existing application requirements remain active.

In particular:

  • Entirely European product architecture.
  • All 24 EU official languages and broader European scope.
  • Country-aware maps, location filtering and job providers.
  • Clean A3 visual design on desktop and mobile.
  • No excessive nested cards.
  • Full preservation of existing features.
  • Correct tenant/user isolation.
  • Secure authentication and MFA.
  • CV revision and document integrity.
  • Existing PDF acceptance requirements.
  • Correct recovery and backup behaviour.
  • Accessible user journeys.

Do not optimise away features or compromise correctness.

10. Manage execution limits

Use the current session's available execution capacity productively.

Do not artificially stop after a short development interval.

However, do not attempt to bypass platform usage limits, context limits or execution restrictions.

If approaching an unavoidable limit, prioritise preserving recoverable work:

  • Commit complete validated changes.
  • Preserve unfinished files and worktrees.
  • Record incomplete tests.
  • Update the continuation checkpoint.
  • Identify the exact next eligible task.
  • Document any uncommitted or unpublished work.

Do not claim work will automatically continue after a session ends unless an actual supported continuation mechanism is configured.

11. Meaningful progress reporting

Track cumulative progress across the whole roadmap.

For each workstream, report:

  • Outstanding tasks at the start.
  • Tasks completed.
  • Tasks partially completed.
  • Tasks blocked.
  • Actual implemented functionality.
  • Tests and acceptance evidence.
  • Commits and publication status.
  • Next eligible work.

Focus on meaningful milestone completion, not the number of commits or files changed.

Do not claim full acceptance without the corresponding evidence and owner decisions.

12. Non-negotiable restrictions

  • Do not use or reactivate the autonomous orchestrator.
  • Do not merge into main.
  • Do not deploy production.
  • Do not perform destructive migrations without approval.
  • Do not bypass mandatory acceptance or security gates.
  • Do not activate unqualified AI models or unapproved providers.
  • Do not incur external costs without approval.
  • Do not discard uncommitted work.
  • Do not fabricate verification results.

FINAL DIRECTIVE

START MAXIMUM BACKLOG EXECUTION NOW.

I want as much of my entire Jobjakt roadmap implemented as possible.

Use substantial implementation packages rather than unnecessarily small checkpoints.

Run independent workstreams concurrently where safe.

Use targeted verification during development and broader tests at appropriate integration gates.

After every completed package, immediately begin another eligible task.

If one task is blocked, move to another.

Continue until:

  • No further independently authorised useful work remains; or
  • An unavoidable technical or usage limit prevents continuation.

Only then provide a consolidated development report and outstanding owner decisions.

Do not voluntarily finish after 15 minutes or after completing only a few tasks. Keep progressing for as long as you can safely and legitimately execute.