333 lines
11 KiB
Markdown
333 lines
11 KiB
Markdown
# Jobjakt — MAXIMUM BACKLOG EXECUTION
|
||
## Continuous, Parallel, Milestone-Driven Development
|
||
|
||
I want you to make substantially more progress through the entire Jobjakt development backlog during each execution.
|
||
|
||
**Do not treat a completed checkpoint, commit, test suite or 15-minute work cycle as a reason to stop.**
|
||
|
||
Continue for as long as the current execution environment, usage limits and available authorisation permit.
|
||
|
||
My objective is to complete as much of the ENTIRE outstanding roadmap as possible, not just a handful of small fixes.
|
||
|
||
## 1. Resume from the actual checkpoint
|
||
|
||
Latest reported remotely verified checkpoints:
|
||
|
||
- Application: `1db5f488`
|
||
- Roadmap: `271d37d1`
|
||
|
||
Reported verification:
|
||
|
||
- 1,665 frontend tests passed.
|
||
- 44 server-backed workflow tests passed.
|
||
- 12 rendered journeys and 12 accessibility scans passed.
|
||
|
||
First inspect:
|
||
|
||
- `docs/direct-roadmap/LATEST_CHECKPOINT.md`
|
||
- `docs/direct-roadmap/ROADMAP_TODO.md`
|
||
- `docs/direct-roadmap/ROADMAP_STATUS.md`
|
||
- Relevant source plans, acceptance documents and implementation records.
|
||
|
||
Verify the actual Git and worktree state.
|
||
|
||
Identify completed, partial, blocked and independently eligible work.
|
||
|
||
Preserve all previous work and accepted evidence.
|
||
|
||
## 2. Change execution strategy
|
||
|
||
Previously, development has often progressed through small individual fixes followed by checkpoint reports.
|
||
|
||
I now want a more ambitious execution strategy.
|
||
|
||
**Prioritise completing substantial backlog items and entire authorised milestones wherever feasible.**
|
||
|
||
Avoid repeatedly choosing tiny cosmetic or localisation fixes when larger independent functionality is ready.
|
||
|
||
Do not abandon necessary small fixes, particularly security or data-integrity issues.
|
||
|
||
Instead, group related changes into coherent implementation packages.
|
||
|
||
For example:
|
||
|
||
- Finish several related A3 workflow gaps together.
|
||
- Implement a meaningful portion of the European localisation infrastructure.
|
||
- Complete several independent performance optimisations.
|
||
- Resolve a group of verified security/dependency problems.
|
||
- Advance a complete Global Job Search architectural increment.
|
||
|
||
The goal is integrated, functional progress rather than simply increasing the commit count.
|
||
|
||
## 3. Execute across the complete roadmap
|
||
|
||
Work through ALL remaining authorised tasks, including:
|
||
|
||
### Phase 10
|
||
Complete independently executable acceptance evidence, preserve the 57 functionality groups and prepare remaining owner decisions.
|
||
|
||
### A3 modernisation
|
||
Finish remaining connected workflows, visual consistency, responsiveness, accessibility and error/recovery states.
|
||
|
||
### Global Job Search
|
||
Progress independently authorised country-aware search, geographic filtering, canonical location models, occupation data and provider-independent functionality.
|
||
|
||
Respect Phase 10, Product Review, initiative approvals and provider-rights gates. Do not treat previous planning approval as blanket permission for protected implementation.
|
||
|
||
### European localisation
|
||
Move beyond EN/NB maintenance.
|
||
|
||
The objective remains all 24 official EU languages plus the wider approved European scope.
|
||
|
||
Progress locale infrastructure, translation catalogues, backend localisation, documents, discovery, the homepage, validation tooling and language coverage.
|
||
|
||
Do not claim locales are complete merely because they have been researched or registered.
|
||
|
||
### Performance
|
||
Complete as many of the 18 optimisation areas as justified by evidence.
|
||
|
||
Prioritise the next eligible performance tasks identified in the continuation record.
|
||
|
||
### Public homepage
|
||
Advance authorised design-neutral technical work and eligible implementation, while preserving any outstanding design approval.
|
||
|
||
### Security
|
||
Triage and remediate verified issues within authorised scope.
|
||
|
||
Continue independent security preparation and safe offline checks.
|
||
|
||
### Release readiness
|
||
Progress isolated qualification, reproducible builds, operational diagnostics and recovery evidence.
|
||
|
||
Do not bypass production or formal security gates.
|
||
|
||
### Product Review and technical debt
|
||
Complete independent preparatory work where allowed. Respect formal predecessor approvals.
|
||
|
||
## 4. Use maximum safe parallelism
|
||
|
||
Where available, use multiple Codex workers or sub-agents.
|
||
|
||
I would prefer approximately 3–4 concurrent independent workstreams when the available environment and resources support them.
|
||
|
||
Possible assignments:
|
||
|
||
**Worker A — Frontend/A3**
|
||
- Connected workflows.
|
||
- Visual discrepancies.
|
||
- Accessibility.
|
||
- UI performance.
|
||
|
||
**Worker B — European I18N/Global Jobs**
|
||
- Locale architecture.
|
||
- Translation tooling.
|
||
- Geographic infrastructure.
|
||
- Provider-independent discovery.
|
||
|
||
**Worker C — Backend/Performance**
|
||
- Database queries.
|
||
- Caching.
|
||
- Pagination.
|
||
- API efficiency.
|
||
- Safe concurrency fixes.
|
||
|
||
**Worker D — Security/Operations**
|
||
- Dependency remediation.
|
||
- Offline qualification.
|
||
- Backup/recovery evidence.
|
||
- Operational diagnostics.
|
||
|
||
These are suggested allocations, not fixed assignments.
|
||
|
||
Choose tasks according to actual eligibility and dependencies.
|
||
|
||
Use isolated worktrees or nonconflicting file ownership.
|
||
|
||
Avoid simultaneous changes to shared mutable databases, schema migrations and common configuration files.
|
||
|
||
Do not overload the host with unnecessary concurrent builds or tests.
|
||
|
||
If fewer workers are available, continue sequentially.
|
||
|
||
**Parallelism must improve completed, validated work—not merely produce more branches.**
|
||
|
||
## 5. Avoid unnecessary repetitive verification
|
||
|
||
The recent execution ran the full 1,665 frontend tests.
|
||
|
||
That is valuable acceptance evidence, but I do not want the entire suite unnecessarily rerun after every small, isolated change.
|
||
|
||
Adopt risk-based verification:
|
||
|
||
- Run targeted tests during development.
|
||
- Run affected integration tests for connected changes.
|
||
- Run typecheck/lint/build as appropriate.
|
||
- Run broader regression suites when required by affected scope, integration or authoritative acceptance gates.
|
||
- Reuse valid evidence only when the source and test conditions remain applicable.
|
||
|
||
Never weaken tests or skip mandatory acceptance requirements.
|
||
|
||
Use the saved execution time for further implementation.
|
||
|
||
## 6. Continuous execution loop
|
||
|
||
After completing an implementation package:
|
||
|
||
1. Verify the work.
|
||
2. Fix introduced regressions.
|
||
3. Commit validated changes.
|
||
4. Publish when available and authorised.
|
||
5. Update the authoritative TODO and continuation checkpoint.
|
||
6. Recalculate the eligible backlog.
|
||
7. Assign the next independent tasks.
|
||
8. **Immediately continue implementing them.**
|
||
|
||
Repeat this cycle.
|
||
|
||
Do not voluntarily end execution merely because a coherent package has been completed.
|
||
|
||
Do not ask whether I want you to continue.
|
||
|
||
Do not produce a final handoff after each package unless the environment forces the execution to end.
|
||
|
||
## 7. Dependency-aware scheduling
|
||
|
||
Treat the roadmap as a dependency graph.
|
||
|
||
Prioritise work that:
|
||
|
||
- Removes blockers for other milestones.
|
||
- Improves central user journeys.
|
||
- Resolves confirmed security or integrity defects.
|
||
- Completes partially implemented functionality.
|
||
- Enables European language and market expansion.
|
||
- Provides measurable performance improvements.
|
||
|
||
If a task is blocked:
|
||
|
||
- Record the blocker.
|
||
- Identify the required decision or prerequisite.
|
||
- Preserve current progress.
|
||
- Move to another eligible task.
|
||
|
||
Do not repeatedly retry the same unchanged external failure.
|
||
|
||
Do not sit idle waiting for approval while independent work remains.
|
||
|
||
## 8. Minimise interruptions
|
||
|
||
I want minimal human intervention.
|
||
|
||
Do not ask questions about routine implementation choices already covered by approved plans.
|
||
|
||
Maintain a consolidated owner-decision register.
|
||
|
||
When a protected decision is needed:
|
||
|
||
- Record the question.
|
||
- Explain the options.
|
||
- Recommend an approach.
|
||
- Identify blocked work.
|
||
- Continue other eligible tasks.
|
||
|
||
Only present questions when no further authorised independent work remains, except where immediate security or data-loss risks require attention.
|
||
|
||
Batch questions wherever possible.
|
||
|
||
Do not self-approve protected gates.
|
||
|
||
## 9. Preserve important requirements
|
||
|
||
All existing application requirements remain active.
|
||
|
||
In particular:
|
||
|
||
- Entirely European product architecture.
|
||
- All 24 EU official languages and broader European scope.
|
||
- Country-aware maps, location filtering and job providers.
|
||
- Clean A3 visual design on desktop and mobile.
|
||
- No excessive nested cards.
|
||
- Full preservation of existing features.
|
||
- Correct tenant/user isolation.
|
||
- Secure authentication and MFA.
|
||
- CV revision and document integrity.
|
||
- Existing PDF acceptance requirements.
|
||
- Correct recovery and backup behaviour.
|
||
- Accessible user journeys.
|
||
|
||
Do not optimise away features or compromise correctness.
|
||
|
||
## 10. Manage execution limits
|
||
|
||
Use the current session's available execution capacity productively.
|
||
|
||
Do not artificially stop after a short development interval.
|
||
|
||
However, do not attempt to bypass platform usage limits, context limits or execution restrictions.
|
||
|
||
If approaching an unavoidable limit, prioritise preserving recoverable work:
|
||
|
||
- Commit complete validated changes.
|
||
- Preserve unfinished files and worktrees.
|
||
- Record incomplete tests.
|
||
- Update the continuation checkpoint.
|
||
- Identify the exact next eligible task.
|
||
- Document any uncommitted or unpublished work.
|
||
|
||
Do not claim work will automatically continue after a session ends unless an actual supported continuation mechanism is configured.
|
||
|
||
## 11. Meaningful progress reporting
|
||
|
||
Track cumulative progress across the whole roadmap.
|
||
|
||
For each workstream, report:
|
||
|
||
- Outstanding tasks at the start.
|
||
- Tasks completed.
|
||
- Tasks partially completed.
|
||
- Tasks blocked.
|
||
- Actual implemented functionality.
|
||
- Tests and acceptance evidence.
|
||
- Commits and publication status.
|
||
- Next eligible work.
|
||
|
||
Focus on meaningful milestone completion, not the number of commits or files changed.
|
||
|
||
Do not claim full acceptance without the corresponding evidence and owner decisions.
|
||
|
||
## 12. Non-negotiable restrictions
|
||
|
||
- Do not use or reactivate the autonomous orchestrator.
|
||
- Do not merge into `main`.
|
||
- Do not deploy production.
|
||
- Do not perform destructive migrations without approval.
|
||
- Do not bypass mandatory acceptance or security gates.
|
||
- Do not activate unqualified AI models or unapproved providers.
|
||
- Do not incur external costs without approval.
|
||
- Do not discard uncommitted work.
|
||
- Do not fabricate verification results.
|
||
|
||
## FINAL DIRECTIVE
|
||
|
||
**START MAXIMUM BACKLOG EXECUTION NOW.**
|
||
|
||
I want as much of my entire Jobjakt roadmap implemented as possible.
|
||
|
||
Use substantial implementation packages rather than unnecessarily small checkpoints.
|
||
|
||
Run independent workstreams concurrently where safe.
|
||
|
||
Use targeted verification during development and broader tests at appropriate integration gates.
|
||
|
||
After every completed package, immediately begin another eligible task.
|
||
|
||
If one task is blocked, move to another.
|
||
|
||
Continue until:
|
||
|
||
- No further independently authorised useful work remains; or
|
||
- An unavoidable technical or usage limit prevents continuation.
|
||
|
||
Only then provide a consolidated development report and outstanding owner decisions.
|
||
|
||
**Do not voluntarily finish after 15 minutes or after completing only a few tasks. Keep progressing for as long as you can safely and legitimately execute.** |