226 lines
7.5 KiB
Markdown
226 lines
7.5 KiB
Markdown
# Jobjakt — A3 Final Design Approval and Implementation Authorisation
|
|
|
|
I approve **A3 as the final Jobjakt UI/UX design foundation** and authorise its phased implementation across the application.
|
|
|
|
I have reviewed the design direction and am happy with the result.
|
|
|
|
This approval includes the consolidated A3 prototype, its established design system, navigation approach, layouts and connected workflows.
|
|
|
|
## 1. Confirmed design decisions
|
|
|
|
Preserve the approved A3 combination:
|
|
|
|
- Original A1 dashboard.
|
|
- D1 visual foundation.
|
|
- B1 application tracking.
|
|
- Labelled, grouped and collapsible desktop sidebar.
|
|
- Hybrid mobile navigation.
|
|
- CV editor on the left with live preview on the right.
|
|
- Full application-detail pages with contextual information on the right.
|
|
- Optional quick-preview panels.
|
|
- Career Profile overview first, with immediate editing actions.
|
|
- Calendar agenda first, with an optional month view.
|
|
- Automation controls under Settings.
|
|
- Contextual AI assistance.
|
|
- Optional, resumable dashboard onboarding checklist with on-demand walkthroughs.
|
|
|
|
Maintain the selected light/dark visual treatment and consistent responsive behaviour.
|
|
|
|
Do not restart design exploration or generate another five concepts.
|
|
|
|
Minor adjustments for implementation feasibility, accessibility and usability are permitted.
|
|
|
|
Consult me before making substantial changes to the approved visual direction or user journeys.
|
|
|
|
## 2. Implementation approval
|
|
|
|
I authorise the actual implementation of the approved A3 redesign within the appropriate Jobjakt development branches.
|
|
|
|
This includes:
|
|
|
|
- Shared design system.
|
|
- Typography and colours.
|
|
- Navigation.
|
|
- Dashboard.
|
|
- Application tracking.
|
|
- Application details.
|
|
- Job discovery.
|
|
- Career Profile.
|
|
- CV Builder.
|
|
- CV import.
|
|
- Cover letters.
|
|
- Calendar.
|
|
- Correspondence.
|
|
- Documents.
|
|
- Settings.
|
|
- Automation controls.
|
|
- Administration.
|
|
- Onboarding.
|
|
- Mobile layouts.
|
|
- Light/dark modes.
|
|
- Accessibility improvements.
|
|
|
|
The implementation must cover the actual application, not merely reproduce static prototypes.
|
|
|
|
## 3. Preserve existing functionality
|
|
|
|
The design handoff identifies 57 preservation groups and 34 routes.
|
|
|
|
Treat these as mandatory preservation requirements.
|
|
|
|
Do not remove, simplify or hide advanced functionality merely because it was not shown in the prototypes.
|
|
|
|
Preserve:
|
|
|
|
- Existing user data.
|
|
- Career Profile ownership and persistence.
|
|
- CV revisions and undo/redo.
|
|
- Document imports and exports.
|
|
- Application records.
|
|
- Authentication.
|
|
- AI permissions and qualification restrictions.
|
|
- Dashboard customisation.
|
|
- Administrative permissions.
|
|
- Existing integrations.
|
|
- English/Norwegian support.
|
|
- Future European localisation.
|
|
- Database compatibility.
|
|
- Existing accessibility functionality.
|
|
|
|
Maintain all relevant RD21 data-integrity protections.
|
|
|
|
## 4. Implementation sequence
|
|
|
|
Use the implementation milestones documented in the A3 handoff.
|
|
|
|
Subject to the authoritative dependencies and Phase 10 gates, organise implementation approximately as follows:
|
|
|
|
**UI-01 — Shared design system and navigation**
|
|
|
|
Implement foundational styles, typography, components, navigation, themes and responsive structures.
|
|
|
|
**UI-02 — Dashboard and applications**
|
|
|
|
Implement dashboard layouts, interactive widgets, application tracking, Kanban and application-detail experiences.
|
|
|
|
**UI-03 — Career Profile and CV workflows**
|
|
|
|
Implement the approved Career Profile, CV Editor, template, import and cover-letter experiences.
|
|
|
|
**UI-04 — Job discovery and application journeys**
|
|
|
|
Implement approved job-discovery layouts and connections to the existing application workflows.
|
|
|
|
Coordinate with INT-GLOBAL-JOBS-01 to avoid conflicting implementations.
|
|
|
|
**UI-05 — Supporting workflows**
|
|
|
|
Implement calendar, reminders, correspondence, documents, administration, settings and automation controls.
|
|
|
|
**UI-06 — Onboarding and mobile refinement**
|
|
|
|
Complete guided optional onboarding, mobile navigation, small-screen layouts and responsive interaction parity.
|
|
|
|
**UI-07 — Integrated qualification**
|
|
|
|
Run full preservation, accessibility, responsive, browser and application regression acceptance.
|
|
|
|
Use the authoritative A3 implementation plan where it specifies more precise dependencies or acceptance requirements.
|
|
|
|
## 5. Autonomous development
|
|
|
|
Continue working through the implementation milestones without asking me to approve every ordinary change.
|
|
|
|
You may autonomously:
|
|
|
|
- Implement approved designs.
|
|
- Refactor affected frontend components.
|
|
- Introduce reusable design-system components.
|
|
- Improve responsive layouts.
|
|
- Fix implementation defects.
|
|
- Add tests.
|
|
- Update translations.
|
|
- Run regression checks.
|
|
- Commit validated checkpoints.
|
|
- Update documentation.
|
|
|
|
Pause only when a genuine owner decision, mandatory gate or substantial design change is required.
|
|
|
|
If a task is blocked, record the blocker and continue independently eligible work.
|
|
|
|
Do not bypass Phase 10 cleanup approvals, required integration baselines or other authoritative development-entry gates.
|
|
|
|
## 6. Coordinate with the remaining roadmap
|
|
|
|
Continue the existing direct roadmap execution.
|
|
|
|
Do not use the autonomous orchestrator.
|
|
|
|
Coordinate A3 implementation with:
|
|
|
|
- Phase 10.
|
|
- Product Review.
|
|
- International Global Job Search.
|
|
- Full European localisation.
|
|
- Multilingual homepage redesign.
|
|
- Security audit.
|
|
- Release readiness.
|
|
|
|
Avoid duplicate implementations and unnecessary rewrites.
|
|
|
|
Use established accepted baselines, isolated branches and documented dependencies.
|
|
|
|
Do not treat provisional mockup content as actual product functionality.
|
|
|
|
## 7. Validation requirements
|
|
|
|
For each implementation milestone:
|
|
|
|
- Run relevant frontend tests.
|
|
- Run required backend tests where workflows are affected.
|
|
- Validate browser journeys.
|
|
- Validate mobile layouts.
|
|
- Check keyboard accessibility.
|
|
- Check translation behaviour.
|
|
- Check light/dark modes.
|
|
- Test preservation requirements.
|
|
- Compare implementation against the approved A3 design.
|
|
- Record regressions and failures.
|
|
|
|
The prototype validation results are useful design evidence, but they do not qualify the implemented application.
|
|
|
|
Real screen-reader, physical-device and human accessibility tests remain pending until actually completed.
|
|
|
|
Do not claim unperformed tests passed.
|
|
|
|
## 8. Git and release restrictions
|
|
|
|
The latest design checkpoint is `237c79b8`.
|
|
|
|
The roadmap continuation checkpoint is `286535be`.
|
|
|
|
Verify the actual commits, branches and ancestry before integrating work.
|
|
|
|
Preserve the existing worktrees and acceptance records.
|
|
|
|
Keep validated changes in development branches and commit checkpoints.
|
|
|
|
Do not spend time repairing Gitea as part of this design implementation.
|
|
|
|
If publication fails, preserve the local work, record the issue and continue eligible work without falsely claiming publication success.
|
|
|
|
Never merge into main or deploy production without explicit approval.
|
|
|
|
## 9. Final objective
|
|
|
|
Deliver the approved A3 experience throughout the real Jobjakt application.
|
|
|
|
I want a cohesive, modern, approachable and powerful product, with equally strong desktop and mobile experiences.
|
|
|
|
Preserve the application's advanced capabilities while making everyday workflows easier to understand and use.
|
|
|
|
**This is my final approval of the A3 design and authorisation to begin its staged development implementation.**
|
|
|
|
It is not approval for production deployment or for bypassing outstanding security and release gates.
|
|
|
|
Continue with the next authorised implementation milestone, maintaining durable progress reports and proceeding through independently eligible work without unnecessary interruptions. |