Files
jobtrackingapp/docs/direct-roadmap/OWNER_DECISIONS.md
T

31 lines
4.0 KiB
Markdown

# Owner decisions
10 November 2026. The [roadmap TODO](ROADMAP_TODO.md) tracks current work and protected decisions. This record is for direct execution in chat.
## D01 — P10-01 / CLEAN-20
**APPROVED AND EXECUTED.** The owner replied “Approve CLEAN-20 only”. The approval covered the 38-line unimported `job-tracker-ui/src/App.css` at blob `74b5e053450a48a6bdb4d71aad648e7af821975c`. Verification and publication are in [P10-01](../redesign/phase-10/P10-01.md). Another removal needs its own evidence and approval.
## A3 implementation and final visual review
The owner selected A3, approved the implementation and approved progression through IM10. Final IM10 visual acceptance is pending a reviewable whole-application package. Read-only 2FA status and audit redaction are published. Factor recovery, private support access and live diagnostics each retain their separate decision.
## D02 — Phase 10 final bounded milestone
**READY FOR OWNER REVIEW.** Proposal published at `59fd674f4bb1d60939125430fa1d773af7288fcb` on `feature/phase10-cleanup`, with exact remote readback. Review [the acceptance proposal](../redesign/phase-10/ACCEPTANCE_PROPOSAL.md), [57-group disposition](../redesign/phase-10/PRESERVATION_DISPOSITION.json) and [Product Review handoff](../redesign/phase-10/PRODUCT_REVIEW_HANDOFF.md). Independent source review found the candidate requirements satisfied with applicable historical reuse. No additional executable check is established solely for the unserved stylesheet removal.
Recommended decision is CONDITIONAL GO for Phase 10 and the frozen pre-A3 development baseline, conditional Product Review readiness after milestone acceptance and target-baseline reconciliation, and production NO-GO. Retain 56 PARTIAL/C11 DEFERRED, all 34 routes and every inherited human/environment/security/release qualification. Final A3 Gate F is separate. CLEAN-20 implementation approval does not supply this final milestone decision. Continue eligible independent work while this decision is queued.
## Later decisions — not requested prematurely
The owner's full-roadmap addendum authorises ordinary development wherever prerequisites are satisfied, including bounded EN/NB maintenance and approved A3 work. Product-ranked scope, Global Jobs entry and provider licences, additional-locale publication and human language release, homepage design selection, security target/environment and material-risk disposition, and final release approval retain their concrete review gates. Group remaining owner decisions when independent work is exhausted.
| Decision | Options and recommendation | Work held |
| --- | --- | --- |
| Homepage concept selection | Review the four published directions at `ccb11494`. Select or combine elements, then review the refined design. Keep product and pricing claims under their own review. | LAUNCH-02 refinement and later public implementation |
| MFA recovery and private support access | Review the separate technical proposals on the security branch. Prefer user-controlled recovery and explicit, scoped, revocable support consent. Retain present access while decisions are pending. | Factor reset/change workflow and cross-owner private support access |
| Global Jobs entry and rights | Review the accepted predecessor reports and provider rights before approving country/provider scope. Defer capabilities without documented access. | GJ-01 onward and provider activation |
| Isolated diagnostics and recovery rehearsal | Approve a specific disposable target, fixtures and operational acceptance criteria once the plan is ready. Retain production separation. | Real rollback, restore and diagnostic execution |
| Performance infrastructure | Keep the current topology while measurement is incomplete. Compare isolated replica, CDN and pool experiments only against a measured capacity or latency need. | Any external service, paid plan, DNS or production topology change |
| Final qualification | Review the source-bound A3, Phase 10, locale, security and release packages independently at their required gates. | Final milestone and production release decisions |