Phase 10 final milestone proposal

11 November 2026. READY FOR OWNER REVIEW. Final acceptance is pending. This proposal covers the frozen cleanup baseline and approved CLEAN-20 removal. The later A3 integration has its own final Gate F.

Proposed decisions

Decision Proposal Boundary
Phase 10 CONDITIONAL GO Approved cleanup and scoped development verification complete; inherited qualifications retained
Redesign development completion CONDITIONAL GO for the frozen pre-A3 baseline Later A3 implementation and its final review remain separate
PRODUCT-REVIEW-01 readiness CONDITIONAL GO after milestone acceptance Bind the review target explicitly; A3 successor acceptance remains applicable to a review of that successor
Production release NO-GO Existing security, recovery, infrastructure, native, provider and release gates remain open

Accepting this proposal would close the bounded Phase 10 cleanup milestone and permit its development handoff. Additional deletion still requires candidate-specific approval. It grants no provider/model activation, infrastructure execution, main merge or deployment authority.

Source and candidate identity

  • Authoritative Prompt 5 SHA-256 f3d5d183a1cd653aac2207a8435ba95fbb74ef4bb8cc91d605edd959f9f4ec72. Sections 4 and 12 retain PARTIAL/DEFERRED functionality and permit CONDITIONAL GO. Section 10 requires reconciliation of all 57 groups and the handoff.
  • Original docs/redesign/IMPLEMENTATION_PLAN.md, Phase 10 section, requires obsolete-route/caller proof, passing tests and the satisfied functionality inventory.
  • Accepted handoff 5cb903b989742b7a96cb22ddf4c0e24993b18980; frozen application source ba04d817fed26d659bfa2a56b089d6cac851dc34; reviewed cleanup/documentation checkpoint 4e98b2d9e0eaa21de57463de6c4d1b52ee776ca2.
  • Sole product change is removal of the 38-line job-tracker-ui/src/App.css, blob 74b5e053450a48a6bdb4d71aad648e7af821975c. Owner approved “CLEAN-20 only”. Implementation and publication are recorded in P10-01 at 78f7396adb2f1d3452c10e60bc0dbbd3a4a602e4.

Requirement dispositions

Requirement Evidence Disposition
Complete legacy inventory P10-00 covers all 15 source categories and current route/import/configuration/delivery/compatibility consumers SATISFIED for the cleanup inventory
Proven obsolete removal Exact approved blob and independent unused entry/build/delivery proof SATISFIED for CLEAN-20
CV/document consolidation P10-02 retains original/frozen renderers, import paths, revision-safe writers and null-as-inherit settings SATISFIED retain disposition; no extra removal proven
Backend/dependencies/configuration P10-03 retains active services, providers, migrations, locks, tooling and fonts SATISFIED retain disposition; SQLite retirement remains separately gated
Candidate types/lint/build/browser P10-01 fresh typecheck, lint, frontend/API build and five exact EN/NB/theme/responsive browser cases passed PASSED within stated scope
Complete local regression Native 1,448 backend and 1,031 frontend passes at 39aac4f4, independently decoded and reconciled in P10-05 PASSED; selected earlier runs overlap
Browser contracts/accessibility Five candidate cases plus source-bound accepted browser/keyboard/axe evidence REUSE applicable to the unserved stylesheet delta; no new complete-browser execution claimed
MariaDB/sidecar/PDF Independent source/environment/fixture applicability review in P10-05 REUSE original qualifications and approvals; no fresh model, provider or physical-print execution
Security Removed stylesheet is unserved demonstration styling; executable sources, dependencies, ownership, endpoints, data flows and deployment inputs are preserved Candidate-scoped review SATISFIED. Retain inherited conditional security/advisory limits; integrated SECURITY-AUDIT-01 remains open
57 groups / 34 routes Independent membership/source checks plus PRESERVATION_DISPOSITION.json PRESERVED under CLEAN-20, retaining 56 PARTIAL and PRES-C11 DEFERRED
Final decision/handoff This proposal and PRODUCT_REVIEW_HANDOFF.md READY FOR REVIEW; milestone acceptance pending

All 263 indexed historical artifact hashes and 1,279 remaining source hashes were independently matched, with App.css the sole expected missing file. The current canonical preservation register is byte-identical to the accepted handoff, SHA-256 a4c2a5a0244ea89381008218de32daee1f615a250eb3808b60e0ee103c674d4d. The companion disposition preserves each group's source criterion, owner, status and remaining checks. Shared UI groups E01–E09 and the other groups receive no capability acceptance promotion.

The removed file was unbundled. No measured runtime or delivered-build-size gain is claimed. No additional safe deletion was established. Rollback restores that exact blob from the removal's parent, then repeats the affected type/lint/build/browser checks before publication.

Retained qualifications

Carry forward physical phone/tablet, assistive technology, manual contrast, proficient EN/Bokmål and printing checks; generative-model factual accuracy; hosted CI isolation; scoped Python advisory/native-image qualification; actual migration/write recovery, encrypted off-host retrieval and database/files/keys/tombstone restore; deployed TLS/provider identity and final release acceptance. FINAL_DEVELOPMENT_ENTRY.md and the Phase 9 conditional decision bind the historical evidence and existing scoped approvals.

These qualifications remain visible in the handoff. They do not justify rerunning unchanged suites solely to restart the chat, and they do not establish release acceptance. Any relevant successor change refreshes its affected verification and integrated qualification.

Next action is owner review of the four proposed milestone decisions. Independent authorised roadmap work can continue while that review is pending.