Files
jobtrackingapp/docs/redesign/phase-10/ACCEPTANCE_PROPOSAL.md
T

50 lines
5.9 KiB
Markdown
Raw Blame History

This file contains ambiguous Unicode characters
This file contains Unicode characters that might be confused with other characters. If you think that this is intentional, you can safely ignore this warning. Use the Escape button to reveal them.
# Phase 10 final milestone proposal
11 November 2026. **READY FOR OWNER REVIEW. Final acceptance is pending.** This proposal covers the frozen cleanup baseline and approved CLEAN-20 removal. The later A3 integration has its own final Gate F.
## Proposed decisions
| Decision | Proposal | Boundary |
| --- | --- | --- |
| Phase 10 | CONDITIONAL GO | Approved cleanup and scoped development verification complete; inherited qualifications retained |
| Redesign development completion | CONDITIONAL GO for the frozen pre-A3 baseline | Later A3 implementation and its final review remain separate |
| PRODUCT-REVIEW-01 readiness | CONDITIONAL GO after milestone acceptance | Bind the review target explicitly; A3 successor acceptance remains applicable to a review of that successor |
| Production release | NO-GO | Existing security, recovery, infrastructure, native, provider and release gates remain open |
Accepting this proposal would close the bounded Phase 10 cleanup milestone and permit its development handoff. Additional deletion still requires candidate-specific approval. It grants no provider/model activation, infrastructure execution, main merge or deployment authority.
## Source and candidate identity
- Authoritative Prompt 5 SHA-256 `f3d5d183a1cd653aac2207a8435ba95fbb74ef4bb8cc91d605edd959f9f4ec72`. Sections 4 and 12 retain PARTIAL/DEFERRED functionality and permit CONDITIONAL GO. Section 10 requires reconciliation of all 57 groups and the handoff.
- Original `docs/redesign/IMPLEMENTATION_PLAN.md`, Phase 10 section, requires obsolete-route/caller proof, passing tests and the satisfied functionality inventory.
- Accepted handoff `5cb903b989742b7a96cb22ddf4c0e24993b18980`; frozen application source `ba04d817fed26d659bfa2a56b089d6cac851dc34`; reviewed cleanup/documentation checkpoint `4e98b2d9e0eaa21de57463de6c4d1b52ee776ca2`.
- Sole product change is removal of the 38-line `job-tracker-ui/src/App.css`, blob `74b5e053450a48a6bdb4d71aad648e7af821975c`. Owner approved “CLEAN-20 only”. Implementation and publication are recorded in P10-01 at `78f7396adb2f1d3452c10e60bc0dbbd3a4a602e4`.
## Requirement dispositions
| Requirement | Evidence | Disposition |
| --- | --- | --- |
| Complete legacy inventory | P10-00 covers all 15 source categories and current route/import/configuration/delivery/compatibility consumers | SATISFIED for the cleanup inventory |
| Proven obsolete removal | Exact approved blob and independent unused entry/build/delivery proof | SATISFIED for CLEAN-20 |
| CV/document consolidation | P10-02 retains original/frozen renderers, import paths, revision-safe writers and null-as-inherit settings | SATISFIED retain disposition; no extra removal proven |
| Backend/dependencies/configuration | P10-03 retains active services, providers, migrations, locks, tooling and fonts | SATISFIED retain disposition; SQLite retirement remains separately gated |
| Candidate types/lint/build/browser | P10-01 fresh typecheck, lint, frontend/API build and five exact EN/NB/theme/responsive browser cases passed | PASSED within stated scope |
| Complete local regression | Native 1,448 backend and 1,031 frontend passes at `39aac4f4`, independently decoded and reconciled in P10-05 | PASSED; selected earlier runs overlap |
| Browser contracts/accessibility | Five candidate cases plus source-bound accepted browser/keyboard/axe evidence | REUSE applicable to the unserved stylesheet delta; no new complete-browser execution claimed |
| MariaDB/sidecar/PDF | Independent source/environment/fixture applicability review in P10-05 | REUSE original qualifications and approvals; no fresh model, provider or physical-print execution |
| Security | Removed stylesheet is unserved demonstration styling; executable sources, dependencies, ownership, endpoints, data flows and deployment inputs are preserved | Candidate-scoped review SATISFIED. Retain inherited conditional security/advisory limits; integrated SECURITY-AUDIT-01 remains open |
| 57 groups / 34 routes | Independent membership/source checks plus PRESERVATION_DISPOSITION.json | PRESERVED under CLEAN-20, retaining 56 PARTIAL and PRES-C11 DEFERRED |
| Final decision/handoff | This proposal and PRODUCT_REVIEW_HANDOFF.md | READY FOR REVIEW; milestone acceptance pending |
All 263 indexed historical artifact hashes and 1,279 remaining source hashes were independently matched, with App.css the sole expected missing file. The current canonical preservation register is byte-identical to the accepted handoff, SHA-256 `a4c2a5a0244ea89381008218de32daee1f615a250eb3808b60e0ee103c674d4d`. The companion disposition preserves each group's source criterion, owner, status and remaining checks. Shared UI groups E01–E09 and the other groups receive no capability acceptance promotion.
The removed file was unbundled. No measured runtime or delivered-build-size gain is claimed. No additional safe deletion was established. Rollback restores that exact blob from the removal's parent, then repeats the affected type/lint/build/browser checks before publication.
## Retained qualifications
Carry forward physical phone/tablet, assistive technology, manual contrast, proficient EN/Bokmål and printing checks; generative-model factual accuracy; hosted CI isolation; scoped Python advisory/native-image qualification; actual migration/write recovery, encrypted off-host retrieval and database/files/keys/tombstone restore; deployed TLS/provider identity and final release acceptance. `FINAL_DEVELOPMENT_ENTRY.md` and the Phase 9 conditional decision bind the historical evidence and existing scoped approvals.
These qualifications remain visible in the handoff. They do not justify rerunning unchanged suites solely to restart the chat, and they do not establish release acceptance. Any relevant successor change refreshes its affected verification and integrated qualification.
Next action is owner review of the four proposed milestone decisions. Independent authorised roadmap work can continue while that review is pending.