# Partial homepage planning handoff
10 November concept successor. [LAUNCH-01 comparison](DESIGN_CONCEPTS.md) contains four responsive prototypes and eight full-page renders with synthetic development captures and a source manifest. Twenty local browser cases passed. The owner can select or combine directions before LAUNCH-02. Final visual approval, public copy, production rendering and launch acceptance remain separate. Earlier pending statements below describe the previous checkpoint.
10 November: the published A3 landing baseline now supplies 12 rendered navigation states, raw HTML findings and screenshot provenance candidates. See [homepage audit](HOMEPAGE_AUDIT.md). Next, complete the outstanding audit inputs and render the four concept pairs. Final homepage selection, application implementation and launch acceptance retain their separate gates.
Continuation 2 November: CONTENT_ARCHITECTURE.md, INTERNATIONALISATION.md and SEO_STRATEGY.md add independent design-neutral content/routing/publication proposals. Byte-matched existing build-shell evidence confirms raw export lacks descriptive marketing HTML, canonical and hreflang. No public UI/routes/metadata implementation or final visual choice made. These source/build checks are not live SEO, performance or release qualification. The five application UI concepts remain separate from LAUNCH-01's required homepage exploration; no sixth application concept created.
Branch `feature/launch-site-redesign`, baseline `5cb903b989742b7a96cb22ddf4c0e24993b18980`. Documentation-only source audit. LAUNCH-00 remains IN_PROGRESS. LAUNCH-01 four actual desktop/mobile concepts are PENDING, not replaced by written descriptions. No owner design decision requested until reviewable concepts exist.
Next authorised work:
1. Inspect rendered homepage/signup and research contemporary patterns using credible public sources. Preserve existing routing and privacy boundaries.
2. Obtain provenance-bound synthetic screenshots from accepted evidence or an isolated test environment. The committed pre-P10 visual manifest contains real PDF previews/contact sheets, not a complete set of dashboard/CV editor/mobile product captures. Inspect any image before reuse; do not touch the separate pre-p10-ux worktree.
3. Produce four distinct, viewable desktop/mobile concepts and an asset/licence manifest. No external image/font acquisition without appropriate rights. Concept placeholders cannot be represented as real application screenshots.
4. Present concrete concepts for mix-and-match owner feedback, then stop final implementation until explicit final-design approval. Design approval does not authorise publication.
No assets, app code, tests, routes, packages, production services or authenticated dashboard were changed. Rendered/browser/performance/accessibility/SEO checks NOT RUN. No production feature/pricing/language availability was asserted.
The delegated design task stopped at a service usage limit before saving deliverables. Parent continued the source audit and preserved this checkpoint. No design agent is running in the background.